16 permits since 2000: 13 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2024 | Completed final sign-off Apr 2025 | 145 Gardenside Dr | kitchen and bath remodel like kind cabinets, new counter, new floor, new vanity.Details
kitchen and bath remodel like kind cabinets, new counter, new floor, new vanity. | $10,000 |
| Feb 26, 2024 | Completed final sign-off Sep 2024 | 145 Gardenside Dr | replace windows like kind, at rear, 4 total,- not visible from street; same size, same locations, max u-factor 0.30.Details
replace windows like kind, at rear, 4 total,- not visible from street; same size, same locations, max u-factor 0.30. | $2,000 |
| Sep 1, 2023 | Completed final sign-off Feb 2025 | 145 Gardenside Dr | unit #12: kitchen and bath remodel. we have already recd electrical and plumbing permit.Details
unit #12: kitchen and bath remodel. we have already recd electrical and plumbing permit. | $18,000 |
| Jun 9, 2021 | Completed final sign-off Oct 2021 | 1932 16th Av | new cappng to exiting foundation at under the (e) exterior stairs and front corner of the house. replacing (e) 4" concrete slab at exterior corridor. replace in-kind (6) existing windows at front - visible from st.Details
new cappng to exiting foundation at under the (e) exterior stairs and front corner of the house. replacing (e) 4" concrete slab at exterior corridor. replace in-kind (6) existing windows at front - visible from st. | $12,000 |
| Aug 9, 2019 | Never finaled issued Jun 2020, no final | 780 Post St | to comply with nov issued by housing, elevator alteration: replace drive machine, overhead sheaves, governor, controller, etc. tie into/upgrade fire life safety system per code under separate permit. upgreade elec. service as req. under seperate permit.Details
to comply with nov issued by housing, elevator alteration: replace drive machine, overhead sheaves, governor, controller, etc. tie into/upgrade fire life safety system per code under separate permit. upgreade elec. service as req. under seperate permit. | $50,000 |
| May 26, 2017 | Completed final sign-off Nov 2017 | 348 Locust St | soft story upgrade, 2016 cebc appendix a-4Details
soft story upgrade, 2016 cebc appendix a-4 | $39,000 |
| May 28, 2013 | Completed final sign-off Nov 2013 | 937 Clay St | to comply with ordinance 029-13 only. installation of grab bars in sro. floor 2, 3 & 4 bathroom.Details
to comply with ordinance 029-13 only. installation of grab bars in sro. floor 2, 3 & 4 bathroom. | $1,800 |
| Oct 6, 2008 | Completed final sign-off Nov 2008 | 1253 19th Av | work on unit#3. increase project cost to $35,000.00 . increased by $15,000.00 revision app#200808149208.Details
work on unit#3. increase project cost to $35,000.00 . increased by $15,000.00 revision app#200808149208. | $15,000 |
| Aug 14, 2008 | Completed final sign-off Nov 2008 | 1253 19th Av | work @ unit# 3 only. repair fire damage, new windows, like for like, new 1 kitchen cabinets, sink, 1 new vanity toilet & tub, sheetrock, clean up & paint, new doors. no structural change.Details
work @ unit# 3 only. repair fire damage, new windows, like for like, new 1 kitchen cabinets, sink, 1 new vanity toilet & tub, sheetrock, clean up & paint, new doors. no structural change. | $20,000 |
| Feb 20, 2008 | Completed final sign-off Mar 2008 | 1840 Taraval St | replace stucco new lath in front of building. to comply with complaint #200731256Details
replace stucco new lath in front of building. to comply with complaint #200731256 | $5,000 |
| Nov 13, 2007 | Completed final sign-off Apr 2008 | 348 Locust St | repair rear stairs less than 50% . change damages materials with like kind. to comply w/compl#200726521. (inspector in field to verify repair is less than 50%).Details
repair rear stairs less than 50% . change damages materials with like kind. to comply w/compl#200726521. (inspector in field to verify repair is less than 50%). | $5,000 |
| Apr 28, 2004 | Completed final sign-off Sep 2008 | 1922 Larkin St | install new elevator shaft. in fill lightwell for shaft.Details
install new elevator shaft. in fill lightwell for shaft. | $20,000 |
| Nov 27, 2002 | Expired or cancelled cancelled Oct 2003 | 1990 Newcomb Av | revision to app #200103073711/ 1hour rated wall/studs to be 24" o.c.Details
revision to app #200103073711/ 1hour rated wall/studs to be 24" o.c. | $2,000 |
| May 10, 2002 | Expired or cancelled expired Apr 2004 | 750 Phelps St | frp strl framing & platform (for pa #9914374)Details
frp strl framing & platform (for pa #9914374) | $30,275 |
| Jul 23, 2001 | Completed final sign-off Oct 2001 | 2760 San Bruno Av | repair existing decking remove dry rotted structural members & replace w/ pressure treated redwood lDetails
repair existing decking remove dry rotted structural members & replace w/ pressure treated redwood l | $3,500 |
| Mar 5, 2001 | Completed final sign-off Sep 2001 | 260 Golden Gate Av | install of life safety system work to include:smoke dectectors, heat dectectors, duct detectors,Details
install of life safety system work to include:smoke dectectors, heat dectectors, duct detectors, | $85,000 |