Block 5618, lot 009
120 Elsie St
- City’s use
- Single Family Residential
- Built
- 1977
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,000 sq ft
- Lot
- 1,750 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 25, 2024 | Completed final sign-off Nov 2024 | 120 Elsie St | Hoang General Construction | 2nd/f renovation of e) primary bedroom & bath (no exteriro work, no structural) 2nd/f area of remodel 375 sfDetails
2nd/f renovation of e) primary bedroom & bath (no exteriro work, no structural) 2nd/f area of remodel 375 sf | $22,000 |
| Jun 12, 2019 | Never finaled issued Jun 2019, no final | 120 Elsie St | street spaceDetails
street space | ||
| Jan 15, 2019 | Completed final sign-off Dec 2021 | 120 Elsie St | Bay Area Window Pros | replace (11) windows and (3) sliding doors to aluminum frame windows and doors. front windows to be casements and fixed (center) in existing openings. u factor max 0.53 max.Details
replace (11) windows and (3) sliding doors to aluminum frame windows and doors. front windows to be casements and fixed (center) in existing openings. u factor max 0.53 max. | $25,000 |
| Aug 4, 2011 | Completed final sign-off Aug 2011 | 120 Elsie St | San Francisco Summit Roofing | reroofingDetails
reroofing | $5,200 |
| Apr 1, 2011 | Completed final sign-off Jul 2011 | 120 Elsie St | Guilfoyle Construction | hardwood floors in five rooms. sheetrock in kitchen plus one family room, one bedroom, repair to interior toilet & vanity in second bathroom. revision to (e) permit appl. #201101258993.Details
hardwood floors in five rooms. sheetrock in kitchen plus one family room, one bedroom, repair to interior toilet & vanity in second bathroom. revision to (e) permit appl. #201101258993. | $12,000 |
| Mar 15, 2011 | Expired or cancelled cancelled Jan 2026 | 120 Elsie St | Guilfoyle Construction | revision to appl #201101258993 - replace existing rotted deck at rear, no difference in size or sq ft, remodel of second bathroom, new floor tile, toilet, vanity @ intermediate level, new electrical, ceiling cans, new gas furnace, replacement in kind, wrap existing ducting, no new ducting.Details
revision to appl #201101258993 - replace existing rotted deck at rear, no difference in size or sq ft, remodel of second bathroom, new floor tile, toilet, vanity @ intermediate level, new electrical, ceiling cans, new gas furnace, replacement in kind, wrap existing ducting, no new ducting. | $8,500 |
| Jan 25, 2011 | Completed final sign-off Jul 2011 | 120 Elsie St | Guilfoyle Construction | repairs to 2 decks less than 50% interior metal handrails part remodel of one bathroom, new tile on floor plus new tub, tile work in entry hallway. new cabinets in kitchen (replacement in kind). no lighting change. no new walls. no structural.Details
repairs to 2 decks less than 50% interior metal handrails part remodel of one bathroom, new tile on floor plus new tub, tile work in entry hallway. new cabinets in kitchen (replacement in kind). no lighting change. no new walls. no structural. | $26,000 |
| Dec 10, 2002 | Completed final sign-off Mar 2003 | 120 Elsie St | to comply w/nov comp 200235354; to remove door at stairwayDetails
to comply w/nov comp 200235354; to remove door at stairway | $500 | |
| Aug 15, 2002 | Completed final sign-off Oct 2002 | 120 Elsie St | revision to pa 200205227171Details
revision to pa 200205227171 | ||
| May 22, 2002 | Completed final sign-off Oct 2002 | 120 Elsie St | resubmit rev. 1 for appl#200203191736 deletes paving not to undermine (e) grade beamsDetails
resubmit rev. 1 for appl#200203191736 deletes paving not to undermine (e) grade beams | $800 | |
| May 15, 2002 | Completed final sign-off Nov 2002 | 120 Elsie St | Automatic Garage Door | replacement of existing wooden, sectional garage door, electric garage door opener,track, & hardwareDetails
replacement of existing wooden, sectional garage door, electric garage door opener,track, & hardware | $1,500 |
| Mar 22, 2002 | Completed final sign-off Nov 2002 | 120 Elsie St | remove kchn stove in 2nd unit and revert to single family homeDetails
remove kchn stove in 2nd unit and revert to single family home | $400 | |
| Mar 19, 2002 | Completed final sign-off Oct 2002 | 120 Elsie St | new stairs and patios to replace existing rotted stair and non conforming deck to mitigate nov/obtaiDetails
new stairs and patios to replace existing rotted stair and non conforming deck to mitigate nov/obtai | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Guilfoyle Construction (3), Automatic Garage Door, Bay Area Window Pros, Hoang General Construction, San Francisco Summit Roofing
- Architects
- Curtis Hollenbeck
- Engineers
- David Crestfield
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.