Guilfoyle Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Dec 2025
- Last 24 months
- 1 permit filed
29 permits since 2000: 24 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2025 | In progress issued Mar 2026 | 1350 Waller St | two bathrooms code upgrade in portion of existing church. ref permit 202212218851Details
two bathrooms code upgrade in portion of existing church. ref permit 202212218851 | $45,000 |
| Jun 18, 2021 | Completed final sign-off Jun 2022 | 1390 Waller St | one bathroom remodel. no walls will be moved. new toilet tub/shower hand basin. new shower surrounded. new floor covering. paint. no new wall & no existing wall relocation. electrical, plumbing by others. new lighting shall comply with cec (50.0 (k) 5.Details
one bathroom remodel. no walls will be moved. new toilet tub/shower hand basin. new shower surrounded. new floor covering. paint. no new wall & no existing wall relocation. electrical, plumbing by others. new lighting shall comply with cec (50.0 (k) 5. | $35,000 |
| Feb 16, 2021 | Never finaled issued Feb 2021, no final | 425 Hugo St | repair to rear deck. replace damaged/rotted joists. new trex decking. new 2x2 redwood pickets. approx 150 sqft in area. no change to joists & post.Details
repair to rear deck. replace damaged/rotted joists. new trex decking. new 2x2 redwood pickets. approx 150 sqft in area. no change to joists & post. | $14,000 |
| Jan 16, 2020 | Completed final sign-off May 2021 | 1354 Waller St | retrofit garage, remodel kitchen and bath. new electrical throughout house, new plumbing for bath/kitchen. paint interior refinish hardwood floors. remodel in same location. no alteration moving of wallsDetails
retrofit garage, remodel kitchen and bath. new electrical throughout house, new plumbing for bath/kitchen. paint interior refinish hardwood floors. remodel in same location. no alteration moving of walls | $140,000 |
| Jan 30, 2018 | Completed final sign-off May 2018 | 1234 31st Av | to obtain a final inspection for work already approved under pa# 201206041812 & 201210142448, all work is completeDetails
to obtain a final inspection for work already approved under pa# 201206041812 & 201210142448, all work is complete | |
| Jun 13, 2016 | Completed final sign-off Oct 2017 | 3225 20th St | replace e entry stair, garage door, 3 street facing windows, sewer repairs, minor electrical. replace side entrance doorDetails
replace e entry stair, garage door, 3 street facing windows, sewer repairs, minor electrical. replace side entrance door | $65,000 |
| Aug 12, 2015 | Completed final sign-off Jun 2016 | 1268 06th Av | partial remodel new counter top for existing new cabinets. for new cabinets leftside. two up, two down. four back new hood over existing stove. redo floors with vinyle in kitchen/break fast room. 6 new outlets and two switches, new copper hot/cold from basement, new sink/faucet. paint, no change onDetails
partial remodel new counter top for existing new cabinets. for new cabinets leftside. two up, two down. four back new hood over existing stove. redo floors with vinyle in kitchen/break fast room. 6 new outlets and two switches, new copper hot/cold from basement, new sink/faucet. paint, no change on | $29,000 |
| Dec 2, 2014 | Completed final sign-off Dec 2015 | 107 Stanyan St | remodel sw quadrant of garage, adding office/den, full bath and laundry area. remove back door and combine 2 existing windows into one larger window.Details
remodel sw quadrant of garage, adding office/den, full bath and laundry area. remove back door and combine 2 existing windows into one larger window. | $20,000 |
| Jun 26, 2014 | Completed final sign-off Jul 2014 | 147 Charles St | revision to appl #2014.0318.1016 -remove proposed bedroom & replace as storage due to insufficient ceiling height per bldg inspector. no work to be performed.Details
revision to appl #2014.0318.1016 -remove proposed bedroom & replace as storage due to insufficient ceiling height per bldg inspector. no work to be performed. | |
| Mar 18, 2014 | Completed final sign-off Jul 2014 | 147 Charles St | gr fl inprovements, new bedroom, remodeled bath, window replacement in new bedroom, new small utility sink in workshop area. includes minor electrical and plumbing upgradesDetails
gr fl inprovements, new bedroom, remodeled bath, window replacement in new bedroom, new small utility sink in workshop area. includes minor electrical and plumbing upgrades | $30,000 |
| May 20, 2011 | Completed final sign-off Sep 2011 | 1236 06th Av | voluntary seismic upgrade in basement including bolting, shear on walls @ ceiling simpson strongwall at front of bldg, new footings at four separate sectionswallboard, holddowns.Details
voluntary seismic upgrade in basement including bolting, shear on walls @ ceiling simpson strongwall at front of bldg, new footings at four separate sectionswallboard, holddowns. | $25,000 |
| Apr 1, 2011 | Completed final sign-off Jul 2011 | 120 Elsie St | hardwood floors in five rooms. sheetrock in kitchen plus one family room, one bedroom, repair to interior toilet & vanity in second bathroom. revision to (e) permit appl. #201101258993.Details
hardwood floors in five rooms. sheetrock in kitchen plus one family room, one bedroom, repair to interior toilet & vanity in second bathroom. revision to (e) permit appl. #201101258993. | $12,000 |
| Mar 15, 2011 | Expired or cancelled cancelled Jan 2026 | 120 Elsie St | revision to appl #201101258993 - replace existing rotted deck at rear, no difference in size or sq ft, remodel of second bathroom, new floor tile, toilet, vanity @ intermediate level, new electrical, ceiling cans, new gas furnace, replacement in kind, wrap existing ducting, no new ducting.Details
revision to appl #201101258993 - replace existing rotted deck at rear, no difference in size or sq ft, remodel of second bathroom, new floor tile, toilet, vanity @ intermediate level, new electrical, ceiling cans, new gas furnace, replacement in kind, wrap existing ducting, no new ducting. | $8,500 |
| Jan 25, 2011 | Completed final sign-off Jul 2011 | 120 Elsie St | repairs to 2 decks less than 50% interior metal handrails part remodel of one bathroom, new tile on floor plus new tub, tile work in entry hallway. new cabinets in kitchen (replacement in kind). no lighting change. no new walls. no structural.Details
repairs to 2 decks less than 50% interior metal handrails part remodel of one bathroom, new tile on floor plus new tub, tile work in entry hallway. new cabinets in kitchen (replacement in kind). no lighting change. no new walls. no structural. | $26,000 |
| Jul 12, 2010 | Completed final sign-off Oct 2010 | 176 Downey St | new retaining wall to replace existing one at back property line. incl. rebar, poured concrete. no changes to height or width of wall. retaining wall not visible from street, height of retaining wall approx. 5 feet.Details
new retaining wall to replace existing one at back property line. incl. rebar, poured concrete. no changes to height or width of wall. retaining wall not visible from street, height of retaining wall approx. 5 feet. | $18,000 |
| Jul 8, 2010 | Completed final sign-off Sep 2010 | 794 44th Av | dry rot repairs- replace stucco on three side of corner building. 3 layers of jumbo tex, 17 gauge stucco mesh- prime paint. no changes to (e) window and doors - corner bldg. no replacement of wood sheathing.Details
dry rot repairs- replace stucco on three side of corner building. 3 layers of jumbo tex, 17 gauge stucco mesh- prime paint. no changes to (e) window and doors - corner bldg. no replacement of wood sheathing. | $17,500 |
| Jun 24, 2010 | Completed final sign-off Jul 2010 | 129 Santa Ynez Av | replace existing siding on front ot property. (300 sf) with hardi plank (200 sf) and cedar shingles 100 sfDetails
replace existing siding on front ot property. (300 sf) with hardi plank (200 sf) and cedar shingles 100 sf | $8,000 |
| Mar 22, 2010 | Completed final sign-off Oct 2010 | 642 Capp St | revision to appl #200910229541: foundation for deck revised.Details
revision to appl #200910229541: foundation for deck revised. | |
| Feb 19, 2009 | Completed final sign-off May 2009 | 1412 06th Av | repair to existing footing at right side of garage door, new footing & new supports, voluntary add new footing, 2x6 wall, shearwall hd & hold downs to front left side of basement behind front steps.Details
repair to existing footing at right side of garage door, new footing & new supports, voluntary add new footing, 2x6 wall, shearwall hd & hold downs to front left side of basement behind front steps. | $15,000 |
| Sep 3, 2008 | Completed final sign-off Dec 2008 | 1236 06th Av | kitchen bathroom & living rm remodel (all work unit #4), replace kitchen cabinets, stove, etc new electrical in kitchen bathroom & living rm, new plumbing in kitchen, not moving walls/same size, bathrm ceiling & elec workDetails
kitchen bathroom & living rm remodel (all work unit #4), replace kitchen cabinets, stove, etc new electrical in kitchen bathroom & living rm, new plumbing in kitchen, not moving walls/same size, bathrm ceiling & elec work | $18,000 |
| Mar 4, 2008 | Completed final sign-off Apr 2008 | 4312 Kirkham St | dry rot repair/replace siding (v grove) to front exterior of property, 200 sq ft. no alterations other than siding, no structuralDetails
dry rot repair/replace siding (v grove) to front exterior of property, 200 sq ft. no alterations other than siding, no structural | $7,000 |
| Oct 23, 2007 | Completed final sign-off Oct 2007 | 2936 Lyon St | provide complying handrail at stairway to basment. plus handrail. comply with 3r-report-4972.Details
provide complying handrail at stairway to basment. plus handrail. comply with 3r-report-4972. | $1,500 |
| Aug 17, 2007 | Completed final sign-off Aug 2007 | 1236 06th Av | renew expired appl 200509163150 for final inspection.Details
renew expired appl 200509163150 for final inspection. | |
| Jun 19, 2007 | Completed final sign-off Aug 2007 | 34 Short St | dry rot repair to front of house 10 sq. ft. stucco to stucco.Details
dry rot repair to front of house 10 sq. ft. stucco to stucco. | $3,000 |
| Dec 4, 2006 | Completed final sign-off Aug 2007 | 2936 Lyon St | partial voluntary seismic strengthening at 1st floor retail space. provide accessible bathroom by entry door. mechanical and lighting under seperate permit. (diaphragm strengthening is not included in the scope of work).Details
partial voluntary seismic strengthening at 1st floor retail space. provide accessible bathroom by entry door. mechanical and lighting under seperate permit. (diaphragm strengthening is not included in the scope of work). | $50,000 |
| Aug 30, 2006 | Completed final sign-off Apr 2007 | 2936 Lyon St | clean up unit. remove debrit. repair to walls. floors. rehang doors and wndws. minor paintingDetails
clean up unit. remove debrit. repair to walls. floors. rehang doors and wndws. minor painting | $5,000 |
| Aug 24, 2006 | Completed final sign-off Sep 2006 | 1231 44th Av | bolt 25 foot section at basement level. repair approx 200 sq ft of dryrot right side wall. hot dipped ealvanized rod. epoxy 7 in embedment 32".Details
bolt 25 foot section at basement level. repair approx 200 sq ft of dryrot right side wall. hot dipped ealvanized rod. epoxy 7 in embedment 32". | $3,000 |
| Sep 16, 2005 | Expired or cancelled expired Aug 2007 | 1236 06th Av | replace existing wood beam by steel beam in garate, remove post, and grade beam, move partiiton wallDetails
replace existing wood beam by steel beam in garate, remove post, and grade beam, move partiiton wall | $18,000 |
| Jun 22, 2005 | Never finaled issued Jun 2005, no final | 1334 29th Av | repair dry rot damage in basement, 12-15 studs,repair or replaceDetails
repair dry rot damage in basement, 12-15 studs,repair or replace | $3,000 |