Back to kitchen remodel contractors
Guilfoyle Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Dec 2025
- Last 24 months
- 1 permit filed
29 permits since 2000: 24 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 16, 2020 | Completed final sign-off May 2021 | 1354 Waller St | retrofit garage, remodel kitchen and bath. new electrical throughout house, new plumbing for bath/kitchen. paint interior refinish hardwood floors. remodel in same location. no alteration moving of wallsDetails
retrofit garage, remodel kitchen and bath. new electrical throughout house, new plumbing for bath/kitchen. paint interior refinish hardwood floors. remodel in same location. no alteration moving of walls | $140,000 |
| Aug 12, 2015 | Completed final sign-off Jun 2016 | 1268 06th Av | partial remodel new counter top for existing new cabinets. for new cabinets leftside. two up, two down. four back new hood over existing stove. redo floors with vinyle in kitchen/break fast room. 6 new outlets and two switches, new copper hot/cold from basement, new sink/faucet. paint, no change onDetails
partial remodel new counter top for existing new cabinets. for new cabinets leftside. two up, two down. four back new hood over existing stove. redo floors with vinyle in kitchen/break fast room. 6 new outlets and two switches, new copper hot/cold from basement, new sink/faucet. paint, no change on | $29,000 |
| Apr 1, 2011 | Completed final sign-off Jul 2011 | 120 Elsie St | hardwood floors in five rooms. sheetrock in kitchen plus one family room, one bedroom, repair to interior toilet & vanity in second bathroom. revision to (e) permit appl. #201101258993.Details
hardwood floors in five rooms. sheetrock in kitchen plus one family room, one bedroom, repair to interior toilet & vanity in second bathroom. revision to (e) permit appl. #201101258993. | $12,000 |
| Jan 25, 2011 | Completed final sign-off Jul 2011 | 120 Elsie St | repairs to 2 decks less than 50% interior metal handrails part remodel of one bathroom, new tile on floor plus new tub, tile work in entry hallway. new cabinets in kitchen (replacement in kind). no lighting change. no new walls. no structural.Details
repairs to 2 decks less than 50% interior metal handrails part remodel of one bathroom, new tile on floor plus new tub, tile work in entry hallway. new cabinets in kitchen (replacement in kind). no lighting change. no new walls. no structural. | $26,000 |
| Sep 3, 2008 | Completed final sign-off Dec 2008 | 1236 06th Av | kitchen bathroom & living rm remodel (all work unit #4), replace kitchen cabinets, stove, etc new electrical in kitchen bathroom & living rm, new plumbing in kitchen, not moving walls/same size, bathrm ceiling & elec workDetails
kitchen bathroom & living rm remodel (all work unit #4), replace kitchen cabinets, stove, etc new electrical in kitchen bathroom & living rm, new plumbing in kitchen, not moving walls/same size, bathrm ceiling & elec work | $18,000 |