Guilfoyle Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Dec 2025
- Last 24 months
- 1 permit filed
29 permits since 2000: 24 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2021 | Never finaled issued Feb 2021, no final | 425 Hugo St | repair to rear deck. replace damaged/rotted joists. new trex decking. new 2x2 redwood pickets. approx 150 sqft in area. no change to joists & post.Details
repair to rear deck. replace damaged/rotted joists. new trex decking. new 2x2 redwood pickets. approx 150 sqft in area. no change to joists & post. | $14,000 |
| Mar 15, 2011 | Expired or cancelled cancelled Jan 2026 | 120 Elsie St | revision to appl #201101258993 - replace existing rotted deck at rear, no difference in size or sq ft, remodel of second bathroom, new floor tile, toilet, vanity @ intermediate level, new electrical, ceiling cans, new gas furnace, replacement in kind, wrap existing ducting, no new ducting.Details
revision to appl #201101258993 - replace existing rotted deck at rear, no difference in size or sq ft, remodel of second bathroom, new floor tile, toilet, vanity @ intermediate level, new electrical, ceiling cans, new gas furnace, replacement in kind, wrap existing ducting, no new ducting. | $8,500 |
| Jan 25, 2011 | Completed final sign-off Jul 2011 | 120 Elsie St | repairs to 2 decks less than 50% interior metal handrails part remodel of one bathroom, new tile on floor plus new tub, tile work in entry hallway. new cabinets in kitchen (replacement in kind). no lighting change. no new walls. no structural.Details
repairs to 2 decks less than 50% interior metal handrails part remodel of one bathroom, new tile on floor plus new tub, tile work in entry hallway. new cabinets in kitchen (replacement in kind). no lighting change. no new walls. no structural. | $26,000 |
| Mar 22, 2010 | Completed final sign-off Oct 2010 | 642 Capp St | revision to appl #200910229541: foundation for deck revised.Details
revision to appl #200910229541: foundation for deck revised. |