Block 0115, lot 018
462 Green St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 3,930 sq ft
- Lot
- 1,424 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2023 | Completed final sign-off Dec 2023 | 462 Green St | Turnd Inc. | repair 4 story stairway in kind - less than 50% of the total structureDetails
repair 4 story stairway in kind - less than 50% of the total structure | $100,000 |
| Jul 20, 2023 | Completed final sign-off Aug 2024 | 462 Green St | San Francisco Fire Protection | verify sound levels in sleeping areas comply w/ sffc 1103.7.6.1. indicating dba reading are at least 75dba.Details
verify sound levels in sleeping areas comply w/ sffc 1103.7.6.1. indicating dba reading are at least 75dba. | $100 |
| Dec 3, 2019 | Never finaled issued Dec 2019, no final | 462 Green St | street spaceDetails
street space | ||
| Oct 29, 2019 | Completed final sign-off Feb 2020 | 462 Green St | F D C Construction Inc | revision to pa 2019-0319-5622 - adjust window size @ front facade to match field condition; add furring @ adu to maintain 8% exposure requirement ; extend wall @ kitchen/main room & add door for gass range sep req; modify entry to accomodate gas line; remove door @ laundry; add window; 201(e)Details
revision to pa 2019-0319-5622 - adjust window size @ front facade to match field condition; add furring @ adu to maintain 8% exposure requirement ; extend wall @ kitchen/main room & add door for gass range sep req; modify entry to accomodate gas line; remove door @ laundry; add window; 201(e) | $1,000 |
| Oct 4, 2019 | Completed final sign-off Aug 2024 | 462 Green St | San Francisco Fire Protection | due to remodel basemnt, add new unit and laundry rm, 1 sounder install in adu, 1 hornstrobe laundry rm. monitor modules tie in new flow and tamper t e panel 201903195622, 201909262844, 201811307120Details
due to remodel basemnt, add new unit and laundry rm, 1 sounder install in adu, 1 hornstrobe laundry rm. monitor modules tie in new flow and tamper t e panel 201903195622, 201909262844, 201811307120 | $2,000 |
| Sep 26, 2019 | Never finaled issued Sep 2019, no final | 462 Green St | Cj Plumbing | install the fire sprinkler system per npfa 13 under ref 20191013195622r1 in basement onlyDetails
install the fire sprinkler system per npfa 13 under ref 20191013195622r1 in basement only | $5,000 |
| Jun 5, 2019 | Completed final sign-off Feb 2020 | 462 Green St | F D C Construction Inc | structural alterations associaged with new adu unit (submitted under sep permit) including lowering slab 6" raise stair landing for headroom, provide framing for larger window, provide subsurface drainage, (adu/soft story sep permit)Details
structural alterations associaged with new adu unit (submitted under sep permit) including lowering slab 6" raise stair landing for headroom, provide framing for larger window, provide subsurface drainage, (adu/soft story sep permit) | $15,000 |
| Jun 3, 2019 | Never finaled issued Jun 2019, no final | 462 Green St | street spaceDetails
street space | ||
| Apr 22, 2019 | Completed final sign-off Jul 2019 | 462 Green St | F D C Construction Inc | repair < 50% landings of egress stairs at side. no other work.Details
repair < 50% landings of egress stairs at side. no other work. | $19,500 |
| Apr 17, 2019 | Completed final sign-off Jul 2019 | 462 Green St | F D C Construction Inc | minor alterations & repairs to ground floor (basement). work includes in kind replacement of stairs from basement to 1st fl; exit deck repairs, shifting of passageway door to provide clearance and slab replacement.Details
minor alterations & repairs to ground floor (basement). work includes in kind replacement of stairs from basement to 1st fl; exit deck repairs, shifting of passageway door to provide clearance and slab replacement. | $25,000 |
| Apr 15, 2019 | Completed final sign-off Feb 2020 | 462 Green St | F D C Construction Inc | mandatory soft story retrofit using 2016 cbc appx a4 (not on soft story list) work limited to gnd flr only. projects includes coordination with new adu 201903195622, plus some foundation capping, rot repair and in kind replacement of stairs from basement to 1st flrDetails
mandatory soft story retrofit using 2016 cbc appx a4 (not on soft story list) work limited to gnd flr only. projects includes coordination with new adu 201903195622, plus some foundation capping, rot repair and in kind replacement of stairs from basement to 1st flr | $80,000 |
| Mar 19, 2019 | Completed final sign-off Feb 2020 | 462 Green St | F D C Construction Inc | new 380 sf adu in (e) basement per 162-16. new tenant trashroom in (e) basement. new tenant laundry.Details
new 380 sf adu in (e) basement per 162-16. new tenant trashroom in (e) basement. new tenant laundry. | $200,000 |
| Feb 1, 2019 | Never finaled issued Feb 2019, no final | 462 Green St | street spaceDetails
street space | ||
| Nov 30, 2018 | Completed final sign-off Apr 2019 | 462 Green St | San Francisco Fire Protection | new fire alarm installation in non-sprinklered bldg smoke detectors. manual pull, horn/strobes. facp will be installed. installation will be in compliance with ul standards. ref app#201804196779 shall meet sffc 1103.7.6.1 by 2020 for low fregrancy soundersDetails
new fire alarm installation in non-sprinklered bldg smoke detectors. manual pull, horn/strobes. facp will be installed. installation will be in compliance with ul standards. ref app#201804196779 shall meet sffc 1103.7.6.1 by 2020 for low fregrancy sounders | $7,000 |
| Jul 18, 2018 | Never finaled issued Jul 2018, no final | 462 Green St | street spaceDetails
street space | ||
| Jun 7, 2018 | Never finaled issued Jun 2018, no final | 462 Green St | street spaceDetails
street space | ||
| Apr 19, 2018 | Completed final sign-off Aug 2019 | 462 Green St | F D C Construction Inc | units 3,4,5,6,7,8. renovate all (e)kitchens w/ new cabinets, sink, appliances. exterior repair unit 3-kitchen adaptable unit.renovate all (e)bathrooms. unit 5-new communication unit. maher n/a.Details
units 3,4,5,6,7,8. renovate all (e)kitchens w/ new cabinets, sink, appliances. exterior repair unit 3-kitchen adaptable unit.renovate all (e)bathrooms. unit 5-new communication unit. maher n/a. | $200,000 |
| Jan 4, 2016 | Never finaled issued Jan 2016, no final | 462 Green St | street space permitDetails
street space permit | ||
| Mar 30, 2012 | Never finaled issued Mar 2012, no final | 462 Green St | street spaceDetails
street space | ||
| Sep 7, 2005 | Completed final sign-off Dec 2005 | 462 Green St | replace dry rotted steps & handrails at side of bldg. all in-kind repair,less than 50% replacementDetails
replace dry rotted steps & handrails at side of bldg. all in-kind repair,less than 50% replacement | $1,000 | |
| Jun 20, 2003 | Never finaled issued Jun 2003, no final | 462 Green St | All Four Season's Roofing | reroofingDetails
reroofing | $3,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- F D C Construction Inc (7), San Francisco Fire Protection (3), All Four Season's Roofing, Cj Plumbing, Turnd Inc.
- Architects
- Steve Suzuki (3)
- Engineers
- David Crestifield (2), Duke Crestfield, Eric Kreager
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.