Turnd Inc.
- Based in
- Novato
- On San Francisco permits
- Apr 2022 to Feb 2026
- Last 24 months
- 5 permits filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2026 | Completed final sign-off Apr 2026 | 1716 Bryant St | remopdel of 2x bathrooms to include demo and install (n) tiles, shower membrane, drain, remove vanities, fixtures and finishes no shower pan replacement. install (n) outlet and replace (e) shower doors, all work in kind no layout or wall removal.Details
remopdel of 2x bathrooms to include demo and install (n) tiles, shower membrane, drain, remove vanities, fixtures and finishes no shower pan replacement. install (n) outlet and replace (e) shower doors, all work in kind no layout or wall removal. | $22,250 |
| Nov 18, 2025 | Completed final sign-off Jan 2026 | 445 Octavia St | install new door 42" x 84" glass dooor with wood frame around i-lit full view with low-e clear glass. replace (e) tiles at the entrance 100 sq. ft. replace 3 front steps at the enterance of the building.Details
install new door 42" x 84" glass dooor with wood frame around i-lit full view with low-e clear glass. replace (e) tiles at the entrance 100 sq. ft. replace 3 front steps at the enterance of the building. | $6,000 |
| Jul 21, 2025 | Completed final sign-off Aug 2025 | 399 Fremont St | remove existing barbecues and sink. demolish existing barbeques, counter and sinks. re-build new proposed barbeque counter, maintaining existing power, gas,and connections. install new barbeques (2 total) install new sinks (2 total). deferred mep). no plumbing fixures.Details
remove existing barbecues and sink. demolish existing barbeques, counter and sinks. re-build new proposed barbeque counter, maintaining existing power, gas,and connections. install new barbeques (2 total) install new sinks (2 total). deferred mep). no plumbing fixures. | $80,000 |
| Apr 28, 2025 | Completed final sign-off May 2025 | 1725 20th St | revision to pa #202503263046 - remove (e) floor tiles in (2) bathrooms, total of 75 sqft. install new tiles in both bathrooms, floors only.Details
revision to pa #202503263046 - remove (e) floor tiles in (2) bathrooms, total of 75 sqft. install new tiles in both bathrooms, floors only. | $8,000 |
| Mar 26, 2025 | Completed final sign-off May 2025 | 1725 20th St | remove 2 existing vanities in 2 baths. install 2 new vanities, faucets, and 2 sinks. replace existing vanities in kind. no wall demolition or construction. no change in plumbing fixture count.Details
remove 2 existing vanities in 2 baths. install 2 new vanities, faucets, and 2 sinks. replace existing vanities in kind. no wall demolition or construction. no change in plumbing fixture count. | $3,000 |
| Mar 27, 2024 | Completed final sign-off Apr 2024 | 239 Brannan St | replacing kitchen counter top and sink in kind - existing appliances, tiles, and cabinets to remain. replacing 2 baths counter tops in kind - existing tub, shower, toilets, and tiles to remain.Details
replacing kitchen counter top and sink in kind - existing appliances, tiles, and cabinets to remain. replacing 2 baths counter tops in kind - existing tub, shower, toilets, and tiles to remain. | $6,700 |
| Oct 19, 2023 | Completed final sign-off Dec 2023 | 462 Green St | repair 4 story stairway in kind - less than 50% of the total structureDetails
repair 4 story stairway in kind - less than 50% of the total structure | $100,000 |
| Jun 3, 2022 | Completed final sign-off Jul 2022 | 246 02nd St | primary bathroom drywall install shower tile replacement and shower pan due to leak. in kindDetails
primary bathroom drywall install shower tile replacement and shower pan due to leak. in kind | $8,000 |
| May 27, 2022 | Completed final sign-off Jun 2022 | 246 02nd St | amendment to bpa #202205124129: second bathroom- replace new toilet, new lavy faucet, replace shower cartridge. install new vanity, new shower sliding door.Details
amendment to bpa #202205124129: second bathroom- replace new toilet, new lavy faucet, replace shower cartridge. install new vanity, new shower sliding door. | $5,200 |
| May 20, 2022 | Completed final sign-off Jun 2022 | 246 02nd St | unit #508: bathroom shower tile replacement in-kind.Details
unit #508: bathroom shower tile replacement in-kind. | $5,600 |
| May 12, 2022 | Completed final sign-off Jun 2022 | 246 02nd St | unit #507: one in kind primary bathroom and 2nd bathroom insulation and and drywall repair due to leak. in kind primary bathroom tile replacement.Details
unit #507: one in kind primary bathroom and 2nd bathroom insulation and and drywall repair due to leak. in kind primary bathroom tile replacement. | $9,000 |
| Apr 27, 2022 | Completed final sign-off May 2022 | 246 02nd St | in kind bathroom and laundry room drywall and insulation, due to leakDetails
in kind bathroom and laundry room drywall and insulation, due to leak | $2,800 |