The G B Group Inc.
- Based in
- Morgan Hill
- On San Francisco permits
- Oct 2003 to Oct 2026
- Last 24 months
- 131 permits filed
285 permits since 2000: 132 completed, 100 in progress, 30 never finaled, 23 expired or cancelled.
Of the 30 never-finaled permits, 4 are 3 to 5 years old, 25 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 285.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 338 Main St | tower (d) - waterproofing, and repairs at podium, roof, below grade, doors and windows tune-up, inspect electrical conduit supports. pool and spa rehab.Details
tower (d) - waterproofing, and repairs at podium, roof, below grade, doors and windows tune-up, inspect electrical conduit supports. pool and spa rehab. | $3,093,125 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 201 Folsom St | tower (b) - waterproofing, and repairs at podium, roof, below grade, doors and windows tune-up, inspect electrical conduit supports. pool and spa rehab.Details
tower (b) - waterproofing, and repairs at podium, roof, below grade, doors and windows tune-up, inspect electrical conduit supports. pool and spa rehab. | $3,522,375 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 318 Main St | tower (a) - waterproofing, and repairs at podium, roof, below grade, doors and windows tune-up, inspect electrical conduit supports. pool and spa rehab.Details
tower (a) - waterproofing, and repairs at podium, roof, below grade, doors and windows tune-up, inspect electrical conduit supports. pool and spa rehab. | $896,375 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 333 Beale St | tower (c) - waterproofing, and repairs at podium, roof, below grade, doors and windows tune-up, inspect electrical conduit supports. pool and spa rehab.Details
tower (c) - waterproofing, and repairs at podium, roof, below grade, doors and windows tune-up, inspect electrical conduit supports. pool and spa rehab. | $896,375 |
| Sep 28, 2026 | In progress issued Sep 2026 | 463 Stoneridge Ln | bldg 3000 unit 463 - remove (e) finish & stucco soffit; remove (e) finish balcony & membrane; replace structura joist a directed by engineer; install proposed balcony sheating; install cement modified polymer waterproofing; install stucco soffit; paint to match existing; repair in-kindDetails
bldg 3000 unit 463 - remove (e) finish & stucco soffit; remove (e) finish balcony & membrane; replace structura joist a directed by engineer; install proposed balcony sheating; install cement modified polymer waterproofing; install stucco soffit; paint to match existing; repair in-kind | $10,504 |
| Sep 28, 2026 | In progress issued Sep 2026 | 453 Stoneridge Ln | bldg 3000 unit 453 - remove (e) finish & stucco soffit; remove (e) finish balcony & membrane; replace structura joist a directed by engineer; install proposed balcony sheating; install cement modified polymer waterproofing; install stucco soffit; paint to match existing; repair in-kindDetails
bldg 3000 unit 453 - remove (e) finish & stucco soffit; remove (e) finish balcony & membrane; replace structura joist a directed by engineer; install proposed balcony sheating; install cement modified polymer waterproofing; install stucco soffit; paint to match existing; repair in-kind | $10,504 |
| Sep 28, 2026 | In progress issued Sep 2026 | 302 Stoneridge Ln | bldg 4000-remove existing finish and stucco soffit. -remove existing balcony and membrane. replace structural joist as directed by engineer. install proposed balcony sheating, install comment modified poly-waterproofing. install stucco finish soffit, paint to matching existing, repair in kind.Details
bldg 4000-remove existing finish and stucco soffit. -remove existing balcony and membrane. replace structural joist as directed by engineer. install proposed balcony sheating, install comment modified poly-waterproofing. install stucco finish soffit, paint to matching existing, repair in kind. | $10,504 |
| Sep 23, 2026 | In progress issued Sep 2026 | 2 Mint Pz | revision to 202304075302. change in structural connection of guard due to findings in the field.Details
revision to 202304075302. change in structural connection of guard due to findings in the field. | |
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 87 Summit Wy | deck rebuild like for like (less than 50%). window waterproofing like for like (front & rear). full property paint. front entry arch like for like (front & rear). all work in common area.Details
deck rebuild like for like (less than 50%). window waterproofing like for like (front & rear). full property paint. front entry arch like for like (front & rear). all work in common area. | $41,002 |
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 83 Summit Wy | deck rebuild like for like (less than 50%). window waterproofing like for like (front & rear). front entry arch like for like (front & rear). full property paint. all work in common area.Details
deck rebuild like for like (less than 50%). window waterproofing like for like (front & rear). front entry arch like for like (front & rear). full property paint. all work in common area. | $41,002 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 79 Summit Wy | deck rebuild like for like (less than 50%), window waterproofing like for like (front and rear), front entry arch like for like (front and rear), full property paint, all work in common area.Details
deck rebuild like for like (less than 50%), window waterproofing like for like (front and rear), front entry arch like for like (front and rear), full property paint, all work in common area. | $41,002 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 71 Summit Wy | deck rebuild like for like (less than 50%), window waterproofing like for like (front and rear), front entry arch (front and rear), full property paint, all work in common areas.Details
deck rebuild like for like (less than 50%), window waterproofing like for like (front and rear), front entry arch (front and rear), full property paint, all work in common areas. | $41,002 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 77 Summit Wy | deck rebuild like for like (less than 50%) window water proofing like for like (front and rear) front entry arch like for like (front and rear) full property paint. all work in common areasDetails
deck rebuild like for like (less than 50%) window water proofing like for like (front and rear) front entry arch like for like (front and rear) full property paint. all work in common areas | $41,002 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 69 Summit Wy | deck rebuild like for like (less than 50%) window water proofing like for like (front and rear) front entry arch (front and rear) full property paint. all work in common areas.Details
deck rebuild like for like (less than 50%) window water proofing like for like (front and rear) front entry arch (front and rear) full property paint. all work in common areas. | $41,002 |
| Aug 26, 2026 | In progress issued Sep 2026 | 109 Summit Wy | deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area.Details
deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area. | $41,002 |
| Aug 26, 2026 | In progress issued Sep 2026 | 153 Summit Wy | deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area.Details
deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area. | $41,002 |
| Aug 26, 2026 | In progress issued Sep 2026 | 105 Summit Wy | deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area.Details
deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area. | $41,002 |
| Aug 26, 2026 | In progress issued Sep 2026 | 157 Summit Wy | deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area.Details
deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area. | $41,002 |
| Aug 26, 2026 | In progress issued Sep 2026 | 117 Summit Wy | deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like (front & rear). full property paint. all work in common area.Details
deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like (front & rear). full property paint. all work in common area. | $41,002 |
| Aug 26, 2026 | In progress issued Sep 2026 | 99 Summit Wy | deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area.Details
deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area. | $41,002 |
| Aug 26, 2026 | In progress issued Sep 2026 | 113 Summit Wy | deck rebuild like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area.Details
deck rebuild like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area. | $41,002 |
| Aug 24, 2026 | In progress issued Aug 2026 | 223 Stoneridge Ln | bldg 6000 - unit 223 - remove (e) finish surface and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified decking finish. install...Details
bldg 6000 - unit 223 - remove (e) finish surface and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified decking finish. install... | $10,505 |
| Aug 24, 2026 | In progress issued Aug 2026 | 233 Stoneridge Ln | bldg 6000 - unit 233 - remove (e) finish surface and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified decking finish. install...Details
bldg 6000 - unit 233 - remove (e) finish surface and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified decking finish. install... | $10,505 |
| Aug 24, 2026 | In progress issued Aug 2026 | 235 Stoneridge Ln | bldg 6000 - unit 235 - remove (e) finish surface and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified decking finish. install...Details
bldg 6000 - unit 235 - remove (e) finish surface and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified decking finish. install... | $10,505 |
| Aug 24, 2026 | In progress issued Aug 2026 | 225 Stoneridge Ln | bldg 6000 - unit 225 - remove (e) finish surface and stucco on sofit, remove (e) balcony sheeting and membrane, replace structural joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified decking finish. install...Details
bldg 6000 - unit 225 - remove (e) finish surface and stucco on sofit, remove (e) balcony sheeting and membrane, replace structural joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified decking finish. install... | $10,505 |
| Aug 6, 2026 | In progress issued Aug 2026 | 2177 03rd St | podium water proofing. epoxy injection in concrete wall.Details
podium water proofing. epoxy injection in concrete wall. | $120,000 |
| Jun 24, 2026 | In progress issued Jul 2026 | 155 Summit Wy | deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area.Details
deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area. | $41,002 |
| Jun 24, 2026 | In progress issued Jul 2026 | 159 Summit Wy | deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area.Details
deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area. | $41,002 |
| Jun 24, 2026 | In progress issued Jul 2026 | 163 Summit Wy | deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area.Details
deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area. | $41,002 |
| Jun 24, 2026 | In progress issued Jun 2026 | 6 Mint Pz | drain fire tank located at basement area. clean, and remove existing coating inside fire tank and reinforce crack & joints. prime and re-coat interior side of fire tank w/new water proofing elastomeric coating, refill water tank with a new water and fire watch to be provided by hoa client.Details
drain fire tank located at basement area. clean, and remove existing coating inside fire tank and reinforce crack & joints. prime and re-coat interior side of fire tank w/new water proofing elastomeric coating, refill water tank with a new water and fire watch to be provided by hoa client. | $10,000 |
| Jun 24, 2026 | In progress issued Jul 2026 | 167 Summit Wy | deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area.Details
deck rebuilid like for like (less than 50%). window water proofing front & rear. front entry arch, like for like. full property paint. all work in common area. | $41,002 |
| Jun 23, 2026 | In progress issued Jul 2026 | 193 Summit Wy | deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas.Details
deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas. | $41,002 |
| Jun 23, 2026 | In progress issued Jul 2026 | 185 Summit Wy | deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas.Details
deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas. | $41,002 |
| Jun 23, 2026 | In progress issued Jul 2026 | 173 Summit Wy | deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas.Details
deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas. | $41,002 |
| Jun 23, 2026 | In progress issued Jul 2026 | 181 Summit Wy | deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas.Details
deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas. | $41,002 |
| Jun 23, 2026 | In progress issued Jul 2026 | 189 Summit Wy | deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas.Details
deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas. | $41,002 |
| Jun 23, 2026 | In progress issued Jul 2026 | 177 Summit Wy | deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas.Details
deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas. | $41,002 |
| Jun 10, 2026 | In progress issued Jun 2026 | 203 Stoneridge Ln | bldg 600- unit 203- remove (e) finish and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified finish.Details
bldg 600- unit 203- remove (e) finish and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified finish. | $10,504 |
| Jun 10, 2026 | In progress issued Jun 2026 | 215 Stoneridge Ln | bldg 600- unit 215- remove (e) finish and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified finish.Details
bldg 600- unit 215- remove (e) finish and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified finish. | $10,504 |
| Jun 10, 2026 | In progress issued Jun 2026 | 205 Stoneridge Ln | bldg 600- unit 205- remove (e) finish and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified finish.Details
bldg 600- unit 205- remove (e) finish and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified finish. | $10,504 |
| Jun 10, 2026 | In progress issued Jun 2026 | 213 Stoneridge Ln | bldg 600- unit 213- remove (e) finish and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified decking finish.Details
bldg 600- unit 213- remove (e) finish and stucco on soffit, remove (e) balcony sheeting and membrane, replace structrual joist per engineer, install propsed balcony sheeting, and install cement modified polimer waterproofing. framing repairs in kind, modified decking finish. | $10,504 |
| May 11, 2026 | In progress issued May 2026 | 311 Summit Wy | waterproofing details at window and doors, demo/ reflash & stucco. like for like. repair in kind, window trim, stucco, and belly band trim.Details
waterproofing details at window and doors, demo/ reflash & stucco. like for like. repair in kind, window trim, stucco, and belly band trim. | $41,002 |
| May 11, 2026 | In progress issued May 2026 | 315 Summit Wy | waterproofing details at window and doors, demo/ reflash & stucco. like for like.Details
waterproofing details at window and doors, demo/ reflash & stucco. like for like. | $41,002 |
| May 11, 2026 | In progress issued May 2026 | 309 Summit Wy | waterproofing details at window and doors, demo/ reflash & stucco. like for like.Details
waterproofing details at window and doors, demo/ reflash & stucco. like for like. | $41,002 |
| May 11, 2026 | In progress issued May 2026 | 313 Summit Wy | waterproofing details at window and doors, demo/ reflash & stucco. like for like. repair in kind window trim, stucco, belly band trim.Details
waterproofing details at window and doors, demo/ reflash & stucco. like for like. repair in kind window trim, stucco, belly band trim. | $41,002 |
| May 6, 2026 | In progress issued Jun 2026 | 2 Mint Pz | revision to 202304075302. due to findings in field condition, some of fall protection has changed.Details
revision to 202304075302. due to findings in field condition, some of fall protection has changed. | $4,000 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 333 Stoneridge Ln | remove existing finish and stucco soffit. remove existing balcony sheeting and membrane. replace structural joists as directed by engineer (in-kind). install proposed balcony sheeting. install cement-modified polymer waterproofing. install stucco soffit. paint soffit to match.Details
remove existing finish and stucco soffit. remove existing balcony sheeting and membrane. replace structural joists as directed by engineer (in-kind). install proposed balcony sheeting. install cement-modified polymer waterproofing. install stucco soffit. paint soffit to match. | $16,505 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 345 Stoneridge Ln | remove existing finish and stucco soffit. remove existing balcony sheeting and membrane. replace structural joists as directed by engineer (in-kind). install proposed balcony sheeting. install cement-modified polymer waterproofing. install stucco soffit. paint soffit to match.Details
remove existing finish and stucco soffit. remove existing balcony sheeting and membrane. replace structural joists as directed by engineer (in-kind). install proposed balcony sheeting. install cement-modified polymer waterproofing. install stucco soffit. paint soffit to match. | $16,505 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 335 Stoneridge Ln | remove existing finish and stucco soffit. remove existing balcony sheeting and membrane. replace structural joists as directed by engineer (in-kind). install proposed balcony sheeting. install cement-modified polymer waterproofing. install stucco soffit. paint soffit to match.Details
remove existing finish and stucco soffit. remove existing balcony sheeting and membrane. replace structural joists as directed by engineer (in-kind). install proposed balcony sheeting. install cement-modified polymer waterproofing. install stucco soffit. paint soffit to match. | $16,505 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 343 Stoneridge Ln | remove existing finish and stucco soffit. remove existing balcony sheeting and membrane. replace structural joists as directed by engineer (in kind). install proposed balcony sheeting. install cement-modified polymer waterproofing. install stucco soffit. paint soffit to match.Details
remove existing finish and stucco soffit. remove existing balcony sheeting and membrane. replace structural joists as directed by engineer (in kind). install proposed balcony sheeting. install cement-modified polymer waterproofing. install stucco soffit. paint soffit to match. | $16,505 |
| Apr 10, 2026 | In progress filed Apr 2026, not yet issued | 1750 Geneva Av | remove existing finish surface and stucco soffit. remove existing balcony sheating and membrane. replace structural joist as detected by engineer. install proposed balcony sheeting. install cement modified polymer waterproofing - paint soffit to match. install stucco soffit.Details
remove existing finish surface and stucco soffit. remove existing balcony sheating and membrane. replace structural joist as detected by engineer. install proposed balcony sheeting. install cement modified polymer waterproofing - paint soffit to match. install stucco soffit. | $247,568 |
| Mar 11, 2026 | Completed final sign-off Apr 2026 | 369 18th Av | to obtain final inspection for work approved under pa#202302272661,202404049341. all work is completeDetails
to obtain final inspection for work approved under pa#202302272661,202404049341. all work is complete | |
| Mar 11, 2026 | Completed final sign-off Mar 2026 | 2210 Golden Gate Av | to obtain final inspection for work approved under pa#202407015638. all work is complete.Details
to obtain final inspection for work approved under pa#202407015638. all work is complete. | |
| Mar 11, 2026 | Completed final sign-off Mar 2026 | 2202 Golden Gate Av | to obtain final inspection for work approved under pa#202407015634. all work is completeDetails
to obtain final inspection for work approved under pa#202407015634. all work is complete | |
| Mar 11, 2026 | Completed final sign-off Mar 2026 | 2212 Golden Gate Av | to obtain final inspection for work approved under pa#202407015637. all work is complete.Details
to obtain final inspection for work approved under pa#202407015637. all work is complete. | |
| Mar 11, 2026 | Completed final sign-off Mar 2026 | 2200 Golden Gate Av | to obtain final inspection for work approved under pa#202407015636. all work is completeDetails
to obtain final inspection for work approved under pa#202407015636. all work is complete | |
| Nov 6, 2025 | Completed final sign-off Feb 2026 | 5078 Diamond Heights Bl | remove & replace dry rot surface balcony floor less than 50%. like for like. install proper slope. remove & replace dry rot trim around the window and sliding glass door on the balcony. apply new coating. prime & paint. street visible.Details
remove & replace dry rot surface balcony floor less than 50%. like for like. install proper slope. remove & replace dry rot trim around the window and sliding glass door on the balcony. apply new coating. prime & paint. street visible. | $28,904 |
| Oct 29, 2025 | In progress issued Feb 2026 | 23 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 275 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 236 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 250 Summit Wy | waterproofing details around windows to include demo, re-flashing and stuco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stuco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 299 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 272 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 305 Summit Wy | waterproofing details around windows to include demo, re-flashing and stuco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stuco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 251 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 252 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 265 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 20 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 295 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 16 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 279 Summit Wy | waterproofing details around windows to include demo, re-flashing and stuco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stuco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 259 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 260 Summit Wy | waterproofing details around windows to include demo, re-flashing and stuco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stuco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 285 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Feb 2026 | 19 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 22 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 261 Summit Wy | waterproofing details around windows to include demo, re-flashing and stuco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stuco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Aug 2026 | 32 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 266 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 289 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 253 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 267 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 8 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 256 Summit Wy | waterproofing details around windows to include demo, re-flashing and stuco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stuco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 281 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 2 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 18 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 297 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 277 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 257 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Feb 2026 | 21 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 293 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 10 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 12 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 258 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 271 Summit Wy | waterproofing details around windows to include demo, re-flashing and stuco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stuco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 28 Summit Wy | waterproofing details around windows to include demo, re-flashing and stuco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stuco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 270 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | In progress issued Apr 2026 | 273 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Oct 29, 2025 | Completed final sign-off Aug 2026 | 36 Summit Wy | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |