Block 7331, lot 059
258 Summit Way
- City’s use
- Single Family Residential
- Stories
- 2
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,001 sq ft
- Lot
- 1,574 sq ft
- Zoning
- RM1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 29, 2025 | In progress issued Apr 2026 | 258 Summit Wy | The G B Group Inc. | waterproofing details around windows to include demo, re-flashing and stucco. full painting.Details
waterproofing details around windows to include demo, re-flashing and stucco. full painting. | $41,002 |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 258 Summit Wy | Thorpe Design Inc | construction of fire sprinlker system @ address above.this permit ref master bldg type b;pa#201209119424 amended by pa#201311192305 & pa#201401317503 & pa201407100858. ref master fire sprinkler pa201501216262 and building plot plan #201506098469. as-builts may be required per fire inspections.Details
construction of fire sprinlker system @ address above.this permit ref master bldg type b;pa#201209119424 amended by pa#201311192305 & pa#201401317503 & pa201407100858. ref master fire sprinkler pa201501216262 and building plot plan #201506098469. as-builts may be required per fire inspections. | |
| Oct 30, 2015 | Completed final sign-off Sep 2017 | 258 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | deferred submittal of roof trus framing and associated calculations at above address with pa 201506098469 type b,elev b by ref 201407100858 master permit plan and 201403100318 master bldg roof truss plan and calc. identical reuseof master bldg and truss permit planDetails
deferred submittal of roof trus framing and associated calculations at above address with pa 201506098469 type b,elev b by ref 201407100858 master permit plan and 201403100318 master bldg roof truss plan and calc. identical reuseof master bldg and truss permit plan | $3,000 |
| Jun 9, 2015 | Completed final sign-off Oct 2016 | 258 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect two story single family residential building.Details
erect two story single family residential building. | $380,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Comstock Crosser & Assoc Develp Co Inc. (2), The G B Group Inc., Thorpe Design Inc
- Architects
- Brian Liles, Ralph Strauss
- Engineers
- Marc Press, Timothy Heffernan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.