Block 7098, lot 012
5630 Mission St
- City’s use
- Commercial Hotel
- Built
- 1965
- Stories
- 3
- Units
- 52
- Rooms
- 42 bathrooms
- Building
- 20,977 sq ft
- Lot
- 26,641 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
42 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2025 | Completed final sign-off Nov 2025 | 5630 Mission St | Amone Corp | unit 324 & 224: dry rot repair at bay window 2nd & 3rd/fDetails
unit 324 & 224: dry rot repair at bay window 2nd & 3rd/f | $10,000 |
| Jul 30, 2025 | Completed final sign-off Sep 2025 | 5630 Mission St | Amone Corp | units 108 & 122: shower repair, new shower head, tile, waterproofing, shower pan and water test. all in-kind work. only shower work.Details
units 108 & 122: shower repair, new shower head, tile, waterproofing, shower pan and water test. all in-kind work. only shower work. | $10,000 |
| May 9, 2025 | Completed final sign-off May 2025 | 5630 Mission St | United Systems Fire And Security Llc | building c as built ref pa #2025-0314-2308 no new devices added. the single nac circuit was originally shown was split into 2 circuits to shorten wire run. both are fed from facu. pull station and remote annunciator were relocatedDetails
building c as built ref pa #2025-0314-2308 no new devices added. the single nac circuit was originally shown was split into 2 circuits to shorten wire run. both are fed from facu. pull station and remote annunciator were relocated | |
| May 9, 2025 | In progress issued May 2025 | 5630 Mission St | United Systems Fire And Security Llc | as built ref#2025-0509-6180 rbps relocated to pump room in basement for new circuits needed for ada,ccis needed to be their own dedicated power circuits. tcdr have been updated for sounder bases. ada units stair risers has been removed per sprinkler contractor levels 2 to 4.Details
as built ref#2025-0509-6180 rbps relocated to pump room in basement for new circuits needed for ada,ccis needed to be their own dedicated power circuits. tcdr have been updated for sounder bases. ada units stair risers has been removed per sprinkler contractor levels 2 to 4. | |
| Mar 14, 2025 | Completed final sign-off May 2025 | 5630 Mission St | United Systems Fire And Security Llc | new facu i064ied should be provide and cellular communicator, rmeove annunciator & manual pull station located at front lobby. f/s rise monitor. ref 202211096174.Details
new facu i064ied should be provide and cellular communicator, rmeove annunciator & manual pull station located at front lobby. f/s rise monitor. ref 202211096174. | $4,700 |
| Dec 12, 2024 | Completed final sign-off Jul 2025 | 5630 Mission St | Andreini Bros, Inc | storm drain installation including catch basin structures/clean outDetails
storm drain installation including catch basin structures/clean out | $15,000 |
| Nov 12, 2024 | In progress issued Nov 2025 | 5630 Mission St | Mastec Network Solutions Inc | t-mobile: remove 2 (e) antennas & install 6 (n) antennas, construct new frp screen box/penthouse, relocate 1 (e) cabinet, install 2 (n) cabinets; install 12 (n) batteries; install (n) elec. grounding.Details
t-mobile: remove 2 (e) antennas & install 6 (n) antennas, construct new frp screen box/penthouse, relocate 1 (e) cabinet, install 2 (n) cabinets; install 12 (n) batteries; install (n) elec. grounding. | $115,000 |
| Jun 18, 2024 | Completed final sign-off May 2025 | 5630 Mission St | Allied Fire Protection | add fire sprinklers to (e) buildings at mission inn. building (a) is four levels-three upper levels of residential units one level of tuck under parking, etc. building (b) is two levels of residential units and partial basement. (ref only- bldg (c)-is two levels of office support services);Details
add fire sprinklers to (e) buildings at mission inn. building (a) is four levels-three upper levels of residential units one level of tuck under parking, etc. building (b) is two levels of residential units and partial basement. (ref only- bldg (c)-is two levels of office support services); | $470,000 |
| Jun 14, 2024 | Completed final sign-off May 2025 | 5630 Mission St | Allied Fire Protection | add fire sprinklers to (e) buildings at mission inn. building (c) is two levels of office support services. (ref only-bldg (a) is four levels-three upper levels of residential units one level of tuck under parking etc. bldg (b) is two levels of residential units and partial basement). complete nfpaDetails
add fire sprinklers to (e) buildings at mission inn. building (c) is two levels of office support services. (ref only-bldg (a) is four levels-three upper levels of residential units one level of tuck under parking etc. bldg (b) is two levels of residential units and partial basement). complete nfpa | $100,000 |
| Apr 23, 2024 | In progress issued Mar 2025 | 5630 Mission St | United Systems Fire And Security Llc | new io1000 facp and cellular communiator,remove annunciator & manual pull station located at the front lobby.low-freq horns in living space and bedroom.full notification coverage for common uyse aeras.f/s rise mointor,fire pump monitoring.120vac smoke detectors for residential units to by others.Details
new io1000 facp and cellular communiator,remove annunciator & manual pull station located at the front lobby.low-freq horns in living space and bedroom.full notification coverage for common uyse aeras.f/s rise mointor,fire pump monitoring.120vac smoke detectors for residential units to by others. | $38,642 |
| Nov 9, 2022 | Completed final sign-off Jul 2025 | 5630 Mission St | Plant Construction Co, Lp | 100% affordable housing. bldg c - interior sow: (n) offices, meeting rooms, storage, ada bathroom, lobby, community room w/ warming kitchen. exterior sow: repurposed areas for (n) offices, community room, and open space. deferred submittals: sprinkler and alarm systems.Details
100% affordable housing. bldg c - interior sow: (n) offices, meeting rooms, storage, ada bathroom, lobby, community room w/ warming kitchen. exterior sow: repurposed areas for (n) offices, community room, and open space. deferred submittals: sprinkler and alarm systems. | $1,509,900 |
| Nov 9, 2022 | Completed final sign-off Jul 2025 | 5630 Mission St | Plant Construction Co, Lp | 100% affordable housing. bldg a & b (shared foundation) - interior sow: gound level (n) resident services office, ada bathrooms, storage and accessory use for on-site staff/residents. exterior sow: (n) trash rooms. deferred submittals: sprinkler and alarm systems.Details
100% affordable housing. bldg a & b (shared foundation) - interior sow: gound level (n) resident services office, ada bathrooms, storage and accessory use for on-site staff/residents. exterior sow: (n) trash rooms. deferred submittals: sprinkler and alarm systems. | $2,541,816 |
| Mar 15, 2022 | Completed final sign-off Aug 2022 | 5630 Mission St | Ericsson Inc Dba E U S Inc | modify (e) at&t macro site: remove 6 antennas. install 6 antennas. remove 6 rru's. install signage / barricades / stripping per eme report. install 4 rectifiers. install 1 6648 baseband.Details
modify (e) at&t macro site: remove 6 antennas. install 6 antennas. remove 6 rru's. install signage / barricades / stripping per eme report. install 4 rectifiers. install 1 6648 baseband. | $25,000 |
| Mar 9, 2022 | Never finaled issued May 2022, no final | 5630 Mission St | Ravig Inc Dba Salient Global Technologi | verizon: relocate 6 & add 3 antennas. relocate 6, replace 3 & add 1 rru. relocate 1 & add 2 ovps. remove 3 diplexers. install 2 combiners. install screen wall. relocate & install mounting pipes. replace 1 & add 2 hybrid cables. install 2 oups at equip room.Details
verizon: relocate 6 & add 3 antennas. relocate 6, replace 3 & add 1 rru. relocate 1 & add 2 ovps. remove 3 diplexers. install 2 combiners. install screen wall. relocate & install mounting pipes. replace 1 & add 2 hybrid cables. install 2 oups at equip room. | $59,000 |
| Jun 10, 2021 | Expired or cancelled withdrawn Oct 2024 | 5630 Mission St | tmobile: modific to an (e) unmanned wireless telecom site to include: remove 2(e) antennas, 2(e) diplexers, 4(e)tmas, 2(e) elec cabinets & 2(e) coax cables. installing 6(n) antennas inside of a new frp, 6(n) radios, 2(n) 6x12 cables. adding 2(n) elec cabinets, 200amp power upgrade & ancillary equip.Details
tmobile: modific to an (e) unmanned wireless telecom site to include: remove 2(e) antennas, 2(e) diplexers, 4(e)tmas, 2(e) elec cabinets & 2(e) coax cables. installing 6(n) antennas inside of a new frp, 6(n) radios, 2(n) 6x12 cables. adding 2(n) elec cabinets, 200amp power upgrade & ancillary equip. | $40,000 | |
| Feb 26, 2021 | Expired or cancelled cancelled Jan 2026 | 5630 Mission St | 1)remodeling 18 guest rooms, 2)remodel extg bathroom, 3)replace front facing windows. 4)replace wall furnaces with ptac units. 5)area of work 4910 sqft. 6)install new electrical service(800 amp)Details
1)remodeling 18 guest rooms, 2)remodel extg bathroom, 3)replace front facing windows. 4)replace wall furnaces with ptac units. 5)area of work 4910 sqft. 6)install new electrical service(800 amp) | $30,000 | |
| Sep 15, 2020 | Completed final sign-off Apr 2021 | 5630 Mission St | San Francisco Fire Protection | like for like fire alarm system replacing facp, heat detector and 9 manual pull stations. existing bells will reamin at their original location.Details
like for like fire alarm system replacing facp, heat detector and 9 manual pull stations. existing bells will reamin at their original location. | $7,000 |
| Aug 27, 2020 | Completed final sign-off Jan 2021 | 5630 Mission St | Ericsson Inc Dba E U S Inc | at&t proposes to modify and existing facility as follows:· remove and replace 3 existing antennas· remove 6 existing rru's· install 3 new rru's· all other related equipment being placed in existing cabinetsDetails
at&t proposes to modify and existing facility as follows:· remove and replace 3 existing antennas· remove 6 existing rru's· install 3 new rru's· all other related equipment being placed in existing cabinets | $15,000 |
| Jan 8, 2020 | Expired or cancelled expired Aug 2024 | 5630 Mission St | administrative permit to remove fire alarm upgrade per 1103.7.6.1 revision to pa 2019-0606-2786Details
administrative permit to remove fire alarm upgrade per 1103.7.6.1 revision to pa 2019-0606-2786 | ||
| Dec 27, 2019 | Expired or cancelled expired Aug 2024 | 5630 Mission St | administrative permit to include technical infeasibility request form. revision to permit 201906062786.Details
administrative permit to include technical infeasibility request form. revision to permit 201906062786. | ||
| Oct 2, 2019 | Expired or cancelled cancelled Jan 2026 | 5630 Mission St | remove & replace (3)(e) dual port antennas w/(6) port antenans, (1) per section, insatll(1) new & retain (2) rru, total (9) rru, (1)(e) raycap to remain relocate (1) section of antenanas & radios (rru) from elevator penthouse & place them on stairwell, penthouse relocate 1 (e) raycap to beta sector.Details
remove & replace (3)(e) dual port antennas w/(6) port antenans, (1) per section, insatll(1) new & retain (2) rru, total (9) rru, (1)(e) raycap to remain relocate (1) section of antenanas & radios (rru) from elevator penthouse & place them on stairwell, penthouse relocate 1 (e) raycap to beta sector. | $35,000 | |
| Jun 6, 2019 | Expired or cancelled expired Aug 2024 | 5630 Mission St | Carlos Sanchez | comply w/nov 201956072. renovate rooms 101, 102 to ada compliant. regrading restriping parking lot for ada access. renovate front motel lobby checkin night windows to meet ada standards & provide path to breakfast rm. renovate guest breakfast room to comply w/ada standards. renovation of 34 guestrmsDetails
comply w/nov 201956072. renovate rooms 101, 102 to ada compliant. regrading restriping parking lot for ada access. renovate front motel lobby checkin night windows to meet ada standards & provide path to breakfast rm. renovate guest breakfast room to comply w/ada standards. renovation of 34 guestrms | $240,000 |
| Apr 30, 2018 | Completed final sign-off Mar 2019 | 5630 Mission St | Shah & Associates Inc Dba P D C Corporat | swap 9 anntennas, install 9 rrus, install 1 dc trunk per dc6Details
swap 9 anntennas, install 9 rrus, install 1 dc trunk per dc6 | $10,000 |
| Apr 25, 2018 | Expired or cancelled cancelled Jan 2026 | 5630 Mission St | soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $99,000 | |
| Sep 16, 2016 | Completed final sign-off Feb 2017 | 5630 Mission St | Universal Cell Site Services Inc | modification to e att facility: remove/replace 3 e antennas within e frp screens, remove 3 (e) rrus and install 3 new rrus, other minor equipment upgrades within att lease areaDetails
modification to e att facility: remove/replace 3 e antennas within e frp screens, remove 3 (e) rrus and install 3 new rrus, other minor equipment upgrades within att lease area | $24,000 |
| Aug 22, 2016 | Expired or cancelled withdrawn Apr 2018 | 5630 Mission St | soft story seismic retrofit sfbc chapter 34b, appendix iebc a4.Details
soft story seismic retrofit sfbc chapter 34b, appendix iebc a4. | $120,000 | |
| Jun 16, 2016 | Expired or cancelled withdrawn Oct 2021 | 5630 Mission St | install 1 new back up generator (30 kw) with ul142 fire rater, 54 gallon fuel tank inside parking garage. vent to outside wall back-up diesel power generator for an (e) verizon wireless macro wts facility. vent to be painted to match wall surface. testing shall be limited to normal business hoursDetails
install 1 new back up generator (30 kw) with ul142 fire rater, 54 gallon fuel tank inside parking garage. vent to outside wall back-up diesel power generator for an (e) verizon wireless macro wts facility. vent to be painted to match wall surface. testing shall be limited to normal business hours | $35,000 | |
| May 18, 2016 | Completed final sign-off Jan 2017 | 5630 Mission St | Universal Cell Site Services Inc | modifications to an extg at&t facility including: removing/replacing 3 antennas. installing 3 new rrus and 2 new surge suppressors. other minor equipment upgrades. (at&t) to comply with ces nov 201386621 dated 2/5/2013Details
modifications to an extg at&t facility including: removing/replacing 3 antennas. installing 3 new rrus and 2 new surge suppressors. other minor equipment upgrades. (at&t) to comply with ces nov 201386621 dated 2/5/2013 | $22,000 |
| Oct 27, 2015 | Never finaled issued Oct 2015, no final | 5630 Mission St | Calgate Home Improvement | street spaceDetails
street space | |
| Sep 23, 2015 | Completed final sign-off Jul 2016 | 5630 Mission St | Electric Tech Construction Inc | to comply with nov 201386621: modification to (e) verizon wireless site to r&r 6(e) antennas w/6 new, add 3 n pcs rrus/a2 units, replace 3 (e) rrus w/n (3) rrus/a2 units for 700. add 3 az units to aws. install 2 n raycaps. 1 n hybrid trunk cable and 3 n 700/800 diplexers. relocate gps ant. to cableDetails
to comply with nov 201386621: modification to (e) verizon wireless site to r&r 6(e) antennas w/6 new, add 3 n pcs rrus/a2 units, replace 3 (e) rrus w/n (3) rrus/a2 units for 700. add 3 az units to aws. install 2 n raycaps. 1 n hybrid trunk cable and 3 n 700/800 diplexers. relocate gps ant. to cable | $45,000 |
| Jun 2, 2014 | Expired or cancelled withdrawn Aug 2014 | 5630 Mission St | a modification to an (e) unmanned at&t telecom facility consisting of adding three new rrus-12 units with three new a2 modules & one new dc-2 surge suppressors. remove one dul unit & install one new dus 41 unit in existing equipment room.Details
a modification to an (e) unmanned at&t telecom facility consisting of adding three new rrus-12 units with three new a2 modules & one new dc-2 surge suppressors. remove one dul unit & install one new dus 41 unit in existing equipment room. | $10,000 | |
| Jan 15, 2014 | Expired or cancelled cancelled Oct 2021 | 5630 Mission St | Costrotta Construc Management Inc | verizon wireless: replacing (3) existing antennas with similar antennas. install 3 rrh units, raycaps; install dc plant. ac circuit from equip. room to dc plant. install hybrid & ret cables.Details
verizon wireless: replacing (3) existing antennas with similar antennas. install 3 rrh units, raycaps; install dc plant. ac circuit from equip. room to dc plant. install hybrid & ret cables. | $18,000 |
| Oct 3, 2012 | Expired or cancelled cancelled Mar 2020 | 5630 Mission St | modification to an (e) wireless facility consisting of the addition of (1) 1'microwave dish & (1) 2' microwave dish.Details
modification to an (e) wireless facility consisting of the addition of (1) 1'microwave dish & (1) 2' microwave dish. | $3,000 | |
| Apr 18, 2012 | Completed final sign-off Jun 2013 | 5630 Mission St | Cccs, Inc | per case #20110418c. installiation of (9) panel type antennas and associated equipment.Details
per case #20110418c. installiation of (9) panel type antennas and associated equipment. | $50,000 |
| Oct 27, 2010 | Completed final sign-off May 2011 | 5630 Mission St | Park Place Contractors | verizon proposes to add three antennas inside their screened enclosure next to their existing antennas. also to add three new "back pack" size radio units and enlarge the existing screen wall by 2' on three sides. revision to #200906049807.Details
verizon proposes to add three antennas inside their screened enclosure next to their existing antennas. also to add three new "back pack" size radio units and enlarge the existing screen wall by 2' on three sides. revision to #200906049807. | $18,000 |
| Jun 4, 2009 | Completed final sign-off May 2011 | 5630 Mission St | N S A Wireless Inc | verizon proposes to add 3-antennas inside their screened enclosure next to their (e) antennas. also to add 6-runs of coax in (e) tray & extend screening to roof top level.Details
verizon proposes to add 3-antennas inside their screened enclosure next to their (e) antennas. also to add 6-runs of coax in (e) tray & extend screening to roof top level. | $12,000 |
| Jun 20, 2008 | Completed final sign-off Aug 2008 | 5630 Mission St | Momentum Services Corp | renew pa#200604189279 for final inspection.Details
renew pa#200604189279 for final inspection. | |
| Oct 13, 2006 | Completed final sign-off Oct 2006 | 5630 Mission St | Metropolitan Electrical Construction | renewal for pa# 2004/01/09/3704 for final inspection only.Details
renewal for pa# 2004/01/09/3704 for final inspection only. | |
| Apr 18, 2006 | Expired or cancelled expired May 2019 | 5630 Mission St | Momentum Services Corp | project involves the installation of 2 micro panel antennas mounted to (e) building penthouse w/equipment mounted on the ground @ car port under bldg.Details
project involves the installation of 2 micro panel antennas mounted to (e) building penthouse w/equipment mounted on the ground @ car port under bldg. | $40,000 |
| Apr 26, 2004 | Never finaled issued Apr 2004, no final | 5630 Mission St | sidewalk permitDetails
sidewalk permit | ||
| Jan 9, 2004 | Expired or cancelled expired May 2019 | 5630 Mission St | Metropolitan Electrical Construction | mount total 5 4'panel antennas behind new rf transparent screen on upper roof.install equipment onDetails
mount total 5 4'panel antennas behind new rf transparent screen on upper roof.install equipment on | $80,000 |
| Jun 28, 2002 | Expired or cancelled expired Oct 2002 | 5630 Mission St | Bay Area Home Improvements | apply vinly siding back porch wall, above 3 ft high 150 long, no structural workDetails
apply vinly siding back porch wall, above 3 ft high 150 long, no structural work | $1,700 |