Shah & Associates Inc Dba P D C Corporat
- Based in
- Poway
- On San Francisco permits
- Mar 2017 to Mar 2019
- Last 24 months
- 0 permits filed
22 permits since 2000: 19 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2019 | Completed final sign-off Apr 2019 | 30 Rickard St | revised permit drawings to remove requirement for special inspection for permit #201804045477. change from concrete towood floor w/lag bolts.Details
revised permit drawings to remove requirement for special inspection for permit #201804045477. change from concrete towood floor w/lag bolts. | |
| Mar 12, 2019 | Expired or cancelled cancelled Mar 2023 | 1067 Folsom St | att modification: r+r (9) e antennas w/(9) n antennas; remove (6) e rrus; r+r (3) e rrus w/(3) n rrus; install (9) n rrus and other small equip.; install n frp wall; no change to batteries.Details
att modification: r+r (9) e antennas w/(9) n antennas; remove (6) e rrus; r+r (3) e rrus w/(3) n rrus; install (9) n rrus and other small equip.; install n frp wall; no change to batteries. | $52,000 |
| Dec 11, 2018 | Completed final sign-off Dec 2019 | 1800 Union St | at&t modification - remove and replae 3 (e) omni antennas w/3(n) omni antennas; install 1 (n) power plant w (1) string of batteries; install 3 (n) rrus and other small equipment; remove all unused equipmentDetails
at&t modification - remove and replae 3 (e) omni antennas w/3(n) omni antennas; install 1 (n) power plant w (1) string of batteries; install 3 (n) rrus and other small equipment; remove all unused equipment | $22,000 |
| Nov 28, 2018 | Completed final sign-off Nov 2019 | 107 Sagamore St | remove and replace 6 antennas. install 9 rru's on rooftop. install new fiber & dc trunk. all modifications to extg cell site.Details
remove and replace 6 antennas. install 9 rru's on rooftop. install new fiber & dc trunk. all modifications to extg cell site. | $82,500 |
| Nov 13, 2018 | Completed final sign-off Dec 2019 | 1701 Jerrold Av | att modification: r&r (9) (e) antennas w/ (9) (n) antennas; install (12) (n) antennas, install (n) cabinet w/ batteriesDetails
att modification: r&r (9) (e) antennas w/ (9) (n) antennas; install (12) (n) antennas, install (n) cabinet w/ batteries | $44,000 |
| Nov 6, 2018 | Completed final sign-off Oct 2019 | 375 Laguna Honda Bl | at&t modification: remove and replace 9 (e) antennas w/ 9 (n) antennas; install 12 (n) rrus and other small equipment; no change to batteriesDetails
at&t modification: remove and replace 9 (e) antennas w/ 9 (n) antennas; install 12 (n) rrus and other small equipment; no change to batteries | $42,000 |
| Nov 1, 2018 | Completed final sign-off Sep 2019 | 1100 Divisadero St | at&t modification r7r 6(e) antennas with 6 (n) antennas; r& r 9 (e) rrus with 9 (n) rrus; install other small equipment; no change to batteriesDetails
at&t modification r7r 6(e) antennas with 6 (n) antennas; r& r 9 (e) rrus with 9 (n) rrus; install other small equipment; no change to batteries | $39,000 |
| Oct 30, 2018 | Completed final sign-off Jan 2020 | 2170 Ingalls St | att modification. remove and replace 9 (e) antennas w/ 9 (n), install 12 (n) rru's, other small equipment, remove 3 (e) rru's, install 1 (n) cabinet, remove and replace batteriesDetails
att modification. remove and replace 9 (e) antennas w/ 9 (n), install 12 (n) rru's, other small equipment, remove 3 (e) rru's, install 1 (n) cabinet, remove and replace batteries | $52,000 |
| Oct 16, 2018 | Completed final sign-off May 2019 | 776 Bush St | att modification. remove and replace 3 extg antennas with 3 new antennas; install 3 new rrus and other small equip, remove unused equip. no change to batteries. n/a for maher.Details
att modification. remove and replace 3 extg antennas with 3 new antennas; install 3 new rrus and other small equip, remove unused equip. no change to batteries. n/a for maher. | $21,000 |
| Oct 10, 2018 | Completed final sign-off Nov 2019 | 725 Greenwich St | at&t mobility - remove and replace 3 (e) antennas with 3 (n) antennas; remove and replace 3 (e) rrus witn 3 (n) rrus; install 9 (n) rrus and other small equipment; no change to batteriesDetails
at&t mobility - remove and replace 3 (e) antennas with 3 (n) antennas; remove and replace 3 (e) rrus witn 3 (n) rrus; install 9 (n) rrus and other small equipment; no change to batteries | $31,000 |
| Jun 28, 2018 | Completed final sign-off May 2019 | 251 Barneveld Av | att mobility: install (3) (n) antennas in (1) (n) 36" radome, paint to match others; install (9) (n) rrus and other small equipment; install (1) (n) cabinet & remove (2)(e) cabinetsDetails
att mobility: install (3) (n) antennas in (1) (n) 36" radome, paint to match others; install (9) (n) rrus and other small equipment; install (1) (n) cabinet & remove (2)(e) cabinets | $37,000 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 850 Stockton St | at&t mobility: r&r 7 (e) antennas w/ 7 new antennas. install 9 new rrusl install new cabinets and other small equipment. remove all unused equipDetails
at&t mobility: r&r 7 (e) antennas w/ 7 new antennas. install 9 new rrusl install new cabinets and other small equipment. remove all unused equip | $36,000 |
| Apr 30, 2018 | Completed final sign-off Mar 2019 | 5630 Mission St | swap 9 anntennas, install 9 rrus, install 1 dc trunk per dc6Details
swap 9 anntennas, install 9 rrus, install 1 dc trunk per dc6 | $10,000 |
| Apr 4, 2018 | Completed final sign-off Jun 2022 | 2300 26th St | replace 9 antennas on extg tower. n/a for maher.Details
replace 9 antennas on extg tower. n/a for maher. | $20,000 |
| Apr 4, 2018 | Completed final sign-off Apr 2019 | 30 Rickard St | replace (9) antennas on existing cell tower.replace (3) rrus. install (12) new rruvs. remove (6) coax lines. **n/a for maher**Details
replace (9) antennas on existing cell tower.replace (3) rrus. install (12) new rruvs. remove (6) coax lines. **n/a for maher** | $20,000 |
| Mar 30, 2018 | Completed final sign-off Mar 2020 | 201 Spear St | at&t wireless remove & replace 3 antennas swap out equipment, swap 3 (e) rrus-11(b4)+a2(b4) w/3 (n) rrus-32 b66. remove 6 rrus, remove cabinet, install 6 diplexers, install 1 battery rack & 3 strings of 155ah batteries, install 1 gps lte antenna, rmeove dus41 unit, remove xmuDetails
at&t wireless remove & replace 3 antennas swap out equipment, swap 3 (e) rrus-11(b4)+a2(b4) w/3 (n) rrus-32 b66. remove 6 rrus, remove cabinet, install 6 diplexers, install 1 battery rack & 3 strings of 155ah batteries, install 1 gps lte antenna, rmeove dus41 unit, remove xmu | $15,000 |
| Mar 30, 2018 | Completed final sign-off Mar 2019 | 1250 Columbus Av | at&t wireless r&r 6 antennas, install 3 fiber tricks, install 1 dc-12 in equipm area, install 3 dc6, 3 rrus-32 bgg, 3 rrus-32-b30, 3 rrus-4478, 3 rrus-12 b2, 1 gps antenna, swap 1 dos-41 with 1 5216 and 1 vmu in u2 cjassis. install 1 v2 & 1 19" rackDetails
at&t wireless r&r 6 antennas, install 3 fiber tricks, install 1 dc-12 in equipm area, install 3 dc6, 3 rrus-32 bgg, 3 rrus-32-b30, 3 rrus-4478, 3 rrus-12 b2, 1 gps antenna, swap 1 dos-41 with 1 5216 and 1 vmu in u2 cjassis. install 1 v2 & 1 19" rack | $15,000 |
| Mar 20, 2018 | Completed final sign-off Apr 2019 | 1201 Pacific Av | at&t modification: r&r 2(e) antennas w/2new antennas; install 2 new rrus. install power plant w/batteries; remove unused equip, paint antennas and cabling to mathc bldg. maher naDetails
at&t modification: r&r 2(e) antennas w/2new antennas; install 2 new rrus. install power plant w/batteries; remove unused equip, paint antennas and cabling to mathc bldg. maher na | $21,000 |
| Mar 20, 2018 | Never finaled issued Jun 2018, no final | 2001 37th Av | at&t modification: r&r 9 (e) antennas, w/9 new. r&r 9 (e) rrusa w/3new rrus; install 6 (n) rrus; remove unused equip; install striping and barricades per emf report maher naDetails
at&t modification: r&r 9 (e) antennas, w/9 new. r&r 9 (e) rrusa w/3new rrus; install 6 (n) rrus; remove unused equip; install striping and barricades per emf report maher na | $38,000 |
| Oct 10, 2017 | Never finaled issued May 2018, no final | 951 Howard St | swap 3 (e) antennas for 3 new antennas. swap 3 (e) radios for 3 new radio models. install xmu unit inside (e) rack & install 1 idl2 cable. ** maher: n/a **Details
swap 3 (e) antennas for 3 new antennas. swap 3 (e) radios for 3 new radio models. install xmu unit inside (e) rack & install 1 idl2 cable. ** maher: n/a ** | $15,000 |
| Mar 30, 2017 | Completed final sign-off Jul 2018 | 107 Sagamore St | att modification: r&r 3 extg antennas with 3 new antennas, install 3 new rrus-32 3 new dtmas, other small equipment, remove 2206 cabinet and all unused equipment. n/a for maherDetails
att modification: r&r 3 extg antennas with 3 new antennas, install 3 new rrus-32 3 new dtmas, other small equipment, remove 2206 cabinet and all unused equipment. n/a for maher | $33,000 |
| Mar 30, 2017 | Completed final sign-off Feb 2018 | 4175 Mission St | att modification: r&r 3 extg antennas with 3 new antennas, install 6nw tmha, 3 new rrus-e2, 3 new rrus-11, remove 2 extg cabinets, extg equip rack, 6 dtmas, r&r extg 2 dus41 with new dus5216 & nw xmu. paint antennas, cables to match. n/a for maherDetails
att modification: r&r 3 extg antennas with 3 new antennas, install 6nw tmha, 3 new rrus-e2, 3 new rrus-11, remove 2 extg cabinets, extg equip rack, 6 dtmas, r&r extg 2 dus41 with new dus5216 & nw xmu. paint antennas, cables to match. n/a for maher | $31,000 |