Permits filed here
31 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 12, 2024 | Completed final sign-off Dec 2024 | 227 Bay St | Amone Corp | 200 sq.ft. of concrete and rebar repair in deck slab of unit 109.Details
200 sq.ft. of concrete and rebar repair in deck slab of unit 109. | $25,000 |
| Dec 20, 2023 | Completed final sign-off May 2024 | 227 Bay St | San Francisco Fire Protection | verify existing sound level in sleeping areas are complying with sffc section 1103.7.6.1 indicating the dba readings in each living area and sleeping area are at least 75 dbaDetails
verify existing sound level in sleeping areas are complying with sffc section 1103.7.6.1 indicating the dba readings in each living area and sleeping area are at least 75 dba | |
| Jun 8, 2021 | Completed final sign-off Feb 2022 | 227 Bay St | Das Solutions (Interim) | sf errcs rebanding and equipment upgradeDetails
sf errcs rebanding and equipment upgrade | $10,000 |
| Nov 13, 2018 | Never finaled issued Nov 2018, no final | 227 Bay St | streetspaceDetails
streetspace | ||
| May 22, 2018 | Completed final sign-off Nov 2018 | 227 Bay St | San Francisco Fire Protection | add on to (e) system. install annunciator panel next to (e) panel & monitor module for newly installed radio system outputs. ref pa 2016-1110-2434 and 2018-0216-1578Details
add on to (e) system. install annunciator panel next to (e) panel & monitor module for newly installed radio system outputs. ref pa 2016-1110-2434 and 2018-0216-1578 | $1,000 |
| Feb 16, 2018 | Completed final sign-off Sep 2018 | 227 Bay St | installing errcs throughout building.Details
installing errcs throughout building. | $53,000 | |
| Aug 7, 2017 | Never finaled issued Aug 2017, no final | 227 Bay St | street space permit - renewal of permit # m789527Details
street space permit - renewal of permit # m789527 | ||
| Jul 25, 2017 | Completed final sign-off Aug 2017 | 227 Bay St | San Francisco Fire Protection | as builts for 2016-0216-9644, replace (e) wall mount horn strobes with ceiling mount & add one wall mount strobe on ground floor to refplect the jobsite. new devices will be tie-in to (e) notification circuite ref pa 2016-0422-5496, 2016-0620-0395 and 2016-1110-2434Details
as builts for 2016-0216-9644, replace (e) wall mount horn strobes with ceiling mount & add one wall mount strobe on ground floor to refplect the jobsite. new devices will be tie-in to (e) notification circuite ref pa 2016-0422-5496, 2016-0620-0395 and 2016-1110-2434 | $3,200 |
| Jul 24, 2017 | Completed final sign-off Aug 2017 | 227 Bay St | Adroit Solar **Bankrupt Ch7** | additiion of 15 4x10 solar hot water collectors, one 900 gal solar hot water tank, pump and controlsDetails
additiion of 15 4x10 solar hot water collectors, one 900 gal solar hot water tank, pump and controls | $40,100 |
| Jul 24, 2017 | Completed final sign-off Sep 2017 | 227 Bay St | Amone Corp | grand floor garage level: revision to pa#201503060182, new offices, bathroom at garage, new roll up garage door @ garage (legalize), remove 14 parking spaces. n/a ordinance #155-13Details
grand floor garage level: revision to pa#201503060182, new offices, bathroom at garage, new roll up garage door @ garage (legalize), remove 14 parking spaces. n/a ordinance #155-13 | $5,500 |
| Jun 12, 2017 | Never finaled issued Jun 2017, no final | 227 Bay St | sidewalk repairDetails
sidewalk repair | ||
| May 24, 2017 | Never finaled issued May 2017, no final | 227 Bay St | street spaceDetails
street space | ||
| Jan 10, 2017 | Never finaled issued Jan 2017, no final | 227 Bay St | street spaceDetails
street space | ||
| Nov 10, 2016 | Completed final sign-off Mar 2017 | 227 Bay St | San Francisco Fire Protection | ref. 201503060182; phase 4: due to remodeling & improvement of each unit in the center part of the bldg,new conduit & new notification appliances be installed.new power supply panel,new monitor modules for sprinkler devices & relay modules for elev,recall will be installed; maher n/aDetails
ref. 201503060182; phase 4: due to remodeling & improvement of each unit in the center part of the bldg,new conduit & new notification appliances be installed.new power supply panel,new monitor modules for sprinkler devices & relay modules for elev,recall will be installed; maher n/a | $16,000 |
| Sep 9, 2016 | Never finaled issued Sep 2016, no final | 227 Bay St | street spaceDetails
street space | ||
| Jun 20, 2016 | Completed final sign-off Aug 2017 | 227 Bay St | San Francisco Fire Protection | phase iii, install new notification appliances in the north part of the bld. new power supply & heat detector above. new devices will be tie-in to (e) fire control panel. ref pa 2015 0306 0182 ph i 2016 0216 9466 ph ii 2016 0422 5496 maher naDetails
phase iii, install new notification appliances in the north part of the bld. new power supply & heat detector above. new devices will be tie-in to (e) fire control panel. ref pa 2015 0306 0182 ph i 2016 0216 9466 ph ii 2016 0422 5496 maher na | $9,800 |
| May 13, 2016 | Never finaled issued May 2016, no final | 227 Bay St | street spaceDetails
street space | ||
| Apr 22, 2016 | Completed final sign-off Aug 2017 | 227 Bay St | San Francisco Fire Protection | all 3 fl: install new notification appliances inside remodel units in the south part of building and add to the system. install power supply panel s heat det above, new strobe in hallway ti 2015-0306-0182, 2016-0216-9644. phase 2 of a 4-phase project.Details
all 3 fl: install new notification appliances inside remodel units in the south part of building and add to the system. install power supply panel s heat det above, new strobe in hallway ti 2015-0306-0182, 2016-0216-9644. phase 2 of a 4-phase project. | $12,800 |
| Feb 16, 2016 | Completed final sign-off Aug 2017 | 227 Bay St | San Francisco Fire Protection | phase i,like for like fire system replacement w/new control panel,smoke deet & pull stn @the same location.install monitor modules to tie-in ex waterflow & tamper switch to new panel,(e)horn/strobes will be tie-in to new panel; maher n/aDetails
phase i,like for like fire system replacement w/new control panel,smoke deet & pull stn @the same location.install monitor modules to tie-in ex waterflow & tamper switch to new panel,(e)horn/strobes will be tie-in to new panel; maher n/a | $6,400 |
| Jan 28, 2016 | Completed final sign-off Sep 2017 | 227 Bay St | Amone Corp | moh rad priority permit- mod permit per permit #201503060182; maher n/aDetails
moh rad priority permit- mod permit per permit #201503060182; maher n/a | |
| Dec 2, 2015 | Completed final sign-off Aug 2017 | 227 Bay St | Value Fire Protection Inc | install fire sprinkler & standpipe at existing apartment bldg - 634 heads. underground included. ref bldg #2015-0306-0182. n/a maher ordinanceDetails
install fire sprinkler & standpipe at existing apartment bldg - 634 heads. underground included. ref bldg #2015-0306-0182. n/a maher ordinance | $128,000 |
| Mar 6, 2015 | Completed final sign-off Sep 2017 | 227 Bay St | Amone Corp | moh rad priority permit. per sheet a0.01. exterior revised from cement plaster to composite siding. interior upgrades, accessibility upgrades, roofing replacement. windows, exterior paint, lobby remodel. legalize room count as 50 units total. ** maher: n/a ***Details
moh rad priority permit. per sheet a0.01. exterior revised from cement plaster to composite siding. interior upgrades, accessibility upgrades, roofing replacement. windows, exterior paint, lobby remodel. legalize room count as 50 units total. ** maher: n/a *** | $6,191,281 |
| Nov 7, 2012 | Completed final sign-off Dec 2012 | 227 Bay St | B B J Electric, Inc | add notification devices to (e) fire alarm system for new tenant space-8 new devicesDetails
add notification devices to (e) fire alarm system for new tenant space-8 new devices | |
| Oct 9, 2012 | Completed final sign-off Dec 2012 | 227 Bay St | B B J Electric, Inc | replace 2 existing fire alarm panels with 1 new addressable smoke detectors doors added to original systemDetails
replace 2 existing fire alarm panels with 1 new addressable smoke detectors doors added to original system | $29,000 |
| Feb 4, 2008 | Completed final sign-off May 2008 | 227 Bay St | construct new wood lattice at the exterior rear of bldg. location: rear yard 25' to property line.Details
construct new wood lattice at the exterior rear of bldg. location: rear yard 25' to property line. | $10,000 | |
| May 30, 2007 | Never finaled issued May 2007, no final | 227 Bay St | new pa#200310076858 and#200701252562 to complete original work.Details
new pa#200310076858 and#200701252562 to complete original work. | $8,000 | |
| Mar 9, 2007 | Never finaled issued Mar 2007, no final | 227 Bay St | Tyco Integrated Security | renew for final 200608290810 for final inspectionDetails
renew for final 200608290810 for final inspection | |
| Jan 25, 2007 | Never finaled issued Jan 2007, no final | 227 Bay St | renew application 200310076858 to complete original workDetails
renew application 200310076858 to complete original work | $5,000 | |
| Aug 29, 2006 | Expired or cancelled expired Jul 2008 | 227 Bay St | Tyco Integrated Security | install dialer in garage area for monitoring fire signalsDetails
install dialer in garage area for monitoring fire signals | $4,920 |
| May 24, 2006 | Never finaled issued May 2006, no final | 227 Bay St | sidewalk repairDetails
sidewalk repair | ||
| Oct 7, 2003 | Expired or cancelled expired Jul 2008 | 227 Bay St | installation of standby generatorDetails
installation of standby generator | $235,000 |