Humza Shamid Chowdhry
- License
- S60911
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S60911 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Hc Structural Engineering
- On San Francisco permits
- Oct 2017 to Jun 2026
4 permits since 2000 (engineer on 4 permits): 1 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Amone Corp, Cypress Construction Co, Gci, Inc, Highland Construction & Remodeling Inc
- Architects
- Daniel Pho, Guion Chilldress, Jon Jang
- Engineers
- Antonio Jacksalem, Keith Huen, Meng Hsiu Chen, Wilson Lee
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Aug 2026 | 1390 Noriega St | Amone Corp | 1/f: interior tenant improvement to convert (e) office space to pharmacy on first floor. scope of work includes but not limited to interior demolition & new construction of partitions, ceilings, lighting, finishes, mep work. change exterior window to door, change storefront door to sliding doorDetails
1/f: interior tenant improvement to convert (e) office space to pharmacy on first floor. scope of work includes but not limited to interior demolition & new construction of partitions, ceilings, lighting, finishes, mep work. change exterior window to door, change storefront door to sliding door | $800,000 |
| Aug 19, 2025 | In progress issued Apr 2026 | 88 Spear St | Gci, Inc | construction of new non-structural partitions and wall finishes; installation of new flooring, ceiling, lighting, millwork, kitchen equipment; plumbing, electrical and lighting support proposed use; hvac modifications for new layoutDetails
construction of new non-structural partitions and wall finishes; installation of new flooring, ceiling, lighting, millwork, kitchen equipment; plumbing, electrical and lighting support proposed use; hvac modifications for new layout | $637,000 |
| Jun 12, 2025 | In progress issued Jul 2025 | 1731 39th Av | Cypress Construction Co | interior remodel, drywall, insolution, bathroom, lighting, floors, window (same location) plumbing (routing), electrical (replace knob and tube), backyard deck, paint, hvac replacment.Details
interior remodel, drywall, insolution, bathroom, lighting, floors, window (same location) plumbing (routing), electrical (replace knob and tube), backyard deck, paint, hvac replacment. | $200,000 |
| Oct 2, 2017 | Completed final sign-off Mar 2019 | 23 Robinhood Dr | Highland Construction & Remodeling Inc | replace hand rail/guard- replace in kind. add bbq & fire pit.Details
replace hand rail/guard- replace in kind. add bbq & fire pit. | $8,500 |