Block 3712, lot 023
88 Spear St
168 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 17, 2026 | In progress | 88 Spear St | tenant improvement of restaurant for levels 12 and 13 of an existing high rise | $1,795,870 | |
| May 4, 2026 | In progress | 88 Spear St | Gci, Inc | 1 & 2/fl- new interior ti partitions, doors, and interior glazing. (n) lighting, electrical wiring and data systems. (n) mechanial ductwork and equipment. (n) finishes. fire sprinkler and life safety systems deferred. no 3qwork | $2,797,784 |
| Jan 30, 2026 | In progress | 88 Spear St | Gci, Inc | rev202409040025 and deffered mep: arch changes-operable partition in multipurpose rm and removal of planters in basement lounge.relocate firewater pump to facilitage primign and access from a-rated corridor.reconfig spa and cold plunge rm to add depress slab and vault to make recessed spa.tenant drs | |
| Dec 12, 2025 | In progress | 88 Spear St | Gci, Inc | levels 3-11: demolition of non-structural walls & ceilings, and installtion of new finishes. new ceilings & new lighting in elevator lobbies. | $178,758 |
| Dec 9, 2025 | In progress | 88 Spear St | Gci, Inc | minor revision to pa# 202311281534, 202401174145, 202410032253: to revise layout of accessible parking for path of travel compliance including new da-05 request for vertical actuators to creat accessible route from parking area. | |
| Aug 19, 2025 | In progress | 88 Spear St | Gci, Inc | construction of new non-structural partitions and wall finishes; installation of new flooring, ceiling, lighting, millwork, kitchen equipment; plumbing, electrical and lighting support proposed use; hvac modifications for new layout | $637,000 |
| Aug 18, 2025 | In progress | 88 Spear St | Gci, Inc | ground floor-revision 202501148243 to install 3 additional micropiles for foundation. micropiles to remain in place to support spa pool on ground floor under separte permit. | $207,900 |
| Mar 25, 2025 | In progress | 88 Spear St | Gci, Inc | deferred submittal for tower crane erection. ref pa#202501148243 for micro-pile foundation for tower crane foundation. ref pa# 202409040025 for foundation and anchor steel for crane; ref pa# 202409040014 for l11 tie-in steel, crane installation and rental. | |
| Jan 31, 2025 | In progress | 88 Spear St | Gci, Inc | install micropile foundation to support project's temporary tower crane and building foundation. | $346,500 |
| Oct 3, 2024 | In progress | 88 Spear St | Gci, Inc | revision to pa 202311281534 for review of changes to parking area material chane from asphalt to concrete | |
| Oct 1, 2024 | In progress | 88 Spear St | Gci, Inc | construction of a 7,481 sf restaurant addition on the existing penthouse roof of the building, including the extension and upgrade of (2) existing elevators to new fsae elevators and elevator lobbies. | $2,226,950 |
| Sep 4, 2024 | In progress | 88 Spear St | Gci, Inc | retail and office renovation to (e) bldg. levels b, 1, 2 core, shell and interior amenities renovation. separation of north and south side of lvl 1 w/1-hr rated construction. construction of inter story feature stairs in basement to lvl 1, and lvl 1 to lvl 2. demo (e) restrooms and construct (n).... | $5,500,000 |
| Jan 17, 2024 | In progress | 60 Spear St | Gci, Inc | revision to 202311281534 for review of changes to parking grading location of north passageway door and new ramps for revised floor elevation change | |
| Nov 28, 2023 | In progress | 60 Spear St | Gci, Inc | demo & repaving of (e) parking for new waterproofing/repair, restriping of parking stalls/aisles to match (e), selective demo of basement walls, ceilings, mep elements, waterproofing associated w/parking, north passage drain, leaks asso w/(e) piping, & (e) structure where necessary, new min req emer | $75,050 |
| Sep 8, 2022 | Never finaled | 60 Spear St | Modus Rex Llc | dish wireless: install (6)(n) antennas, (12) (n) rrus, (1)(n) equipment cabinet, (2) (n) batteries. | $152,000 |
| Jun 13, 2022 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | basement: fire alarm. addition to the existing fire alarm system. 2 ceiling speaker strobes and 1 ceiling strobe to be added to provide proper coverage. ref pa# 202112164532. | $1,500 |
| Jun 8, 2022 | Completed | 60 Spear St | Richlen Construction | basement: provide new lighting & branch circuiting to existing panel. maintained some existing power and signal outlets & provided additional new power branch circuiting & raceway systems as required to new power and signal outlets. provided ca title-24 compliance forms. ref pa# 2021-1216-4532 | $30,000 |
| May 31, 2022 | Never finaled | 60 Spear St | R L H Fire Protection Inc | relocate 6 (e) pendent sprinklers in basement offices. no other work to the system. ref pa# 202112164532. | $1,000 |
| Dec 16, 2021 | Completed | 60 Spear St | Richlen Construction | interior t.i including demo and construction of non structural partitions, ceilings, lighting, finishes and millwork. basement level. | $45,783 |
| Oct 22, 2021 | Completed | 60 Spear St | Pomi Mechanical Inc | replace 2 supply fans with 2 new "q pac" fan arrays. replace 1 consenser water pump like for like. demo existing,ex coil & replace with chilled water coil, new 2 1/2" chilled water supply & return for new coil. | $80,000 |
| Jul 21, 2020 | Completed | 60 Spear St | Emcor Services/Mesa Energy Systems Inc | mechanical penthouse: replacement of 2 chillers & 2 fans. maher n/a | $500,000 |
| Sep 19, 2019 | Expired or cancelled | 60 Spear St | Waterproofing Associates | re-roofing. | $369,699 |
| Mar 13, 2019 | Never finaled | 60 Spear St | Rossi Builders Inc. | 9th floor: minor demolition, partitions, paint, carpet, and outlets. new partitiion to create two new offices in existing space, mep deferred | $50,000 |
| Mar 13, 2019 | Never finaled | 60 Spear St | Rossi Builders Inc. | 5th floor: minor demolition, partitions, mep deferredpaint, carpet, and outlets. | $15,000 |
| Jan 18, 2019 | Completed | 60 Spear St | Rossi Builders Inc., Premier Structures Inc | to obtain final inspection for all work completed under permit(s) 201609087023 and 201608255950. | |
| Dec 4, 2017 | Completed | 60 Spear St | architectural work only: replace extg carpet, add low walls. no plumbing, mech, elec., sprinkler or fire alarm work. n/a for maher | $50,000 | |
| Nov 28, 2017 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | fire alarm ti pyro comm will provide (4) smoke detectors & (4) magnetic door holders. ref pa 2016-0824-5872; n/a maher | $2,000 |
| Feb 8, 2017 | Completed | 60 Spear St | City Mechanical Inc | replace existing cooling tower, boiler, and boiler pump with new. reconnect new equipment to existing piping system | $450,000 |
| Sep 19, 2016 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | revision to approved permit 201608245872 change order scope demo of 2 fa devices. addition of 1 fire alarm notification appliance | |
| Sep 8, 2016 | Completed | 60 Spear St | Premier Structures Inc | revision to ref pa 201608124896 & 201608255950 demo of non load bearing walls. remove & replace lighting & receptacles. re-distribution of hvac duct. new finishes maher na | $10,000 |
| Aug 30, 2016 | Completed | 60 Spear St | Ayoob & Peery Plumbing Co Inc | per ti - relocate 13 fire sprinklers and plug 1 outlet to conform with new wall/ceiling layout. ref pa 201608124896 maher na | $2,642 |
| Aug 25, 2016 | Completed | 60 Spear St | Premier Structures Inc | 2nd floor: electrical submittal to ref pa 201608124896(arch/mech): connecting power to new light fixtures, new & relocated outlets & tenant equip, all connections to be made to (e) electrical panels, no changes to base bld ele system. no fsd's maher na | $30,000 |
| Aug 24, 2016 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | 2nd floor: t.i. project for fire alarm relocation of 2 extg nac devices and provision of 3 new nac devices. ref app#201608124896. n/a for maher | $7,500 |
| Aug 12, 2016 | Completed | 60 Spear St | Premier Structures Inc | 2nd floor: ti-including demo, new walls and finishes. redistribution of hvac. elect, sprinklers, fire alarm under spe permit maher na | $150,000 |
| Aug 12, 2016 | Completed | 60 Spear St | A & D Automatic Gate Co. | demolish e vehicular gate and bullard, new vehicular and pedestrian gates to match e fence. no change in occupancy , use, or area | $15,000 |
| Jan 26, 2016 | Never finaled | 60 Spear St | Premier Structures Inc | 5th floor: replace existing carpet, add low walls. n/a ordinance #155-13 | $50,000 |
| Jan 26, 2016 | Never finaled | 60 Spear St | Premier Structures Inc | 6th floor: replace existing carpet, add low walls. n/a ordinance #155-13 | $20,000 |
| Nov 23, 2015 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | 8th floor new fire alarm appliances added to a tenant improvement in an existing bldg to include: (16) speaker/strobes, (7) strobes, (1) smoke detector. ref pa #201510099316. n/a maher ordinance | $8,700 |
| Nov 13, 2015 | Completed | 60 Spear St | Ayoob & Peery Plumbing Co Inc | ti: add 13, relocate (55), and plug (12) outlets. to conform with new cieling/wall layout at 8th floor. ref pa 2015-1009-9316. maher na | $20,000 |
| Oct 9, 2015 | Never finaled | 60 Spear St | Premier Structures Inc | 8th floor, interior ti. sprinkler and fire alarm under separate permit. n/a maher ord. # 155-13 | $1,000,000 |
| Jul 14, 2015 | Expired or cancelled | 60 Spear St | Premier Structures Inc | 8th floor demolition of interior partitions, doors and ceiling only. deferred accessibility compliance by ab-017. (n/a for the maher). life safety deferred. | $50,000 |
| May 20, 2015 | Completed | 88 Spear St | install (n) fixture at checkout. remove partial ht walls behind check out fixtures. window graphics. maher na | $20,000 | |
| Mar 10, 2015 | Never finaled | 60 Spear St | Premier Structures Inc | remove and replace electrical distribution equip for compliances with title 24 meter requirements. new light fixtures, furniture feeds, receptacles throughout to accommodate new layout. ref 201412224246. n/a ordinance #155-13 | $450,000 |
| Feb 27, 2015 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | new fire alarm devices for a tenant improvement in an (e) bld to include: 8-wall speaker/strobes, 9-ceiling speaker/strobes 9th flr - 2014 1222 4246 maher - not req'd | $5,800 |
| Feb 25, 2015 | Never finaled | 60 Spear St | Premier Structures Inc | modification of hvac throughout floor: new vavs & assoc ductwork to accomodate new layout: ref permit 2014 1222 4246. n/a ordinance #155-13 | $100,000 |
| Feb 10, 2015 | Completed | 60 Spear St | Ayoob & Peery Plumbing Co Inc | 9th floor - add, relocate & removed fire sprinklers per tenant improvements - add 10, relcoate 53, remvoe 4. ref pa #2014.1222.4246. n/a maher ordinance | $32,382 |
| Jan 5, 2015 | Never finaled | 60 Spear St | Premier Structures Inc | interior demo only. removeal of existing partitions, doors, flooring, ceiling. per ab-017. future ti, hvac ele, sprinkler, fire alarm under separate permit. n/a maher ordinance | $50,000 |
| Dec 22, 2014 | Never finaled | 60 Spear St | Premier Structures Inc | 9th floor: minor demolitoin of existing interior to accomodate office ti. new partitions, see pre-app mtg minutes for glass in lobby walls- doors/hardware, acoustic ceilings, finishes, lighting. mep and fire alarm, sprinkler under separate permit. n/a for the maher. | $800,000 |
| Jul 31, 2014 | Never finaled | 88 Spear St | G P Fire Protection | add one and lower 2 sprinkler heads and raise 2 sprinkler heads for new ceiling heights and consult room. no new full height walls added. t.i. pa#201403251634. n/a ordinance #155-13 | $3,800 |
| Jun 9, 2014 | Never finaled | 60 Spear St | Thyssenkrupp Elevator Corp. | upgrade of elevator system to destination based elevator dispatching. all work & operation complies with sf administrative bulletin 090. all public signage for elevators complies with s.f. ab-090. n/a ordinance #155-13. | $35,000 |
| Apr 29, 2014 | Never finaled | 60 Spear St | street space & mta. | ||
| Apr 17, 2014 | Never finaled | 60 Spear St | street space | ||
| Mar 25, 2014 | Completed | 88 Spear St | Walgreen Company | remodel in an existing walgreens. work includes adding a consult room by the pharmacy, a hallway for access, new refrigerated cases near checkouts, and related work associated with these modificatopms. life safety under separate permit. mahr not required. less than 50 cu.yd. | $85,000 |
| Jan 10, 2014 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | elevator upgrade for tenant improvement on the 12th fl penthouse level. existing protected fire alarm system in place. pyro comm systems will provide 1 control relay for alternate floor elevator recall and 1 control relay for elevator hat light. | $5,000 |
| Nov 1, 2013 | Never finaled | 60 Spear St | street space permit | ||
| Oct 29, 2013 | Completed | 60 Spear St | Skyline Construction | provide 4 new vav cooling boxes, one new transfer fan and one splite system. new listing on 7th floor. ref. arch # 2013.09.19.7229. sprinklers and fire alarm separate permit. | $15,000 |
| Oct 22, 2013 | Completed | 60 Spear St | Pribuss Engineering Inc | fire sprinkler relocation/installation. re-locate 84 sprinkler heads and install 9 additional heads. | $47,860 |
| Oct 22, 2013 | Completed | 60 Spear St | R L H Fire Protection Inc | remove fire sprinkller from top of elevator shaft (s) & in elevator machine room. all pipe to be removed & plugged off outside room | $4,962 |
| Oct 18, 2013 | Completed | 60 Spear St | Bullard's Heating & Air Inc. | mechanical work only-install duct distribution & registers in restrooms only | $12,000 |
| Oct 15, 2013 | Completed | 60 Spear St | Pioneer Fire Inc. | relocate 12 pendants on floor 7 and 9 | $6,964 |
| Oct 11, 2013 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | install new fire alarm devices for new tenant build out on the 7th fl 16 speaker/strobes, 4 strobes,pa# 201309197229. | $7,000 |
| Sep 19, 2013 | Completed | 60 Spear St | Skyline Construction | 7th flr: tenant improvement including interior partitions and ceilings, adding conference rooms, it room,-mep and life safety under separate permit | $750,000 |
| Aug 29, 2013 | Completed | 60 Spear St | Skyline Construction | 7/f- interior demo only to consist of removal of existing partitions, doors, flooring & ceiling ab0.17 | $15,000 |
| Aug 27, 2013 | Completed | 60 Spear St | Source Planning And Construction Inc | 7th,8th & 9th floor interior tenant improvement to upgrade restrooms by demolishing & construction of partitions & replacing & relocating toilet room accessories. no addition or removal of any plumbing fixtures. f/a sprinklers sep. permits. | $200,000 |
| Aug 19, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 6/f- install decorative trophy case. | $30,000 |
| Jul 24, 2013 | Never finaled | 60 Spear St | street space and mta | ||
| May 7, 2013 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | 5th & 6th floors-add new fire alarm devices to new tenant build out-4 smoke detectors, 4 strobes, 39 speaker/strobes, 1 speaker. ti app# 201302210674 for 5th/ 201303071731 for 6th floor | $10,000 |
| May 7, 2013 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | 3rd & 4th floors-add new fire alarm devices to new tenant build out-3 smoke detectors, 34 speaker/strobes, 1 speaker | $10,000 |
| May 7, 2013 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | 2nd floor-add new fire alarm devices to new tenant build out-1 dual monitor module, 6 smoke detectors, 4 strobes, 10 speaker/strobes, 1 speaker | $7,000 |
| Apr 24, 2013 | Completed | 60 Spear St | Paganini Electric Corp(See Signatories) | 6th full floor t.i. including lights, power, & life safety, ref t.i. #2013.03.07.1731 | $180,000 |
| Apr 24, 2013 | Completed | 60 Spear St | Paganini Electric Corp(See Signatories) | 2nd full floor t.i. for lights, power, & life safety, ref t.i. #2013.02.19.0480. fire alarm and sprinkler installation to be under separate permit. | $180,000 |
| Apr 24, 2013 | Completed | 60 Spear St | Paganini Electric Corp(See Signatories) | 4th full floor t.i. including lights, power, & life safety, ref t.i. #2013.0219.0476 | $180,000 |
| Apr 24, 2013 | Completed | 60 Spear St | Paganini Electric Corp(See Signatories) | 3rd full floor t.i. including lights, power, ref t.i. #2013.02.21.0676 lifesafety under seperate permit | $180,000 |
| Apr 24, 2013 | Completed | 60 Spear St | Paganini Electric Corp(See Signatories) | 5th full floor t.i. for lights, power, & life safety, ref t.i. #2013.02.21.0674 | $180,000 |
| Apr 18, 2013 | Completed | 60 Spear St | Acco Engineered Systems Inc. Dba Acco En | install new exhaust fan and ductwork, air distribution and vav boxes for tenant build-out. 3rd floor. t.i ref pa# 201302210676 | $112,000 |
| Apr 18, 2013 | Completed | 60 Spear St | Acco Engineered Systems Inc. Dba Acco En | install new exhaust fan and ductwork, air distribution and vav boxes for tenant build-out. 4th floor. t.i ref pa# 201302190476 | $112,000 |
| Apr 18, 2013 | Completed | 60 Spear St | Acco Engineered Systems Inc. Dba Acco En | install new exhaust fan and ductwork, air distribution and vav boxes for tenant build-out. 5th floor. t.i ref pa# 201302210674 | $112,000 |
| Apr 15, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 3rd floor:revision to app#201302210676. change partition surrounding storage room to ceiling height . door remain unchanged. | |
| Apr 15, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 4th floor:revision to app#201302210476. change partition surrounding storage room to ceiling height . door remain unchanged. | |
| Apr 15, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 5th floor:revision to app#201302010674. change partition surrounding storage room to ceiling height . door remain unchanged. | |
| Apr 11, 2013 | Completed | 60 Spear St | Acco Engineered Systems Inc. Dba Acco En | new air distribution 1. installation of medium and low pressure ducts for t.i build out of 6th fl. 2. installation of new transer fans. | $112,000 |
| Apr 11, 2013 | Completed | 60 Spear St | Acco Engineered Systems Inc. Dba Acco En | 1.install new dx split systems. 2. install new air distribution for 2nd floor build out. | $112,000 |
| Apr 5, 2013 | Completed | 60 Spear St | Ayoob & Peery Plumbing Co Inc | 6th floor sprinkler t.i.: add & relocate fire sprinkler heads per tenant improvements. (45 add), (41 relocate) ti pa# 201303071731 | $44,200 |
| Apr 5, 2013 | Completed | 60 Spear St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads per tenant improvements. (13 add), (59 relocate), (10 remove), 4th floor. t.i pa# 201302210476 | $37,000 |
| Apr 5, 2013 | Completed | 60 Spear St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads per tenant improvements. (21 add), (53 relocate), (7 remove), 5th floor | $38,000 |
| Apr 5, 2013 | Completed | 60 Spear St | Ayoob & Peery Plumbing Co Inc | 3rd floor sprinkler t.i.: add & relocate fire sprinkler heads per tenant improvements. (52 add), (54 relocate) t.i pa# 201202210676 | $54,400 |
| Apr 5, 2013 | Completed | 60 Spear St | Ayoob & Peery Plumbing Co Inc | 2nd floor sprinkler t.i.: add & relocate fire sprinkler heads per tenant improvements. (28 add), (30 relocate). work includes installation of a two-head pre-action system. fire alarm work for detectors under separate permit. | $29,800 |
| Apr 3, 2013 | Completed | 60 Spear St | Intelligent Technologies & Services Inc | 2nd floor - provide (1) pre-action control panel, (2) smoke detectors & (1) bell for server room. ref pa #2013.0219.0480. | $9,879 |
| Apr 3, 2013 | Completed | 60 Spear St | Anderson, Rowe & Buckley, Inc. | 3rd,4th & 6th floor fire sprinkler system (existing t.i.) - relocate 4 sprinklers on 3rd flr, 4th flr & 6th flr, pa #2012.11.26.4795. | $6,000 |
| Apr 1, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | revision to permit application# 201302190480. including misc ceiling notes and partition notes. | |
| Mar 7, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 6th fl t.i. new partitions, doors, lighting, pantry. hvac, electrical, sprinkler, fire alarm & evacuation signs under separate permit. | $600,000 |
| Feb 21, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 3rd fl tenant improvement. new doors, partitions, lights, pantry. hvac, electrical, sprinkler, and fire alarm under separate permit | $600,000 |
| Feb 21, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 5th fl tenant improvement: new doors, partitions, lighting, pantry. hvac, electrical, sprinklers ad fire alarm under separate permit | $600,000 |
| Feb 19, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 2nd floor tenant improvement - new partitions, doors, lighting, pantry. hvac, electrical, sprinkler & fire alarm under separate permit. | $260,000 |
| Feb 19, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 4th floor tenant improvement - new partitions, doors, lighting, pantry. hvac, electrical, sprinkler & fire alarm under separate permit. | $440,000 |
| Jan 23, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 3rd/4th/5th/6th floors-interior stair development including new floor openings & new stair compenents (floors 3 thru 6) | $200,000 |
| Jan 15, 2013 | Completed | 60 Spear St | Hathaway Dinwiddie Co. | 2nd thru 6th floors- demo of (e) partitions ceiling & millwork in prepartion for ti bldgout under separate permit per ab-017 remains vacant. | $125,000 |
| Jan 11, 2013 | Never finaled | 60 Spear St | street space | ||
| Nov 26, 2012 | Completed | 60 Spear St | Skyline Construction | interior t.i. including minor demolition, new partitions,new doors and finishes on floors 2 through 6 | $200,000 |
| Oct 26, 2012 | Never finaled | 60 Spear St | street space & mta meter | ||
| Jul 20, 2012 | Completed | 60 Spear St | Skyline Construction | structural revision to app#201204027310 reference 201204027310 | |
| Jul 17, 2012 | Never finaled | 60 Spear St | street space | ||
| Apr 2, 2012 | Completed | 60 Spear St | Skyline Construction | building wide structural system upgrades (seismic) only. all work will be voluntary seismic improvement. the work is not intended to meet with the 2010 sfbc, section 3401.8 | $322,382 |
| Feb 15, 2012 | Never finaled | 60 Spear St | Skyline Construction | revision to 201111289630. add sheet a2.1 existing roof plan and new equipment curb detail. also to verify correct story count from 12 to 11 stories. | $1,000 |
| Jan 25, 2012 | Completed | 60 Spear St | Intelligent Technologies & Services Inc | new pre-action detection and contrls system within 11th floor it server room. one conventional control panel, 3 smoke detectors and one alarm bell. (ref sprinkler permit #201201051748) | $2,200 |
| Jan 17, 2012 | Completed | 60 Spear St | Pyro-Comm Systems, Inc. | 10th&11th:add speaker/strobes to conf. room, open office areas, breakroom & other area. add monitor modules for pre-action system. smoke detectors added for door holder coverage. smoke detector/duct detectors, added for mechanical connections, 8 relays,1 monitor, 13 smokes, 4 ducts, 29 a/v devices. | $14,000 |
| Jan 13, 2012 | Expired or cancelled | 88 Spear St | new refrigated cases in sales area, millwork @check stands. new patient consultation rm (ice rm), relocate employee rm, revise office re-config., new finishes & decor package in sales area. new beverage bar in sales area. new 3 compartment sink in storage area, remove wet lab photo dept. new mech un | $397,964 | |
| Jan 5, 2012 | Completed | 60 Spear St | Golden Gate Fire Protection Inc | fire sprinkler system upgrades; relocate 33 pendent sprinker heads and 49 upright heads on the 10th floor. relocate 85 pendent and 31 upright on the 11th floor. upgrade branch line restraints and earthquake braces. | $118,450 |
| Dec 20, 2011 | Never finaled | 60 Spear St | Skyline Construction | 11th floor-refer to arch pa# 2011-1128-9630-mechanical, electrical & plumbing work for tenant improvements | $250,000 |
| Nov 28, 2011 | Completed | 60 Spear St | Skyline Construction | interior tenant improvement including demo, new partitions, doors, ceilings, finishes. hvac,elec, fire suppression and fire alarm under sep permit | $750,000 |
| Nov 22, 2011 | Completed | 60 Spear St | Skyline Construction | 10th floor-interior tenant improvement including demolition, new partitions, doors, ceilings & finishes. | $550,000 |
| Oct 3, 2011 | Completed | 60 Spear St | Skyline Construction | 10th/11th floors-interior non structural demolition per ab-017 | $8,000 |
| Sep 14, 2010 | Never finaled | 88 Spear St | Walgreen Company | wallgreen. installation of a new revolving door by removing existing single swing doot at the store front | $50,000 |
| Nov 13, 2008 | Completed | 60 Spear St | Pribuss Engineering Inc | fire sprinkler t.i. ground , 2nd & 5th floor. relocate 27, changed out 16 & added 5 total of 48. | $9,850 |
| Oct 29, 2008 | Completed | 60 Spear St | revision to 200805061396 to clarify envelope compliance title 24 report from presciptive method to performance based | $1,000 | |
| Oct 27, 2008 | Never finaled | 60 Spear St | Pribuss Engineering Inc | to obtain final inspection for work approved under 200707308117. all work complete. | |
| Oct 27, 2008 | Never finaled | 60 Spear St | Pribuss Engineering Inc | to obtain final inspection for work approved under 200512220876. all work complete. | |
| Oct 23, 2008 | Never finaled | 60 Spear St | street space permit only. | ||
| Aug 13, 2008 | Completed | 60 Spear St | Red Hawk Fire & Security Ca Llc | replace existing conventional fire alarm system with view addressable fire alarm system. | $60,000 |
| Jul 3, 2008 | Completed | 60 Spear St | re-install banner to lower location on building wall to comply with planning nov #5335. size of 90' x 35', no higher than 100' above ground. | $1,000 | |
| Jun 19, 2008 | Never finaled | 60 Spear St | street space permit only. | ||
| Jun 2, 2008 | Never finaled | 60 Spear St | street space permit. | ||
| May 23, 2008 | Completed | 60 Spear St | remove banner from north side of building to comply with planning n.o.v. 5335 | $1,000 | |
| May 6, 2008 | Never finaled | 60 Spear St | street space permit only. | ||
| May 6, 2008 | Completed | 60 Spear St | D A Pope Inc | remodel of ground fl. 2nd floor building lobby & 5th fl. elevator lobby including restrooms upgrade on gr fl, 2nd & 5th fl. selected floor, wall & ceiling finishes upgrades. new building lobby entry store front & canopy.signage security & fire sprinkler under separate permit. | $1,000,000 |
| Aug 3, 2007 | Completed | 60 Spear St | renew of final inspection 200604138910 | ||
| Jul 30, 2007 | Completed | 60 Spear St | Pribuss Engineering Inc | fire sprinkler "as-built" delete 6 sprinklers, add 11 sprinklers. replace 4 ssu with 4 hsw sprinklers | $2,100 |
| Jun 18, 2007 | Completed | 60 Spear St | renew app #20000288530 for final inspection | ||
| Apr 13, 2006 | Expired or cancelled | 60 Spear St | California Suppresion Dba Calif. Protect | tie in two water flow detectors and two tamper switches to existing zone. life safety on 1st floor. | $3,080 |
| Feb 15, 2006 | Completed | 60 Spear St | Pribuss Engineering Inc | umbrella permit- sprinkler high rise retrofit ordinance 377-93 | $500 |
| Dec 22, 2005 | Completed | 60 Spear St | Pribuss Engineering Inc | fire sprinkler t.i. 96 sprinkler heads. various floors. elect / tel rooms. | $78,500 |
| Jul 14, 2004 | Expired or cancelled | 88 Spear St | Golden Gate Sign Company Inc. | to erect a single-faced electrical wall sign | $8,000 |
| Jul 6, 2004 | Completed | 60 Spear St | Walgreen Company | new structural support for pipe and plumbing penetrations, rev 200401154109 as built | $7,000 |
| Jun 18, 2004 | Never finaled | 60 Spear St | Wcp Svcs, Dba: Venture Builders | new hc ramp @loading area & new sloped walk @ rear exit.add work to appl#200401164239,200312172489, | $5,400 |
| Jun 7, 2004 | Completed | 60 Spear St | Pacific Auxiliary Fire Alarm | existing mfire alarm system to be expanded and additional devices to be added to the system for | $15,000 |
| May 5, 2004 | Completed | 60 Spear St | Geo M Robinson & Co | alter (e)sprinkler system to protect new retail space occuping g/f & basement.scope of work involves | $13,500 |
| Apr 15, 2004 | Never finaled | 88 Spear St | address assignment | ||
| Mar 29, 2004 | Completed | 60 Spear St | revise 200401154109.new entry dr,add ventilation screens,chg const type of mech mezz...... | $10,000 | |
| Feb 4, 2004 | Completed | 60 Spear St | Simplex Grinnell | fire alarm upgrade to bsmnt floors 1 & 2/10 new smoke detectors/2 duot detectors/1 powr supply/5 nw | $9,524 |
| Jan 16, 2004 | Completed | 60 Spear St | Wcp Svcs, Dba: Venture Builders | revision to 200109148349 | |
| Jan 16, 2004 | Completed | 60 Spear St | Wcp Svcs, Dba: Venture Builders | 1st floor, basement sprinkler remodel, reference 1st flr, basement | $26,000 |
| Jan 16, 2004 | Completed | 60 Spear St | Wcp Svcs, Dba: Venture Builders | basement- rework rated corridor for future tenant use. ada restrm upgrade fire sprkn under sep permi | $99,500 |
| Jan 15, 2004 | Completed | 60 Spear St | complete interior build out of a new walgreens including toilet rooms, sales area, 1-hr photo | $300,000 | |
| Jan 8, 2004 | Completed | 60 Spear St | provide mechanical, electrical, plumbing & lighting on 1st floor & basement. | $200,000 | |
| Dec 17, 2003 | Completed | 60 Spear St | Wcp Svcs, Dba: Venture Builders | ref. appl#200109148349 mech,elec,plumbing | |
| Dec 1, 2003 | Completed | 60 Spear St | Bcci Construction Company | life safety work on the 8th floor (no increase in office spacre) | $4,500 |
| Oct 29, 2003 | Completed | 60 Spear St | Bcci Construction Company | oti-4 8th floor sp | $6,000 |
| Oct 24, 2003 | Completed | 60 Spear St | Bcci Construction Company | oti-3,8th flr,el | $25,000 |
| Oct 16, 2003 | Completed | 60 Spear St | Bcci Construction Company | oti-2, 8th floor, me | $30,000 |
| Aug 19, 2003 | Completed | 60 Spear St | Bcci Construction Company | oti-1 8th floor el, me, l/s, sp | $35,000 |
| Aug 30, 2002 | Completed | 60 Spear St | oti-3 4/f sp | $3,000 | |
| Aug 23, 2002 | Completed | 60 Spear St | oti-2 4/f el me ls | $49,000 | |
| Jul 30, 2002 | Completed | 60 Spear St | oti-1 4th floor ltg mech ls spr | $105,000 | |
| Jun 21, 2002 | Completed | 60 Spear St | C B F Inc | life safety system modifications-strobe lights, horn strobes, smoke detector at 5th floor. | $10,000 |
| Jun 21, 2002 | In progress | 60 Spear St | C B F Inc | life safety system modifications. - strobe lights,horn strobes, smoke detector. at 5th floor | |
| May 24, 2002 | Completed | 60 Spear St | Wcp Svcs, Dba: Venture Builders | oti1- 5th floor, me, ls | $9,500 |
| Feb 8, 2002 | Completed | 60 Spear St | C B F Inc | 11th floor-modify fire alarm system 11 horn strobes, 4 strobes | $5,000 |
| Feb 5, 2002 | Completed | 60 Spear St | Cannon Constructors North Inc | oti-2 11th floor mech only | $8,875 |
| Jan 22, 2002 | Completed | 60 Spear St | Cannon Constructors North Inc | oti-1 - 11th floor ltg, mech, l/s | $35,000 |
| Sep 14, 2001 | Completed | 60 Spear St | Wcp Svcs, Dba: Venture Builders | expansion of grnd flr retail space to add 3,200 sq.ft. w/in footprint of (e)bldg | $1,200,000 |
| Jul 27, 2001 | Completed | 60 Spear St | Carli Construction, Inc. | oti-2 3/f el me ls sp | $177,000 |
| Jul 11, 2001 | Completed | 60 Spear St | Richlen Construction | demolition of interior non bearing partitions repair ceiling as req. no changes to existing lighting | $22,500 |
| Jul 5, 2001 | Completed | 60 Spear St | Intelligent Technologies & Services Inc | new fire pre-design system to include panel, graphic, detector & audibles | $13,000 |
| Feb 1, 2001 | Completed | 60 Spear St | Carli Construction, Inc. | oti-1 3rd fl ltg,me, ls,spr | $270,000 |
| Oct 10, 2000 | Completed | 60 Spear St | Carli Construction, Inc. | installation of cooling tower at 9th floor | $50,000 |
| May 19, 2000 | Expired or cancelled | 60 Spear St | Paradigm General Contractors | revise (e) 9th floor office, expland (e) server froom, replace (e) portable evaporators | $250,000 |
| Apr 28, 2000 | Expired or cancelled | 60 Spear St | single-faced wall sign | $1,000 | |
| Mar 9, 2000 | Expired or cancelled | 60 Spear St | Paradigm General Contractors | oti-1, el, ls, sp 3rd floor | $15,000 |