Arthur Flores
- License
- C58350
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C58350 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Condon-Johnson & Assocs Inc
- Based in
- Oakland
- On San Francisco permits
- Oct 2019 to Aug 2025
4 permits since 2000 (engineer on 3 permits, architect on 1 permit): 1 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Gci, Inc (2), Baines - Nibbi J V, Guzman Construction Group Inc., Nibbi Bros Assoc Inc.
- Architects
- Guion Chilldress (2), Joel E. Wilbur, Mark Giles, Mitun Daniel Solomon
- Engineers
- Christopher Ridley, David Clifton Mar, Debbie Grieves, Mario Mendoza, Neil Joson, Ryan Beaton, Taylor Berrian
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2025 | In progress issued Sep 2025 | 88 Spear St | Gci, Inc | ground floor-revision 202501148243 to install 3 additional micropiles for foundation. micropiles to remain in place to support spa pool on ground floor under separte permit.Details
ground floor-revision 202501148243 to install 3 additional micropiles for foundation. micropiles to remain in place to support spa pool on ground floor under separte permit. | $207,900 |
| Jun 2, 2025 | In progress issued Jul 2026 | 880 Mcallister St | Guzman Construction Group Inc. | 100% afforable senior housing for a 104,000sf type 1, 7 story/115 unit with commerical ground floor. 81 1-bedroom and 35-2 bedroom units. 2 ground floor landscape courtyard and roof terrace.Details
100% afforable senior housing for a 104,000sf type 1, 7 story/115 unit with commerical ground floor. 81 1-bedroom and 35-2 bedroom units. 2 ground floor landscape courtyard and roof terrace. | $70,000,000 |
| Jan 31, 2025 | In progress issued Mar 2025 | 88 Spear St | Gci, Inc | install micropile foundation to support project's temporary tower crane and building foundation.Details
install micropile foundation to support project's temporary tower crane and building foundation. | $346,500 |
| Oct 8, 2019 | Completed final sign-off Jun 2026 | 351 Friedell St | Nibbi Bros Assoc Inc., Baines - Nibbi J V | 100% affordable housing at hunter's point ship yard, erect a five stories 67 residential units type 1 max use building.Details
100% affordable housing at hunter's point ship yard, erect a five stories 67 residential units type 1 max use building. | $28,000,000 |