Anne Tornet
- License
- C6367
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- May 2011 to Oct 2019
5 permits since 2000 (architect on 5 permits): 5 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Nibbi Bros Assoc Inc. (3), Baines - Nibbi J V (2), Cahill Contractors Inc, James E Roberts-Obayashi Corporation
- Architects
- Debra Dawn Guenther
- Engineers
- David Clifton Mar (2), Mario Mendoza (2), Arthur Flores, Gregory Miller, Jason Ling, Mohit Kotecha, Ryan Beaton, Stephen Shaffer
- Subcontractors
- Robert Bullach
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 5
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2019 | Completed final sign-off Jun 2026 | 151 Friedell St | Nibbi Bros Assoc Inc., Baines - Nibbi J V | 100% affordable housing at hunter's point ship yard, erect a five stories 45 units type 1 construction residential building.Details
100% affordable housing at hunter's point ship yard, erect a five stories 45 units type 1 construction residential building. | $20,000,000 |
| Oct 8, 2019 | Completed final sign-off Jun 2026 | 351 Friedell St | Nibbi Bros Assoc Inc., Baines - Nibbi J V | 100% affordable housing at hunter's point ship yard, erect a five stories 67 residential units type 1 max use building.Details
100% affordable housing at hunter's point ship yard, erect a five stories 67 residential units type 1 max use building. | $28,000,000 |
| Aug 2, 2018 | Completed final sign-off Nov 2019 | 1038 Mission St | James E Roberts-Obayashi Corporation | ti build out of cold shell space, including open office, storage, conference, unisex restroom and breakroom 1068 sq ft. land use category per zoning (not occupancy ) is institutional.Details
ti build out of cold shell space, including open office, storage, conference, unisex restroom and breakroom 1068 sq ft. land use category per zoning (not occupancy ) is institutional. | $189,000 |
| May 22, 2018 | Completed final sign-off Aug 2018 | 626 Mission Bay Blvd North Bl | Nibbi Bros Assoc Inc. | revision to pa 2015-0727-2485-s clarification of the type and dimensions of the access panels at the elevator over run penthouse.Details
revision to pa 2015-0727-2485-s clarification of the type and dimensions of the access panels at the elevator over run penthouse. | |
| May 16, 2011 | Completed final sign-off Feb 2015 | 255 Broadway | Cahill Contractors Inc | to erect 6 story, 75 units residential, mercantile, assembly, business building.Details
to erect 6 story, 75 units residential, mercantile, assembly, business building. | $20,000,000 |