Ryan Beaton
- License
- 82786
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Kpff
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Nov 2026
31 permits since 2000 (engineer on 25 permits, architect on 6 permits): 21 completed, 10 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Silverado Contractors Inc (15), Ferma Corporation (3), Nibbi Bros Assoc Inc. (3), Baines - Nibbi J V (2), Cahill Contractors Llc., Crime Watch Security Sys Llc, Eco Fire Sprinklers Inc, Guzman Construction Group Inc., J O'driscoll Electrical Inc, Mcguire And Hester, S J Amoroso Construction
- Architects
- Adrienne Steichen, Andrea Cochran, Daniel Simons, Gregg Novicoff, Karin Payson, Marsha Maytum, Mitun Daniel Solomon, Ryan Raskop
- Engineers
- David Clifton Mar (2), Arthur Flores, Benjamin Noggle, Greg Wagner, Gregory Miller, Jonathan Gervais, Marco Alves, Mario Mendoza, Michael Voigtlander, Tommy Siu
- Authorized agents
- Brian Bolandi (6), Josh Bazinet
- Subcontractors
- Gary T. Gerber, Michael Hardcastle
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 14
- Commercial 3
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 11 permits have no location and are not shown.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 2 Santos St | mayoral ed 17-02: demo (e) type-v 2-story 8 residential unit building.Details
mayoral ed 17-02: demo (e) type-v 2-story 8 residential unit building. | $140,000 | |
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 1751 Sunnydale Av | mayoral ed 17-02: demo (e) type-v 2-story 8 residential unit building.Details
mayoral ed 17-02: demo (e) type-v 2-story 8 residential unit building. | $140,000 | |
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 1725 Sunnydale Av | mayoral ed 17-02: demo (e) type-v 2-story 8 residential unit building.Details
mayoral ed 17-02: demo (e) type-v 2-story 8 residential unit building. | $140,000 | |
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 1701 Sunnydale Av | mayoral ed 17-02: demo (e) type-v 2-story 8 residential unit building.Details
mayoral ed 17-02: demo (e) type-v 2-story 8 residential unit building. | $140,000 | |
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 2 Brookdale Av | mayoral ed 17-02: demo (e) type-v 2-story 8 residential unit building.Details
mayoral ed 17-02: demo (e) type-v 2-story 8 residential unit building. | $140,000 | |
| Nov 9, 2026 | In progress filed Nov 2026, not yet issued | 1800 Sunnydale Av | bldg 7f: demolition of 2-story, 12 units residential (r-2) apartment, type v-b. (1801-1815 sunnydale ave)Details
bldg 7f: demolition of 2-story, 12 units residential (r-2) apartment, type v-b. (1801-1815 sunnydale ave) | $140,000 | |
| Mar 23, 2026 | In progress filed Mar 2026, not yet issued | 2245 Post St | Cahill Contractors Llc. | to erect 4 stories, 1 basement, type ii-a, philanthoropic facility.Details
to erect 4 stories, 1 basement, type ii-a, philanthoropic facility. | $41,000,000 |
| Jun 16, 2025 | In progress issued May 2026 | 3433 03rd St | Nibbi Bros Assoc Inc. | stormwater plan review for pa 202408148660.Details
stormwater plan review for pa 202408148660. | |
| Apr 22, 2025 | In progress issued May 2025 | 600 Velasco Av | Ferma Corporation | priority process: demo a 2 story 36 dwgs residential bldg-type-5.Details
priority process: demo a 2 story 36 dwgs residential bldg-type-5. | $703,553 |
| Apr 17, 2025 | Completed final sign-off Aug 2025 | 700 Velasco Av | Ferma Corporation | priority processing: to demolish a 1 story commercial/childcare ,type 5 bldg.Details
priority processing: to demolish a 1 story commercial/childcare ,type 5 bldg. | $36,022 |
| Feb 7, 2025 | Completed final sign-off May 2025 | 1652 Sunnydale Av | Ferma Corporation, Mcguire And Hester | mayor dir 17-02 priority project-demo a 2 story type 2 bldg.Details
mayor dir 17-02 priority project-demo a 2 story type 2 bldg. | $596,643 |
| Dec 7, 2023 | In progress filed Dec 2023, not yet issued | 1500 15th St | erect a 13 story,179 dwelling unit with 2 basements mixed use residential with commerical bldg.Details
erect a 13 story,179 dwelling unit with 2 basements mixed use residential with commerical bldg. | $40,750,000 | |
| Nov 18, 2022 | Completed final sign-off May 2024 | 101 Blythdale Av | Silverado Contractors Inc | bldg 83b: demolition of 2-story, type v, residential bldg.Details
bldg 83b: demolition of 2-story, type v, residential bldg. | $214,465 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 121 Blythdale Av | Silverado Contractors Inc | bldg 82f: demolition of 2-story, type v, residential bldg.Details
bldg 82f: demolition of 2-story, type v, residential bldg. | $226,654 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 51 Santos St | Silverado Contractors Inc | bldg 36e: demolition of 2-story, type v, residential bldg.Details
bldg 36e: demolition of 2-story, type v, residential bldg. | $174,174 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 51 Santos St | Silverado Contractors Inc | common area: demolition of 1-story, type v, storage bldg.Details
common area: demolition of 1-story, type v, storage bldg. | $137,000 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 1748 Sunnydale Av | Silverado Contractors Inc | bldg 9f: demolition of 2-story, type v, residential bldg.Details
bldg 9f: demolition of 2-story, type v, residential bldg. | $225,887 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 50 Santos St | Silverado Contractors Inc | bldg 66e: demolition of 2-story, type v, residential bldg.Details
bldg 66e: demolition of 2-story, type v, residential bldg. | $152,770 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 1700 Sunnydale Av | Silverado Contractors Inc | bldg 11f: demolition of 2-story, type v, residential bldg.Details
bldg 11f: demolition of 2-story, type v, residential bldg. | $221,357 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 21 Santos St | Silverado Contractors Inc | bldg 37f: demolition of 2-story, type v, residential bldg.Details
bldg 37f: demolition of 2-story, type v, residential bldg. | $222,032 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 1949 Sunnydale Av | Silverado Contractors Inc | bldg 48f: demolition of 2-story, type v, residential bldg.Details
bldg 48f: demolition of 2-story, type v, residential bldg. | $240,676 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 115 Santos St | Silverado Contractors Inc | bldg 84a: demolition of 2-story, type v, residential bldg.Details
bldg 84a: demolition of 2-story, type v, residential bldg. | $135,646 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 1 Santos St | Silverado Contractors Inc | bldg 38e: demolition of 2-story, type v, residential bldg.Details
bldg 38e: demolition of 2-story, type v, residential bldg. | $148,679 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 144 Brookdale Av | Silverado Contractors Inc | bldg 55a: demolition of 2-story, type v, residential bldg.Details
bldg 55a: demolition of 2-story, type v, residential bldg. | $141,728 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 1724 Sunnydale Av | Silverado Contractors Inc | bldg 10f: demolition of 2-story, type v, residential bldg.Details
bldg 10f: demolition of 2-story, type v, residential bldg. | $228,702 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 120 Blythdale Av | Silverado Contractors Inc | bldg 67e: demolition of 2-story, type v, residential bldg.Details
bldg 67e: demolition of 2-story, type v, residential bldg. | $161,935 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 1651 Sunnydale Av | Silverado Contractors Inc | bldg 21df: demolition of 2-story, type v, residential bldg.Details
bldg 21df: demolition of 2-story, type v, residential bldg. | $93,472 |
| May 5, 2022 | Completed final sign-off Nov 2026 | 2550 Irving St | Eco Fire Sprinklers Inc, Guzman Construction Group Inc., Crime Watch Security Sys Llc, J O'driscoll Electrical Inc | to erect 7-story, type i-b, 90 dwelling units bldg with zero basements. to include residential support service office, property management office, bike parking, serice space, & residential parking with puzzle lift and pit stacker system. (100% affordable housing) mayor dir 13-01.Details
to erect 7-story, type i-b, 90 dwelling units bldg with zero basements. to include residential support service office, property management office, bike parking, serice space, & residential parking with puzzle lift and pit stacker system. (100% affordable housing) mayor dir 13-01. | $50,000,000 |
| Jun 3, 2021 | Completed final sign-off Apr 2025 | 1501 Sunnydale Av | Nibbi Bros Assoc Inc., Baines - Nibbi J V | sunnydale block 3a (lot 3)-priority 100% housing project. to erect 5-story, 4 stories of type 5 over 1 story of type 1, mixed use bldg with child center, retail, restaurants, wellness center and 80 residential units.Details
sunnydale block 3a (lot 3)-priority 100% housing project. to erect 5-story, 4 stories of type 5 over 1 story of type 1, mixed use bldg with child center, retail, restaurants, wellness center and 80 residential units. | $53,000,000 |
| Mar 26, 2021 | Completed final sign-off Jun 2026 | 160 Hahn St | S J Amoroso Construction | to erect a one story, no dwelling, no basement, type v-b building. new recreation center and herz playground improvements. interior gymnasium and multipurpose room, supporting office space, storage, kitchen. exterior fitness plaza, outdoor recreation spaces. small maintenance shed/yard.Details
to erect a one story, no dwelling, no basement, type v-b building. new recreation center and herz playground improvements. interior gymnasium and multipurpose room, supporting office space, storage, kitchen. exterior fitness plaza, outdoor recreation spaces. small maintenance shed/yard. | $10,000,000 |
| Oct 8, 2019 | Completed final sign-off Jun 2026 | 351 Friedell St | Nibbi Bros Assoc Inc., Baines - Nibbi J V | 100% affordable housing at hunter's point ship yard, erect a five stories 67 residential units type 1 max use building.Details
100% affordable housing at hunter's point ship yard, erect a five stories 67 residential units type 1 max use building. | $28,000,000 |