Jon Jang
- License
- C14335
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Jon Jang Architect
- Based in
- Redwood City
- On San Francisco permits
- Jul 2006 to Aug 2025
4 permits since 2000 (architect on 4 permits): 2 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cypress Construction Co (2), Alpha Restoration & Wateproof
- Engineers
- Humza Shamid Chowdhry, Mohammad Reza Saaber
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2025 | In progress issued May 2026 | 1731 39th Av | Cypress Construction Co | demolish, type 5b, 1-story, non-permitted rear shedDetails
demolish, type 5b, 1-story, non-permitted rear shed | $8,000 |
| Jun 12, 2025 | In progress issued Jul 2025 | 1731 39th Av | Cypress Construction Co | interior remodel, drywall, insolution, bathroom, lighting, floors, window (same location) plumbing (routing), electrical (replace knob and tube), backyard deck, paint, hvac replacment.Details
interior remodel, drywall, insolution, bathroom, lighting, floors, window (same location) plumbing (routing), electrical (replace knob and tube), backyard deck, paint, hvac replacment. | $200,000 |
| Dec 13, 2010 | Completed final sign-off Feb 2012 | 77 Grand View Av | Alpha Restoration & Wateproof | unit #303 -to comply w/comp #201065230: remove (e) balcony/deck on 3rd floor. deck will be completely removed from roof, a safety guardrail 42" min in height will be installed at existing sliding door . a separte per will be obtained if decides to reinstall the roof deck.Details
unit #303 -to comply w/comp #201065230: remove (e) balcony/deck on 3rd floor. deck will be completely removed from roof, a safety guardrail 42" min in height will be installed at existing sliding door . a separte per will be obtained if decides to reinstall the roof deck. | $500 |
| Jul 20, 2006 | Completed final sign-off Oct 2007 | 2524 Clay St | rebuild of main exterior stairs and side stairDetails
rebuild of main exterior stairs and side stair | $15,000 |