Block 3641, lot 023
3192 24th St
- City’s use
- Commercial Misc
- Built
- 1900
- Stories
- 3
- Units
- 13
- Rooms
- 8 bedrooms, 11 bathrooms
- Building
- 8,851 sq ft
- Lot
- 3,238 sq ft
- Zoning
- NCT1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2022 | Completed final sign-off Aug 2022 | 3192 24th St | Window Station Inc | unit #6: replacing 3 back windows with new energy efficient windows, same openingsDetails
unit #6: replacing 3 back windows with new energy efficient windows, same openings | $3,000 |
| Sep 9, 2021 | Completed final sign-off Jun 2022 | 3182 24th St | Air Zone Mechanical | install (2) heat pump system. rev. to approved pa 201809130103.Details
install (2) heat pump system. rev. to approved pa 201809130103. | $50,000 |
| Feb 25, 2021 | Completed final sign-off Mar 2022 | 3198 24th St | Crime Watch Security Sys Llc | upgrade existing fire alarm syste to monitor the new hood asnl system in the tenant improvement commercial unit "the jelly donut." includes 1 monitor module. ref fire# 2019-0624-4260, ref ti# 2019-1217-9801, ref ansl# 2020-0928-5349Details
upgrade existing fire alarm syste to monitor the new hood asnl system in the tenant improvement commercial unit "the jelly donut." includes 1 monitor module. ref fire# 2019-0624-4260, ref ti# 2019-1217-9801, ref ansl# 2020-0928-5349 | $1,000 |
| Sep 28, 2020 | Completed final sign-off May 2021 | 3198 24th St | Certified Fire And Safety | install ul300 anusl fire system to protect kitchen hood and cooking equipment. ref t.i. 201912179801.Details
install ul300 anusl fire system to protect kitchen hood and cooking equipment. ref t.i. 201912179801. | $1,500 |
| Jul 8, 2020 | Never finaled filed Jul 2020, never issued | 3190 24th St | street space | ||
| May 20, 2020 | Never finaled issued Jul 2020, no final | 3198 24th St | Amone Corp | mech, electrical & plumb work for interior t.i of (e) ground flr tenant space for (e) donut cafe. (n) furnace, restrm exhaust fan, type 1 hood & associated exhaust fan & makeup air unit. replace electrical branch cir panel,(n) water heater & grease interceptor. ref pa#'s 201809130103, 201912179801Details
mech, electrical & plumb work for interior t.i of (e) ground flr tenant space for (e) donut cafe. (n) furnace, restrm exhaust fan, type 1 hood & associated exhaust fan & makeup air unit. replace electrical branch cir panel,(n) water heater & grease interceptor. ref pa#'s 201809130103, 201912179801 | $100,000 |
| Dec 17, 2019 | Completed final sign-off Jun 2021 | 3198 24th St | Amone Corp | interior improvement of e gr fl tenant space for existing donut cafe. scope to include new lighting, finishes, throughout. new kitchen equipment, e unisex restroom to remain, no additional sq footage addedDetails
interior improvement of e gr fl tenant space for existing donut cafe. scope to include new lighting, finishes, throughout. new kitchen equipment, e unisex restroom to remain, no additional sq footage added | $30,000 |
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 3190 24th St | street spaceDetails
street space | ||
| Nov 8, 2019 | Completed final sign-off Feb 2020 | 3186 24th St | Amone Corp | to comply with nov 201558587. verify/legalize existing wall heater flue installed previouslyDetails
to comply with nov 201558587. verify/legalize existing wall heater flue installed previously | $500 |
| Oct 31, 2019 | Completed final sign-off Jun 2022 | 3182 24th St | Amone Corp | rev to pa201809130103: structural drawings for electrical room, finished floor, beam/footer replacement.Details
rev to pa201809130103: structural drawings for electrical room, finished floor, beam/footer replacement. | $10,000 |
| Oct 8, 2019 | Completed final sign-off Jun 2022 | 3182 24th St | Amone Corp | revision to pa 201809130103. infill basementsDetails
revision to pa 201809130103. infill basements | |
| Oct 8, 2019 | Completed final sign-off Jun 2022 | 3182 24th St | Amone Corp | revision to pa 201809130101. infill basementsDetails
revision to pa 201809130101. infill basements | |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 3190 24th St | street spaceDetails
street space | ||
| Jul 24, 2019 | Completed final sign-off Oct 2019 | 3182 24th St | Gateway Roofing And Water Proofing Inc | reroofing.Details
reroofing. | $30,280 |
| Jun 24, 2019 | Completed final sign-off Apr 2022 | 3190 24th St | Crime Watch Security Sys Llc | upgrade (e) fire alarm to comply w/ sffc section 1103.7.6.1 ref pa 201902062247Details
upgrade (e) fire alarm to comply w/ sffc section 1103.7.6.1 ref pa 201902062247 | $14,000 |
| Apr 12, 2019 | Completed final sign-off Aug 2019 | 3190 24th St | Security Engineers Inc | emergency fire alarm replacement of control panel and 2 bells with horn strobes. ref app#201902062247Details
emergency fire alarm replacement of control panel and 2 bells with horn strobes. ref app#201902062247 | $2,500 |
| Feb 6, 2019 | Completed final sign-off Feb 2020 | 3190 24th St | Amone Corp | to comply w/ 201571452. exterior siding repairs, roof work, window replacement in kind, interior paint & watch patching, flooring replacement, electrical system upgrades, plumbing repairs, fire alarm system, bathroom improvements, kitchen improvements and accessibility upgradesDetails
to comply w/ 201571452. exterior siding repairs, roof work, window replacement in kind, interior paint & watch patching, flooring replacement, electrical system upgrades, plumbing repairs, fire alarm system, bathroom improvements, kitchen improvements and accessibility upgrades | $600,000 |
| Sep 13, 2018 | Completed final sign-off Jun 2022 | 3182 24th St | Amone Corp | per sfebc chapter 4d engineering criteria 2016 cebc appendix a4 -soft story retrofit for commercial portion (1st floor) and associated interior ada improvements at (e) first floor. ref #2018-0913-0101 (residential)Details
per sfebc chapter 4d engineering criteria 2016 cebc appendix a4 -soft story retrofit for commercial portion (1st floor) and associated interior ada improvements at (e) first floor. ref #2018-0913-0101 (residential) | $200,000 |
| Sep 13, 2018 | Completed final sign-off Jun 2022 | 3182 24th St | Amone Corp | soft story retrofit for residential portion (2nd and 3rd floors) per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. ref: 2018-0913-0103 (commercial).Details
soft story retrofit for residential portion (2nd and 3rd floors) per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. ref: 2018-0913-0103 (commercial). | $200,000 |
| May 18, 2017 | Completed final sign-off Sep 2017 | 3194 24th St | no construction requires only chair massage in addition to (e) nail salon. no change of use. movable furnitures (massage chairs). no massage services on site.Details
no construction requires only chair massage in addition to (e) nail salon. no change of use. movable furnitures (massage chairs). no massage services on site. | ||
| Jun 3, 2015 | Completed final sign-off May 2016 | 3182 24th St | to comply with complaint 201541551. notice type: items 1 - 12. to repair rear stairs less than 50%Details
to comply with complaint 201541551. notice type: items 1 - 12. to repair rear stairs less than 50% | $1,500 | |
| Mar 25, 2013 | Never finaled issued Mar 2013, no final | 3182 24th St | street spaceDetails
street space | ||
| Dec 2, 2008 | Completed final sign-off Oct 2021 | 3194 24th St | Fluoresco Lighting & Sign | non-structural single faced wall sign.Details
non-structural single faced wall sign. | $2,000 |
| Dec 2, 2008 | Completed final sign-off Oct 2021 | 3194 24th St | Fluoresco Lighting & Sign | non-structural double faced projecting sign.Details
non-structural double faced projecting sign. | $2,000 |
| Jan 3, 2007 | Never finaled issued Jan 2007, no final | 3182 24th St | sidewalk permit only.Details
sidewalk permit only. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.