Steve Curry
- License
- 3364
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- authorized agent-others, engineer
- Firm
- Murphy Burr Curry
- On San Francisco permits
- Jun 2002 to Mar 2023
8 permits since 2000 (engineer on 7 permits, authorized agent-others on 1 permit): 5 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Baines - Nibbi J V (2), Guzman Construction Group Inc., Hathaway Dinwiddie Co., Trainor Commercial Construction Inc.
- Architects
- David Thomas Crotty, Gerald Tierney, Lois Loria, Pamela Anee Collier
- Engineers
- Ray Keane (2), Christopher James Wood, Stuart Hill
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 5
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 23, 2023 | Never finaled issued Aug 2023, no final | 150 Stockton St | Trainor Commercial Construction Inc. | store in store interior only build with new non-load bearng walls, finishes, elec fixtures, and wiring, hvac workDetails
store in store interior only build with new non-load bearng walls, finishes, elec fixtures, and wiring, hvac work | $165,000 |
| Oct 13, 2021 | Completed final sign-off Oct 2023 | 4101 Noriega St | Guzman Construction Group Inc. | full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordableDetails
full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordable | $6,670,000 |
| Jul 16, 2021 | Never finaled filed Jul 2021, never issued | 2741 16th St | to erect 4 stories over 1 basement, type 1b, parking/mech & pdr/labDetails
to erect 4 stories over 1 basement, type 1b, parking/mech & pdr/lab | $35,650,309 | |
| Jul 16, 2021 | Never finaled filed Jul 2021, never issued | 2741 16th St | this project for 2741 16th street is for the erection of a single story roof extension to the existing building at 2741 16th street and all streetscape and lot area improvements.Details
this project for 2741 16th street is for the erection of a single story roof extension to the existing building at 2741 16th street and all streetscape and lot area improvements. | $4,304,992 | |
| Dec 3, 2020 | Completed final sign-off Sep 2021 | 290 Malosi St | Baines - Nibbi J V | priority processing. emergency responder radio communication system (errcs- deferred submittal from #2018-0620-2372 s)Details
priority processing. emergency responder radio communication system (errcs- deferred submittal from #2018-0620-2372 s) | $131,827 |
| Nov 18, 2020 | Completed final sign-off Jun 2022 | 242 Hahn St | Baines - Nibbi J V | priority processing - solar hot water deferred submittalDetails
priority processing - solar hot water deferred submittal | $330,000 |
| Jul 16, 2012 | Completed final sign-off Apr 2014 | 420 Montgomery St | Hathaway Dinwiddie Co. | new exterior maintenance system/window washing. new and modified guardrails are to be installed that are compliant with ca building code, additional structural steel added to e steel framing. 2 fire standpipes are new grating with support beams installed at top of sw smoke shaft. elec plumbing workDetails
new exterior maintenance system/window washing. new and modified guardrails are to be installed that are compliant with ca building code, additional structural steel added to e steel framing. 2 fire standpipes are new grating with support beams installed at top of sw smoke shaft. elec plumbing work | $1,855,000 |
| Jun 11, 2002 | Completed final sign-off Aug 2003 | 500 Indiana St | rev to approved bldg permit appn. 9708008;revise fndtn system as shown on plansDetails
rev to approved bldg permit appn. 9708008;revise fndtn system as shown on plans |