Block 0313, lot 018
150 Stockton St
- City’s use
- Commercial Retail
- Stories
- 6
- Lot
- 41,777 sq ft
- Zoning
- C3R
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
80 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 5, 2024 | In progress issued Nov 2024 | 150 Stockton St | Potter Fire Protection | 2/fl- ref 202408078167- add (2) fire sprinklersDetails
2/fl- ref 202408078167- add (2) fire sprinklers | $1,800 |
| Oct 10, 2024 | In progress issued Oct 2024 | 150 Stockton St | Potter Fire Protection | relocate 9 fire sprinklers; demo 3 fire sprinklers using victaulic vs2 flex drops. ref pa 202404099634Details
relocate 9 fire sprinklers; demo 3 fire sprinklers using victaulic vs2 flex drops. ref pa 202404099634 | $6,300 |
| Aug 13, 2024 | In progress issued Aug 2024 | 150 Stockton St | Everon Llc | fire alarm t.i. for elevator medernization: add 1 emr smoke detector fa control relayDetails
fire alarm t.i. for elevator medernization: add 1 emr smoke detector fa control relay | $1,600 |
| Aug 7, 2024 | In progress issued Oct 2024 | 150 Stockton St | Trainor Commercial Construction Inc. | 2/f: ti for (e) retail space, scope of work includes millwork, light mechanical work, ceiling lighting is (e) to remain. fitting rooms and cash wrap are (e) to remain. light partition (demo) work. no change in use, occupancy, or zoning. (905 sf total)Details
2/f: ti for (e) retail space, scope of work includes millwork, light mechanical work, ceiling lighting is (e) to remain. fitting rooms and cash wrap are (e) to remain. light partition (demo) work. no change in use, occupancy, or zoning. (905 sf total) | $135,800 |
| Aug 1, 2024 | Completed final sign-off Aug 2024 | 150 Stockton St | Potter Fire Protection | lower (3) fire sprinklers. ref permit # 202404099637Details
lower (3) fire sprinklers. ref permit # 202404099637 | $1,580 |
| Apr 9, 2024 | In progress issued Oct 2024 | 150 Stockton St | Trainor Commercial Construction Inc. | 2nd floor interior tenant improvement within (e) retail store scope of work includes vendor shop build out including millwork and electrical no change in use, occupancy, egress or zoningDetails
2nd floor interior tenant improvement within (e) retail store scope of work includes vendor shop build out including millwork and electrical no change in use, occupancy, egress or zoning | $214,500 |
| Apr 9, 2024 | In progress issued Jun 2024 | 150 Stockton St | Trainor Commercial Construction Inc. | interior tenant improvement of existing retail space for new vendor, work to include built in millwork, lighting and electrical. no change in use, occupancy, egress or zoning. no exterior work and no sf addition.Details
interior tenant improvement of existing retail space for new vendor, work to include built in millwork, lighting and electrical. no change in use, occupancy, egress or zoning. no exterior work and no sf addition. | $45,000 |
| Sep 7, 2023 | Never finaled issued Sep 2023, no final | 150 Stockton St | Potter Fire Protection | relocate (8) and plug (3) fire sprinklers. no under ground work.ref 202303234285.Details
relocate (8) and plug (3) fire sprinklers. no under ground work.ref 202303234285. | $4,200 |
| May 2, 2023 | Never finaled issued May 2023, no final | 150 Stockton St | Potter Fire Protection | relocate 10, add 2, demo 4 fire sprinklers. ref 202211166624Details
relocate 10, add 2, demo 4 fire sprinklers. ref 202211166624 | $6,300 |
| Mar 23, 2023 | Never finaled issued Aug 2023, no final | 150 Stockton St | Trainor Commercial Construction Inc. | store in store interior only build with new non-load bearng walls, finishes, elec fixtures, and wiring, hvac workDetails
store in store interior only build with new non-load bearng walls, finishes, elec fixtures, and wiring, hvac work | $165,000 |
| Nov 16, 2022 | Never finaled issued Jan 2023, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 1/flr: tenant improvement of retail space for new vendors, work to include demo and installation of partitions, finishes, loose fixtures and ceiling and lighting remodel. mech and elec work as req. no change of use, occupancy, egress, or zoning in the app. no exterior work.Details
1/flr: tenant improvement of retail space for new vendors, work to include demo and installation of partitions, finishes, loose fixtures and ceiling and lighting remodel. mech and elec work as req. no change of use, occupancy, egress, or zoning in the app. no exterior work. | $90,000 |
| Sep 20, 2022 | Expired or cancelled withdrawn Nov 2022 | 150 Stockton St | 1/f: t.i. of (e) retail including floor, finishes, millwork, partitions, merchanical, electricalDetails
1/f: t.i. of (e) retail including floor, finishes, millwork, partitions, merchanical, electrical | $200,000 | |
| Aug 17, 2022 | Never finaled issued Sep 2022, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 2/f ti of (e) retail, new vendor, work to include millwork, flooring, finishes and electrical fixtures.Details
2/f ti of (e) retail, new vendor, work to include millwork, flooring, finishes and electrical fixtures. | $150,000 |
| Oct 18, 2021 | Never finaled issued Oct 2021, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 3/f: tenant improvement: architectural walls, doors, finishes, fixtures and ceiling/lighting remodel (e) hvac systems to remainDetails
3/f: tenant improvement: architectural walls, doors, finishes, fixtures and ceiling/lighting remodel (e) hvac systems to remain | $120,000 |
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 150 Stockton St | Trainor Commercial Construction Inc. | installation of stockroom shelving, 3rd floor; ref pa#2019-0510-0303.Details
installation of stockroom shelving, 3rd floor; ref pa#2019-0510-0303. | $6,000 |
| Sep 3, 2019 | Completed final sign-off Dec 2019 | 150 Stockton St | Red Hawk Fire & Security Ca Llc | 1st floor add 4 cieling speaker /strobes ref app#20190510299. n/a for maherDetails
1st floor add 4 cieling speaker /strobes ref app#20190510299. n/a for maher | $5,500 |
| Sep 3, 2019 | Never finaled issued Sep 2019, no final | 150 Stockton St | Red Hawk Fire & Security Ca Llc | 3rd floor: add 5 ceiling speaker/strobes. add 2 wall strobes. ti app#201905100303. n/a for maherDetails
3rd floor: add 5 ceiling speaker/strobes. add 2 wall strobes. ti app#201905100303. n/a for maher | $6,500 |
| Aug 2, 2019 | Completed final sign-off Oct 2019 | 150 Stockton St | Potter Fire Protection | 1/f: relocate 10 and add 2 fire sprinklers ref 201905100299Details
1/f: relocate 10 and add 2 fire sprinklers ref 201905100299 | $6,300 |
| Aug 2, 2019 | Completed final sign-off Oct 2019 | 150 Stockton St | Potter Fire Protection | 3/f: relocate 21 and add 3 fire sprinlkers ref 201905100303Details
3/f: relocate 21 and add 3 fire sprinlkers ref 201905100303 | $12,000 |
| May 10, 2019 | Never finaled issued Jul 2019, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 1st flr. interior improvements within an (e)retail store. walls, doors, finishes, ceiling and lighting remodel.Details
1st flr. interior improvements within an (e)retail store. walls, doors, finishes, ceiling and lighting remodel. | $175,000 |
| May 10, 2019 | Never finaled issued Jul 2019, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 3rd flr. interior improvements within an (e)retail store. walls, doors, finishes, ceiling and lighting remodel.Details
3rd flr. interior improvements within an (e)retail store. walls, doors, finishes, ceiling and lighting remodel. | $192,565 |
| Jul 19, 2018 | Never finaled issued Jul 2018, no final | 150 Stockton St | Trainor Commercial Construction Inc. | small ti area within a major retail store, adding casework fixtures, minor ceiling, lighting, mechanical, electrical remodel. no exterior work, no removal of historical fabrickDetails
small ti area within a major retail store, adding casework fixtures, minor ceiling, lighting, mechanical, electrical remodel. no exterior work, no removal of historical fabrick | $80,000 |
| May 18, 2018 | Never finaled issued May 2018, no final | 150 Stockton St | Potter Fire Protection | fire sprinkler 1st fl: relocate 5 , demo 4 fire sprinklers. ref pa #201805027953. maher naDetails
fire sprinkler 1st fl: relocate 5 , demo 4 fire sprinklers. ref pa #201805027953. maher na | $2,750 |
| May 18, 2018 | Never finaled issued May 2018, no final | 150 Stockton St | Potter Fire Protection | fire sprinkler 3rd fl: relocate 4, demo 2 fire sprinlers. ref pa #201805098588. maher naDetails
fire sprinkler 3rd fl: relocate 4, demo 2 fire sprinlers. ref pa #201805098588. maher na | $2,750 |
| May 9, 2018 | Never finaled issued May 2018, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 3rd floor - ti within an (e) retail space, sinishes, ele, lighting, power, soffit framing maher naDetails
3rd floor - ti within an (e) retail space, sinishes, ele, lighting, power, soffit framing maher na | $45,500 |
| May 2, 2018 | Never finaled issued May 2018, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 1st fl: interior tenant improvemnt in existing retail store, includes mechanical & electrical. maher naDetails
1st fl: interior tenant improvemnt in existing retail store, includes mechanical & electrical. maher na | $100,000 |
| Mar 7, 2018 | Completed final sign-off Apr 2018 | 150 Stockton St | Potter Fire Protection | 4/f: relocate (2) and plug (1) fire sprinkler in women's restroom. ref pa #201802080760. maher naDetails
4/f: relocate (2) and plug (1) fire sprinkler in women's restroom. ref pa #201802080760. maher na | $1,500 |
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 4th flr - mep's for 201802080760 and revision electrical maher naDetails
4th flr - mep's for 201802080760 and revision electrical maher na | $8,000 |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 4th flr - interior improvements to womens customer restroom, within (e) retail store. includes finishes, doors, ceiling and lighting maher naDetails
4th flr - interior improvements to womens customer restroom, within (e) retail store. includes finishes, doors, ceiling and lighting maher na | $32,000 |
| Mar 7, 2016 | Completed final sign-off Apr 2016 | 150 Stockton St | Potter Fire Protection | basement: relocate 12 and plug 5 fire sprinklers. ref app#201602089076Details
basement: relocate 12 and plug 5 fire sprinklers. ref app#201602089076 | $6,000 |
| Mar 7, 2016 | Completed final sign-off Apr 2016 | 150 Stockton St | Potter Fire Protection | 2nd floor: relocate 10, add 1 and plug 4 fire sprinklers. ref app#201602089076Details
2nd floor: relocate 10, add 1 and plug 4 fire sprinklers. ref app#201602089076 | $5,500 |
| Feb 8, 2016 | Never finaled issued Feb 2016, no final | 150 Stockton St | Marini Construction Inc | 2nd floor t.i. mechanical and electrical permit only for interior remodel. vendor stop (cucinelli)Details
2nd floor t.i. mechanical and electrical permit only for interior remodel. vendor stop (cucinelli) | $39,800 |
| Feb 8, 2016 | Never finaled issued Feb 2016, no final | 150 Stockton St | Marini Construction Inc | basement remodel area for tom ford vendor shop, includes interior partitions, ceiling, fixures and finishes. mechanical and electrical under seperate permit #201501165969Details
basement remodel area for tom ford vendor shop, includes interior partitions, ceiling, fixures and finishes. mechanical and electrical under seperate permit #201501165969 | $133,980 |
| Feb 8, 2016 | Never finaled issued Feb 2016, no final | 150 Stockton St | Marini Construction Inc | 2nd floor t.i. : floor finishes, paint, fixtures, ceiling and lighting of cuchinelly vender shop sales area. mechanical and electrical under seperate permit.Details
2nd floor t.i. : floor finishes, paint, fixtures, ceiling and lighting of cuchinelly vender shop sales area. mechanical and electrical under seperate permit. | $35,000 |
| Dec 1, 2015 | Never finaled issued Dec 2015, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 1st floor electrical work - reference to #201509298365 & 201510099332. title 24.Details
1st floor electrical work - reference to #201509298365 & 201510099332. title 24. | $30,000 |
| Nov 19, 2015 | Completed final sign-off Jan 2016 | 150 Stockton St | Potter Fire Protection | 1st floor - relocate (12), add (3) , plug (5) fire sprinklers, ref pa #201509298365.Details
1st floor - relocate (12), add (3) , plug (5) fire sprinklers, ref pa #201509298365. | $7,500 |
| Oct 21, 2015 | Never finaled issued Oct 2015, no final | 150 Stockton St | Red Hawk Fire & Security Ca Llc | add 7 speaker strobesDetails
add 7 speaker strobes | $12,000 |
| Oct 14, 2015 | Never finaled issued Oct 2015, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 1st floor: titlet 24 interior tenant improvement lighting. revision to 201508103847Details
1st floor: titlet 24 interior tenant improvement lighting. revision to 201508103847 | $10,000 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 150 Stockton St | Trainor Commercial Construction Inc. | revision to 201509298365. add structural calculations and 1 sheet s1.0.Details
revision to 201509298365. add structural calculations and 1 sheet s1.0. | |
| Oct 8, 2015 | Completed final sign-off Dec 2015 | 150 Stockton St | Potter Fire Protection | relocate (5) and plug (3) fire sprinklers. t.i. pa# 201507272488Details
relocate (5) and plug (3) fire sprinklers. t.i. pa# 201507272488 | $2,500 |
| Oct 8, 2015 | Completed final sign-off Dec 2015 | 150 Stockton St | Potter Fire Protection | relocate (4) and plug (2) fire sprinklers. t.i. pa# 201508103847Details
relocate (4) and plug (2) fire sprinklers. t.i. pa# 201508103847 | $2,000 |
| Sep 29, 2015 | Never finaled issued Oct 2015, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 1st floor:interior remodel include walls, doors, and ceiling. electrical and mechanical under separate permit.Details
1st floor:interior remodel include walls, doors, and ceiling. electrical and mechanical under separate permit. | $90,000 |
| Sep 29, 2015 | Never finaled issued Oct 2015, no final | 150 Stockton St | Trainor Commercial Construction Inc. | interior remodel include walls, doors, and ceiling. electrical and mechanical under separate permit.Details
interior remodel include walls, doors, and ceiling. electrical and mechanical under separate permit. | $60,000 |
| Sep 24, 2015 | Completed final sign-off Nov 2015 | 150 Stockton St | Pribuss Engineering Inc | fire sprinkler t.i. relocate 67, add 13, total 80. t.i. pa#201501165969Details
fire sprinkler t.i. relocate 67, add 13, total 80. t.i. pa#201501165969 | $20,090 |
| Aug 10, 2015 | Never finaled issued Aug 2015, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 1st floor t.i.: includes finishes, fixtures and ceiling. sprinkler, mech, electrical under separate permit.Details
1st floor t.i.: includes finishes, fixtures and ceiling. sprinkler, mech, electrical under separate permit. | $70,000 |
| Jul 27, 2015 | Never finaled issued Sep 2015, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 3rd floor - interior improvement of 448 sq ft include: fixtures, floor covering, ceiling & lighting. electrical + mechancial under separate permit.Details
3rd floor - interior improvement of 448 sq ft include: fixtures, floor covering, ceiling & lighting. electrical + mechancial under separate permit. | $98,888 |
| Mar 30, 2015 | Completed final sign-off Apr 2015 | 150 Stockton St | Potter Fire Protection | relocate 6 fire sprinklersDetails
relocate 6 fire sprinklers | $3,200 |
| Feb 27, 2015 | Completed final sign-off Jul 2015 | 150 Stockton St | Trainor Commercial Construction Inc. | interior remodel includes walls and doors installations, minor ceiling remodel and finishes.Details
interior remodel includes walls and doors installations, minor ceiling remodel and finishes. | $131,886 |
| Jan 16, 2015 | Never finaled issued Jul 2015, no final | 150 Stockton St | Trainor Commercial Construction Inc. | basement level int. t.i. of "neiman marcus". work includes (n) partitions, fixtures, finishes, millwork, lighting & mechanical in approx 15,200 sq ft. fire protection & shelving under separate pemrits.Details
basement level int. t.i. of "neiman marcus". work includes (n) partitions, fixtures, finishes, millwork, lighting & mechanical in approx 15,200 sq ft. fire protection & shelving under separate pemrits. | $1,500,000 |
| Nov 5, 2013 | Completed final sign-off Dec 2013 | 150 Stockton St | Potter Fire Protection | 1st floor:relocate 6 fire sprinklers on the 1st floor. ref app#201308285485Details
1st floor:relocate 6 fire sprinklers on the 1st floor. ref app#201308285485 | $2,820 |
| Oct 22, 2013 | Never finaled issued Nov 2013, no final | 150 Stockton St | Trainor Commercial Construction Inc. | revision to 201308285485, reflected ceiling plan soffit detailsDetails
revision to 201308285485, reflected ceiling plan soffit details | |
| Sep 6, 2013 | Never finaled issued Sep 2013, no final | 150 Stockton St | Trainor Commercial Construction Inc. | interior remodel for mechanical & electrical permit. arch work under pa #2013.08.28.5485Details
interior remodel for mechanical & electrical permit. arch work under pa #2013.08.28.5485 | $18,631 |
| Aug 28, 2013 | Completed final sign-off Dec 2013 | 150 Stockton St | Trainor Commercial Construction Inc. | interior remodel at ground level, install partitions, 1 door, fixtures, finishes and minor ceiling remodel. mechanical & electrical under seperate permit.Details
interior remodel at ground level, install partitions, 1 door, fixtures, finishes and minor ceiling remodel. mechanical & electrical under seperate permit. | $32,086 |
| Jul 10, 2013 | Never finaled issued Jul 2013, no final | 150 Stockton St | Trainor Commercial Construction Inc. | revision to permit application #2013.02.07.9695 to title 24 electrical forms - additional lighting. ref t.i. #2013.02.07.9694Details
revision to permit application #2013.02.07.9695 to title 24 electrical forms - additional lighting. ref t.i. #2013.02.07.9694 | |
| Jul 3, 2013 | Completed final sign-off Aug 2013 | 150 Stockton St | Innovative Technologies | install 4 fire alarm system notification devices for a tenant improvement. ref ti. 2013.0207.9694Details
install 4 fire alarm system notification devices for a tenant improvement. ref ti. 2013.0207.9694 | $800 |
| Jun 27, 2013 | Completed final sign-off Aug 2013 | 150 Stockton St | Siemens Industry, Inc. | 1st & 2nd floors-addition of 10 speaker/strobes for the "sf prada" remodels on floors 1 and 2, all new devices connect onto the existing fire alarm system. ref. 201305237755Details
1st & 2nd floors-addition of 10 speaker/strobes for the "sf prada" remodels on floors 1 and 2, all new devices connect onto the existing fire alarm system. ref. 201305237755 | $5,000 |
| May 29, 2013 | Completed final sign-off Jun 2013 | 150 Stockton St | Potter Fire Protection | relocate (9) and plug (1) fire sprinklers, building permit #201302079694; basementDetails
relocate (9) and plug (1) fire sprinklers, building permit #201302079694; basement | $4,000 |
| May 23, 2013 | Completed final sign-off Aug 2013 | 150 Stockton St | Michilli Inc | ti for (e) prada boutique on 2nd floor of neiman marcus. work incl. (n) fixture, finishes, lighting. no change to mechanical.Details
ti for (e) prada boutique on 2nd floor of neiman marcus. work incl. (n) fixture, finishes, lighting. no change to mechanical. | $115,000 |
| May 23, 2013 | Completed final sign-off Aug 2013 | 150 Stockton St | Michilli Inc | ti for (e) prada boutique on 1st floor of neiman marcus. work incl. (n) fixtures, finishes, lighting. no change to mechanical.Details
ti for (e) prada boutique on 1st floor of neiman marcus. work incl. (n) fixtures, finishes, lighting. no change to mechanical. | $50,000 |
| Feb 7, 2013 | Never finaled issued May 2013, no final | 150 Stockton St | Trainor Commercial Construction Inc. | remodel of gucci boutique: 581 sq ft space, mech and electrical and plumbing work.Details
remodel of gucci boutique: 581 sq ft space, mech and electrical and plumbing work. | $35,000 |
| Feb 7, 2013 | Completed final sign-off Jul 2013 | 150 Stockton St | Trainor Commercial Construction Inc. | remodel of gucci boutique: new interior walls, doors, ceiling and floor covering. 581 sq ft space. mech and electrical under separate permit application.Details
remodel of gucci boutique: new interior walls, doors, ceiling and floor covering. 581 sq ft space. mech and electrical under separate permit application. | $105,000 |
| Sep 20, 2012 | Never finaled issued Sep 2012, no final | 150 Stockton St | Potter Fire Protection | relocate (2) fire sprinklers on the 1st. flr.Details
relocate (2) fire sprinklers on the 1st. flr. | $1,120 |
| Sep 4, 2012 | Never finaled issued Sep 2012, no final | 150 Stockton St | Trainor Commercial Construction Inc. | remodel of (e) vendor shop on the ground flr of neiman marcus to include new millwork, ceiling, lighting, electrical and modify (e) hvac distributionDetails
remodel of (e) vendor shop on the ground flr of neiman marcus to include new millwork, ceiling, lighting, electrical and modify (e) hvac distribution | $100,000 |
| Oct 5, 2011 | Completed final sign-off Nov 2011 | 150 Stockton St | Red Hawk Fire & Security Ca Llc | provide tenant improvement on the 3rd floor at neiman marcus. add new booster power supply. audio/visual notification - 4 speaker/strobes- appliances. re-tap existing 10 speaker/strobes from 1/2 watt to 2 watts. relocate and re-use existing (1) speaker/strobe.Details
provide tenant improvement on the 3rd floor at neiman marcus. add new booster power supply. audio/visual notification - 4 speaker/strobes- appliances. re-tap existing 10 speaker/strobes from 1/2 watt to 2 watts. relocate and re-use existing (1) speaker/strobe. | $10,000 |
| Sep 8, 2011 | Completed final sign-off Sep 2011 | 150 Stockton St | Potter Fire Protection | 2nd & 3rd floors-relocate 28-and plug 5-fire sprinklersDetails
2nd & 3rd floors-relocate 28-and plug 5-fire sprinklers | $15,900 |
| Jul 26, 2011 | Completed final sign-off Nov 2011 | 150 Stockton St | Trainor Commercial Construction Inc. | interior tenant improvements on 2nd & 3rd floorson (e) neiman marcus store. work includes new partitions, ceilings, millwork, lighting & mechanical. no exterior work. fire protection under seperate permitDetails
interior tenant improvements on 2nd & 3rd floorson (e) neiman marcus store. work includes new partitions, ceilings, millwork, lighting & mechanical. no exterior work. fire protection under seperate permit | $500,000 |
| Apr 4, 2011 | Never finaled issued Apr 2011, no final | 150 Stockton St | street space permitDetails
street space permit | ||
| Jan 14, 2011 | Completed final sign-off Jun 2012 | 150 Stockton St | Potter Fire Protection | relocate 14 and plug 4 fire sprinklersDetails
relocate 14 and plug 4 fire sprinklers | $4,200 |
| Dec 20, 2010 | Completed final sign-off May 2011 | 150 Stockton St | Trainor Commercial Construction Inc. | vendor shop interior remodel. partitions,floor covering,minor ceiling and furniture. mech, electrical under seperate permit.Details
vendor shop interior remodel. partitions,floor covering,minor ceiling and furniture. mech, electrical under seperate permit. | $103,550 |
| Nov 1, 2010 | Completed final sign-off Nov 2010 | 150 Stockton St | Potter Fire Protection | relocate (7) and plug (1) fire sprinklersDetails
relocate (7) and plug (1) fire sprinklers | $2,000 |
| Sep 28, 2010 | Completed final sign-off Nov 2010 | 150 Stockton St | Trainor Commercial Construction Inc. | vendor shop interior remodel. partitions, ceiling, furniture, and floor covering. mech and elec under sep permit. all work in basement, no exterior work.Details
vendor shop interior remodel. partitions, ceiling, furniture, and floor covering. mech and elec under sep permit. all work in basement, no exterior work. | $103,550 |
| Sep 22, 2010 | Expired or cancelled withdrawn Oct 2010 | 150 Stockton St | minor interior remodel incl installation partitions, ceiling, flooring, mechanical & electrical under separate permit application.Details
minor interior remodel incl installation partitions, ceiling, flooring, mechanical & electrical under separate permit application. | $103,550 | |
| Oct 22, 2009 | Completed final sign-off Nov 2009 | 150 Stockton St | Ayoob & Peery Plumbing Co Inc | revision to appl #200908064281, basement - relocate & remove fire sprinkler heads & lines per tenant improvements, 16 relocate, replace backflow preventer.Details
revision to appl #200908064281, basement - relocate & remove fire sprinkler heads & lines per tenant improvements, 16 relocate, replace backflow preventer. | $10,000 |
| Oct 8, 2009 | Completed final sign-off Mar 2010 | 150 Stockton St | Trainor Commercial Construction Inc. | niemann marcus. basement, lower level - minor interior demo of partitions in basement/ lower lvl incl. lighting fixtures and millwork. minor instl. of new int. partitions, lighting fixtures, partial suspended ceiling and flooring. no exterior work.Details
niemann marcus. basement, lower level - minor interior demo of partitions in basement/ lower lvl incl. lighting fixtures and millwork. minor instl. of new int. partitions, lighting fixtures, partial suspended ceiling and flooring. no exterior work. | $110,000 |
| Sep 24, 2009 | Completed final sign-off Aug 2010 | 150 Stockton St | Diversified Fire Products | fire alarm ti for new electrical rm in basement. 4 smoke detectors, 1 speaker/strobe, 1 control module, 2 exhaust fsds, 2 control relaysDetails
fire alarm ti for new electrical rm in basement. 4 smoke detectors, 1 speaker/strobe, 1 control module, 2 exhaust fsds, 2 control relays | $7,600 |
| Aug 6, 2009 | Completed final sign-off Nov 2009 | 150 Stockton St | Ayoob & Peery Plumbing Co Inc | reinstall sprinkler lines and heads. install new 8" backflow preventer. total heads: 9Details
reinstall sprinkler lines and heads. install new 8" backflow preventer. total heads: 9 | $9,500 |
| Jul 16, 2009 | Never finaled issued Jul 2009, no final | 150 Stockton St | street space permitDetails
street space permit | ||
| Jul 2, 2009 | Completed final sign-off Aug 2010 | 150 Stockton St | Swinerton Builders | vacate sub sidewalk basement along stockton st for new sf muni line and union square station. new 4 hr rated wall at basement along stockton stDetails
vacate sub sidewalk basement along stockton st for new sf muni line and union square station. new 4 hr rated wall at basement along stockton st | $75,000 |
| Apr 14, 2009 | Completed final sign-off Jun 2009 | 150 Stockton St | Potter Fire Protection | relocate 9 fire spinklers and plug 1 on the 1st floor onlyDetails
relocate 9 fire spinklers and plug 1 on the 1st floor only | $2,500 |
| Mar 4, 2009 | Completed final sign-off Jun 2009 | 150 Stockton St | Trainor Commercial Construction Inc. | 1st floor-demolition of walls, doors & partial ceiling. installation of interior partitions, new partial floor covering, partial suspended ceiling, lighting, minor mechanical & electrical sprinkler & fire alarm-under separate permit.Details
1st floor-demolition of walls, doors & partial ceiling. installation of interior partitions, new partial floor covering, partial suspended ceiling, lighting, minor mechanical & electrical sprinkler & fire alarm-under separate permit. | $200,000 |