Permit GraphShortlistSan Francisco building permits since 2000

Gerald S. Tierney

License
C21296
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Perkins+Will
Based in
San Francisco
On San Francisco permits
Jan 2016 to Oct 2023

15 permits since 2000 (architect on 15 permits): 8 completed, 6 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Nibbi Bros Assoc Inc. (6), Nibbi Bros Inc.
Architects
Eric Robinson
Engineers
Benjamin Noggle, Greg Wagner, Jacqueline K. Lingweiluk, Ray Keane, Steve Curry
Authorized agents
Patrick Buscovich

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 24, 2023Completed
final sign-off Nov 2023
420 Taylor StNibbi Bros Assoc Inc.relocate existing wall + floor mounted bike racks so as to comply with 1a bulletin no.9 only. no other work is proposed.
Details
Permit
202310249329
Permit issued
Oct 25, 2023
Final sign-off
Nov 20, 2023

relocate existing wall + floor mounted bike racks so as to comply with 1a bulletin no.9 only. no other work is proposed.

Open the permit page

Apr 20, 2022Never finaled
filed Apr 2022, never issued
2800 03rd Stbldg# 1 - to demolish a 1 story, type 5a, industrial building.
Details
Permit
202204202606

bldg# 1 - to demolish a 1 story, type 5a, industrial building.

Open the permit page

$154,079
Apr 20, 2022Never finaled
filed Apr 2022, never issued
2800 03rd Stbldg# 3 - to demolish a 2-story, type 5a, office building.
Details
Permit
202204202609

bldg# 3 - to demolish a 2-story, type 5a, office building.

Open the permit page

$154,079
Apr 20, 2022Never finaled
filed Apr 2022, never issued
2800 03rd Stbldg# 4 - to demolish a 1 story, type 5a, industrial building.
Details
Permit
202204202610

bldg# 4 - to demolish a 1 story, type 5a, industrial building.

Open the permit page

$154,079
Apr 20, 2022Never finaled
filed Apr 2022, never issued
2800 03rd Stbldg# 2 - to demolish a 1 story, type 5a, greenhouse building.
Details
Permit
202204202608

bldg# 2 - to demolish a 1 story, type 5a, greenhouse building.

Open the permit page

$154,079
Jul 16, 2021Never finaled
filed Jul 2021, never issued
2741 16th Stto erect 4 stories over 1 basement, type 1b, parking/mech & pdr/lab
Details
Permit
202107164548

to erect 4 stories over 1 basement, type 1b, parking/mech & pdr/lab

Open the permit page

$35,650,309
Sep 4, 2020Completed
final sign-off Nov 2021
420 Taylor StNibbi Bros Assoc Inc.revision to pa #2019-0116-0492: revise the extension of the (e) traction elevator serving the 1st through 4th floor to the newly converted basement level office space.
Details
Permit
202009043451
Permit issued
Feb 5, 2021
Final sign-off
Nov 19, 2021

revision to pa #2019-0116-0492: revise the extension of the (e) traction elevator serving the 1st through 4th floor to the newly converted basement level office space.

Open the permit page

$195,000
Dec 13, 2019Never finaled
filed Dec 2019, never issued
388 Avenue Of The Palmsmayor ed# 17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-b, 76 residential unit building. (r-2,a-3,s-2) parcel-c2.3
Details
Permit
201912139567

mayor ed# 17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-b, 76 residential unit building. (r-2,a-3,s-2) parcel-c2.3

Open the permit page

$70,550,000
Dec 13, 2019Completed
final sign-off Jun 2024
1 Avenue Of The PalmsNibbi Bros Assoc Inc.erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used building
Details
Permit
201912139581
Permit issued
Apr 13, 2021
Final sign-off
Jun 27, 2024

erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used building

Open the permit page

$60,000,000
Sep 18, 2019Completed
final sign-off Jan 2022
420 Taylor StNibbi Bros Assoc Inc.electrical & lighting work. ref pa #201901160492. maher na
Details
Permit
201909181941
Permit issued
Nov 19, 2019
Final sign-off
Jan 13, 2022

electrical & lighting work. ref pa #201901160492. maher na

Open the permit page

Sep 9, 2019Completed
final sign-off May 2021
420 Taylor StNibbi Bros Assoc Inc.rooftop mech equipment platform framing. screen calls with attachment (n) guardrail. ref pa 2019-0116-0492
Details
Permit
201909091053
Permit issued
Nov 19, 2019
Final sign-off
May 10, 2021

rooftop mech equipment platform framing. screen calls with attachment (n) guardrail. ref pa 2019-0116-0492

Open the permit page

$10,000
Jan 22, 2019Completed
final sign-off Nov 2021
420 Taylor StNibbi Bros Assoc Inc.interior concrete demo of slab on grade and interior drive ramp as well as a portion of upper level concrete deck. n/a for maher
Details
Permit
201901220849
Permit issued
Feb 27, 2019
Final sign-off
Nov 19, 2021

interior concrete demo of slab on grade and interior drive ramp as well as a portion of upper level concrete deck. n/a for maher

Open the permit page

$750,000
Jan 16, 2019Completed
final sign-off Jan 2022
420 Taylor StNibbi Bros Inc.remodel existing basement and ground fl levels; addition of new mezzanine into office with small retail component. raise ground floor slab and infill existing openings onto the street with windows & doors & provision of stairs. maher na
Details
Permit
201901160492
Permit issued
Jul 26, 2019
Final sign-off
Jan 14, 2022

remodel existing basement and ground fl levels; addition of new mezzanine into office with small retail component. raise ground floor slab and infill existing openings onto the street with windows & doors & provision of stairs. maher na

Open the permit page

$5,000,000
Dec 14, 2017Expired or cancelled
withdrawn Jan 2019
420 Taylor Stconversion of (e) ground floor & basement parking into office space with addition of partial mezzanine @ ground floor & addition of office space @ existing 4th floor roof deck
Details
Permit
201712146457

conversion of (e) ground floor & basement parking into office space with addition of partial mezzanine @ ground floor & addition of office space @ existing 4th floor roof deck

Open the permit page

$5,000,000
Jan 25, 2016Completed
final sign-off May 2018
445 Geary Stmechanical, electrical & plumbing reference pa 2015-0306-0768.
Details
Permit
201601257869
Permit issued
Aug 8, 2016
Final sign-off
May 9, 2018

mechanical, electrical & plumbing reference pa 2015-0306-0768.

Open the permit page

$50,000