Gerald S. Tierney
- Listed as
- architect
- Firm
- Perkins+Will
- Based in
- San Francisco
- On San Francisco permits
- Jan 2016 to Oct 2023
15 permits since 2000 (architect on 15 permits): 8 completed, 6 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 24, 2023 | Completed final sign-off Nov 2023 | 420 Taylor St | Nibbi Bros Assoc Inc. | relocate existing wall + floor mounted bike racks so as to comply with 1a bulletin no.9 only. no other work is proposed.Details
relocate existing wall + floor mounted bike racks so as to comply with 1a bulletin no.9 only. no other work is proposed. | |
| Apr 20, 2022 | Never finaled filed Apr 2022, never issued | 2800 03rd St | bldg# 1 - to demolish a 1 story, type 5a, industrial building.Details
bldg# 1 - to demolish a 1 story, type 5a, industrial building. | $154,079 | |
| Apr 20, 2022 | Never finaled filed Apr 2022, never issued | 2800 03rd St | bldg# 3 - to demolish a 2-story, type 5a, office building.Details
bldg# 3 - to demolish a 2-story, type 5a, office building. | $154,079 | |
| Apr 20, 2022 | Never finaled filed Apr 2022, never issued | 2800 03rd St | bldg# 4 - to demolish a 1 story, type 5a, industrial building.Details
bldg# 4 - to demolish a 1 story, type 5a, industrial building. | $154,079 | |
| Apr 20, 2022 | Never finaled filed Apr 2022, never issued | 2800 03rd St | bldg# 2 - to demolish a 1 story, type 5a, greenhouse building.Details
bldg# 2 - to demolish a 1 story, type 5a, greenhouse building. | $154,079 | |
| Jul 16, 2021 | Never finaled filed Jul 2021, never issued | 2741 16th St | to erect 4 stories over 1 basement, type 1b, parking/mech & pdr/labDetails
to erect 4 stories over 1 basement, type 1b, parking/mech & pdr/lab | $35,650,309 | |
| Sep 4, 2020 | Completed final sign-off Nov 2021 | 420 Taylor St | Nibbi Bros Assoc Inc. | revision to pa #2019-0116-0492: revise the extension of the (e) traction elevator serving the 1st through 4th floor to the newly converted basement level office space.Details
revision to pa #2019-0116-0492: revise the extension of the (e) traction elevator serving the 1st through 4th floor to the newly converted basement level office space. | $195,000 |
| Dec 13, 2019 | Never finaled filed Dec 2019, never issued | 388 Avenue Of The Palms | mayor ed# 17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-b, 76 residential unit building. (r-2,a-3,s-2) parcel-c2.3Details
mayor ed# 17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-b, 76 residential unit building. (r-2,a-3,s-2) parcel-c2.3 | $70,550,000 | |
| Dec 13, 2019 | Completed final sign-off Jun 2024 | 1 Avenue Of The Palms | Nibbi Bros Assoc Inc. | erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used buildingDetails
erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used building | $60,000,000 |
| Sep 18, 2019 | Completed final sign-off Jan 2022 | 420 Taylor St | Nibbi Bros Assoc Inc. | electrical & lighting work. ref pa #201901160492. maher naDetails
electrical & lighting work. ref pa #201901160492. maher na | |
| Sep 9, 2019 | Completed final sign-off May 2021 | 420 Taylor St | Nibbi Bros Assoc Inc. | rooftop mech equipment platform framing. screen calls with attachment (n) guardrail. ref pa 2019-0116-0492Details
rooftop mech equipment platform framing. screen calls with attachment (n) guardrail. ref pa 2019-0116-0492 | $10,000 |
| Jan 22, 2019 | Completed final sign-off Nov 2021 | 420 Taylor St | Nibbi Bros Assoc Inc. | interior concrete demo of slab on grade and interior drive ramp as well as a portion of upper level concrete deck. n/a for maherDetails
interior concrete demo of slab on grade and interior drive ramp as well as a portion of upper level concrete deck. n/a for maher | $750,000 |
| Jan 16, 2019 | Completed final sign-off Jan 2022 | 420 Taylor St | Nibbi Bros Inc. | remodel existing basement and ground fl levels; addition of new mezzanine into office with small retail component. raise ground floor slab and infill existing openings onto the street with windows & doors & provision of stairs. maher naDetails
remodel existing basement and ground fl levels; addition of new mezzanine into office with small retail component. raise ground floor slab and infill existing openings onto the street with windows & doors & provision of stairs. maher na | $5,000,000 |
| Dec 14, 2017 | Expired or cancelled withdrawn Jan 2019 | 420 Taylor St | conversion of (e) ground floor & basement parking into office space with addition of partial mezzanine @ ground floor & addition of office space @ existing 4th floor roof deckDetails
conversion of (e) ground floor & basement parking into office space with addition of partial mezzanine @ ground floor & addition of office space @ existing 4th floor roof deck | $5,000,000 | |
| Jan 25, 2016 | Completed final sign-off May 2018 | 445 Geary St | mechanical, electrical & plumbing reference pa 2015-0306-0768.Details
mechanical, electrical & plumbing reference pa 2015-0306-0768. | $50,000 |