Block 0313, lot 002
59 Grant Ave
- City’s use
- Commercial Retail
- Built
- 1929
- Stories
- 4
- Units
- 2
- Rooms
- 9 bathrooms
- Building
- 9,001 sq ft
- Lot
- 2,200 sq ft
- Zoning
- C3R
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
29 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 7, 2023 | Completed final sign-off Mar 2024 | 59 Grant Av | Peacock Construction | rev to pa# 202204081858; structural notes and special inspection form origin scope install a fullly concealed coiling roll down security gate covering retail street only.Details
rev to pa# 202204081858; structural notes and special inspection form origin scope install a fullly concealed coiling roll down security gate covering retail street only. | |
| Jun 3, 2022 | Completed final sign-off Aug 2022 | 59 Grant Av | Marquee Fire Protection Dba Pye Barker F | fire sprinkler t.i. modifications; 2nd floor (9 heads; nfpa 13). ref t.i. pa 202203049298. maher n/a.Details
fire sprinkler t.i. modifications; 2nd floor (9 heads; nfpa 13). ref t.i. pa 202203049298. maher n/a. | $3,000 |
| Apr 8, 2022 | Completed final sign-off Mar 2024 | 59 Grant Av | Peacock Construction | install a fully concealed coiling roll down security grile covering the retail storefront glass only. the entrance of building lobby serving all spaces including ground fl. retail in not coverd by security grille, work includes cutting and modifying the (e) cement plastor soff it the coiling rollDetails
install a fully concealed coiling roll down security grile covering the retail storefront glass only. the entrance of building lobby serving all spaces including ground fl. retail in not coverd by security grille, work includes cutting and modifying the (e) cement plastor soff it the coiling roll | $30,000 |
| Mar 4, 2022 | Completed final sign-off Oct 2022 | 59 Grant Av | Rodan Builders Inc | 2/f: t.i. of 950sf. tenant space is 1400sf. restroom upgrade for accessible sink, renovation of break area casewok and sink, minor electrical work for lights and receptacles.Details
2/f: t.i. of 950sf. tenant space is 1400sf. restroom upgrade for accessible sink, renovation of break area casewok and sink, minor electrical work for lights and receptacles. | $170,000 |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 59 Grant Av | street spaceDetails
street space | ||
| Jun 20, 2017 | Completed final sign-off Mar 2019 | 59 Grant Av | United California Glass And Door | minor repairs to front windows as needed, replace non-visible windows at rear light well; no replacement at visible windows. rear windows replace with energy efficient alum framed windowsDetails
minor repairs to front windows as needed, replace non-visible windows at rear light well; no replacement at visible windows. rear windows replace with energy efficient alum framed windows | $30,000 |
| Apr 18, 2017 | Expired or cancelled withdrawn Jun 2017 | 59 Grant Av | front windows - frames shall remain w/ minor repair, replace w/ (n) wood sash. rear windows replace w/ energy efficient aluminum framed window w/ operable components.Details
front windows - frames shall remain w/ minor repair, replace w/ (n) wood sash. rear windows replace w/ energy efficient aluminum framed window w/ operable components. | $76,000 | |
| Jun 16, 2016 | Never finaled issued Jun 2016, no final | 59 Grant Av | sttreet spaceDetails
sttreet space | ||
| May 11, 2016 | Never finaled issued May 2016, no final | 59 Grant Av | street spaceDetails
street space | ||
| Feb 12, 2016 | Completed final sign-off Jul 2016 | 59 Grant Av | Associated Builders | remove (e) deteriorated scuttle, install new bilco - jd 16625 scuttle for h20 loading.Details
remove (e) deteriorated scuttle, install new bilco - jd 16625 scuttle for h20 loading. | $28,750 |
| Mar 21, 2013 | Never finaled issued Mar 2013, no final | 59 Grant Av | Golden Gate Fire Protection Inc | relocate 5 pendent sprinkler heads on the 1st floor. add one pendent sprinkler. ref 201302250827Details
relocate 5 pendent sprinkler heads on the 1st floor. add one pendent sprinkler. ref 201302250827 | $3,090 |
| Feb 25, 2013 | Completed final sign-off Jun 2013 | 59 Grant Av | Peacock Construction Inc | finish upgrade work on ground floor, minor demolition, new flooring, paint, non bearing drywall partition replace lighting. elevator upgrade permit # 201210252859. restroom upgrade permit #200308010995Details
finish upgrade work on ground floor, minor demolition, new flooring, paint, non bearing drywall partition replace lighting. elevator upgrade permit # 201210252859. restroom upgrade permit #200308010995 | $20,800 |
| Dec 13, 2012 | Completed final sign-off Mar 2013 | 59 Grant Av | C B F Inc | all floors, install 1 control panel, install 7 smoke detector w/ base, install 1 heat detector, install 4 control relays.Details
all floors, install 1 control panel, install 7 smoke detector w/ base, install 1 heat detector, install 4 control relays. | $6,000 |
| Oct 25, 2012 | Expired or cancelled cancelled Jan 2026 | 59 Grant Av | elevator call hall button and other features upgrade application for hardship.Details
elevator call hall button and other features upgrade application for hardship. | $300,000 | |
| Oct 3, 2012 | Completed final sign-off Oct 2012 | 59 Grant Av | Pribuss Engineering Inc | fire spinrker t.i relocate 7 sprinklers.Details
fire spinrker t.i relocate 7 sprinklers. | $3,602 |
| Sep 24, 2012 | Never finaled issued Nov 2012, no final | 59 Grant Av | Peacock Construction Inc | barrier removal 2nd and 3rd fl restrooms. move door, sink, relocate accessories, per plan.Details
barrier removal 2nd and 3rd fl restrooms. move door, sink, relocate accessories, per plan. | $7,200 |
| Sep 13, 2012 | Never finaled issued Dec 2012, no final | 59 Grant Av | Fisher Development Inc | to erect non electric, wall, single faced, non illuminated, new sign.Details
to erect non electric, wall, single faced, non illuminated, new sign. | $1,000 |
| Sep 13, 2012 | Never finaled issued Dec 2012, no final | 59 Grant Av | Fisher Development Inc | 2 graphic logos on glazing.Details
2 graphic logos on glazing. | $1,000 |
| Sep 13, 2012 | Never finaled issued Dec 2012, no final | 59 Grant Av | Fisher Development Inc | to erect blade, non-electric, projecting, double-faced, non-illuminated, new sign.Details
to erect blade, non-electric, projecting, double-faced, non-illuminated, new sign. | $3,000 |
| Aug 30, 2012 | Completed final sign-off Jan 2013 | 59 Grant Av | Fisher Development Inc | new t.i to include (n) walls, flooring, lighting, finishes, new bathrooms, casework, mech, elect, etc. fire protection & signage under separate permit.Details
new t.i to include (n) walls, flooring, lighting, finishes, new bathrooms, casework, mech, elect, etc. fire protection & signage under separate permit. | $250,000 |
| May 31, 2012 | Never finaled issued May 2012, no final | 59 Grant Av | mta parking onlyDetails
mta parking only | ||
| May 31, 2012 | Completed final sign-off Jun 2012 | 59 Grant Av | Csrw Inc Dba Allied Construction Service | reroofingDetails
reroofing | $26,750 |
| Mar 30, 2012 | Completed final sign-off May 2013 | 59 Grant Av | Ward Alan Emery Construction Inc. | 4th floor-barrier removal-increase restroom size, re-layout fixtures & accessoriesDetails
4th floor-barrier removal-increase restroom size, re-layout fixtures & accessories | $5,800 |
| Aug 26, 2008 | Never finaled issued Aug 2008, no final | 59 Grant Av | street space permit only.Details
street space permit only. | ||
| Nov 21, 2003 | Completed final sign-off Aug 2004 | 59 Grant Av | R L H Fire Protection Inc | fire sprinkler tenant remodel of basement level restrms, relocate 4 sprinklersDetails
fire sprinkler tenant remodel of basement level restrms, relocate 4 sprinklers | $800 |
| Aug 1, 2003 | Completed final sign-off Aug 2004 | 59 Grant Av | Fine Line Group Inc | remodel restroom: new mechanical/elec/plumb/fix./finishes. modify (e)bldg. entrance door to officesDetails
remodel restroom: new mechanical/elec/plumb/fix./finishes. modify (e)bldg. entrance door to offices | $98,000 |
| Oct 29, 2002 | Never finaled issued Oct 2002, no final | 59 Grant Av | R L H Fire Protection Inc | fire sprinkler on ground fl, replace 11 heads, add 8 heads, relocate 1 head upgrade pipingDetails
fire sprinkler on ground fl, replace 11 heads, add 8 heads, relocate 1 head upgrade piping | $1,500 |
| Sep 27, 2002 | Completed final sign-off Nov 2002 | 59 Grant Av | t/i new lighting millwork flooring paint ground floor onlyDetails
t/i new lighting millwork flooring paint ground floor only | $50,000 | |
| Aug 15, 2002 | Completed final sign-off Oct 2002 | 59 Grant Av | Fine Line Group Inc | demo (e) walls +fixtures + floors interior only non structural on ground floorDetails
demo (e) walls +fixtures + floors interior only non structural on ground floor | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Fisher Development Inc (4), Fine Line Group Inc (2), Peacock Construction (2), Peacock Construction Inc (2), R L H Fire Protection Inc (2), Associated Builders, C B F Inc, Csrw Inc Dba Allied Construction Service, Golden Gate Fire Protection Inc, Marquee Fire Protection Dba Pye Barker F, Pribuss Engineering Inc, Rodan Builders Inc, United California Glass And Door, Ward Alan Emery Construction Inc.
- Architects
- Gary Dane Henderson (2), Christopher Scott Wasney, Stephen Lochte
- Engineers
- John Ou, Steven Curry
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.