Block 3979, lot 001
444 De Haro St
- City’s use
- Commercial Office
- Built
- 1927
- Stories
- 3
- Units
- 3
- Rooms
- 8 bathrooms
- Building
- 176,000 sq ft
- Lot
- 80,000 sq ft
- Zoning
- M1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
129 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 444 De Haro St | Gci, Inc | 2/f: mep submittal to support approved arch permit. new split systems, ductwork and grilles/registers. ref: 202610089194.Details
2/f: mep submittal to support approved arch permit. new split systems, ductwork and grilles/registers. ref: 202610089194. | $40,000 |
| Oct 8, 2026 | In progress issued Oct 2026 | 444 De Haro St | Gci, Inc | ste 210: consists of minor interior demolition of non-structural elements. new work includes new interior partitios, doors, finishes, ceilings. mep under a sepaarte permit.Details
ste 210: consists of minor interior demolition of non-structural elements. new work includes new interior partitios, doors, finishes, ceilings. mep under a sepaarte permit. | $850,380 |
| Sep 4, 2026 | In progress issued Sep 2026 | 444 De Haro St | Gci, Inc | 2/f: electrical only permit to support pa# 202606082742. new lighting & controls and new power & signal devices throughout the space.Details
2/f: electrical only permit to support pa# 202606082742. new lighting & controls and new power & signal devices throughout the space. | $10,000 |
| Sep 3, 2026 | In progress issued Sep 2026 | 444 De Haro St | Gci, Inc | soft demo per ab-017. select demo of non-structure partitions, dropped, ceilings, lighting, and associated power/data, existing equipment and finishesDetails
soft demo per ab-017. select demo of non-structure partitions, dropped, ceilings, lighting, and associated power/data, existing equipment and finishes | $45,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 444 De Haro St | Gci, Inc | 1/fl- minor demo and interior consturciton of non structural partitions, relcoated doors and new exit signs and restroom upgradesDetails
1/fl- minor demo and interior consturciton of non structural partitions, relcoated doors and new exit signs and restroom upgrades | $30,000 |
| Jun 8, 2026 | In progress issued Aug 2026 | 444 De Haro St | Gci, Inc | ground floor- install (n) 2 hour rated stair access from floor 2 to street level at (e)} loading dock. (n) structrual pad for (e) compactor. (n) lighting and finishes. upgrade (e) floor 2 restroom for accessibilityu compliance. mep under seperate permitDetails
ground floor- install (n) 2 hour rated stair access from floor 2 to street level at (e)} loading dock. (n) structrual pad for (e) compactor. (n) lighting and finishes. upgrade (e) floor 2 restroom for accessibilityu compliance. mep under seperate permit | $460,000 |
| May 26, 2026 | In progress issued Aug 2026 | 444 De Haro St | Skyline Construction | 1st installation of (3) pre manufactured accessible meeting pods. the pods shall be seismically anchored. electrical, fire alarm and fire sprinklers shall be designed and installed by contractors under deferred design-build scopeDetails
1st installation of (3) pre manufactured accessible meeting pods. the pods shall be seismically anchored. electrical, fire alarm and fire sprinklers shall be designed and installed by contractors under deferred design-build scope | $134,000 |
| Dec 24, 2025 | Completed final sign-off Jul 2026 | 444 De Haro St | Skyline Construction | 1/f - interior t.i. for latering kitchen and sf dah food service review.Details
1/f - interior t.i. for latering kitchen and sf dah food service review. | $235,000 |
| Feb 3, 2025 | Completed final sign-off May 2025 | 444 De Haro St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti: adding 5 strobes to (e) fire lite ms-9600ls fire alarm system. ref bpa 202408299768Details
fire alarm ti: adding 5 strobes to (e) fire lite ms-9600ls fire alarm system. ref bpa 202408299768 | $7,354 |
| Aug 29, 2024 | In progress issued Sep 2024 | 444 De Haro St | Skyline Construction | revision to pa#: 202405071536 with revised attachment details for booths on the 2nd flr as they can not be braced to the concrete floor because of radiant coilsDetails
revision to pa#: 202405071536 with revised attachment details for booths on the 2nd flr as they can not be braced to the concrete floor because of radiant coils | |
| Jul 31, 2024 | In progress issued Aug 2024 | 444 De Haro St | Rapid Fire Safety&Security Llc Dba Pafa | 1st floor: fire alarm record drawings. ref pa#202103116402Details
1st floor: fire alarm record drawings. ref pa#202103116402 | |
| Jul 31, 2024 | Completed final sign-off May 2025 | 444 De Haro St | Rapid Fire Safety&Security Llc Dba Pafa | 1st and 2nd floors: fire alarm t.i.: adding 20 strobes kto existing fire lite ms-9600ls. fire alarm system.Details
1st and 2nd floors: fire alarm t.i.: adding 20 strobes kto existing fire lite ms-9600ls. fire alarm system. | $12,548 |
| Jun 17, 2024 | Completed final sign-off Oct 2024 | 444 De Haro St | Golden Gate Fire Protection Inc | add (3) pendent sprinklers in phone booths on the 1st floor. add (12) pendent sprinklers in phone booths on the 2nd floor. ti ref# 202405071536Details
add (3) pendent sprinklers in phone booths on the 1st floor. add (12) pendent sprinklers in phone booths on the 2nd floor. ti ref# 202405071536 | $5,250 |
| May 15, 2024 | Completed final sign-off Aug 2024 | 444 De Haro St | Rapid Fire Safety&Security Llc Dba Pafa | 1/f and 2/f common area; fire alarm ti - adding 1 power supply, 1 smoke detector, 29 horn strobes, and 2 strobes to existing fire-lite ms9600ls fire alarm system.Details
1/f and 2/f common area; fire alarm ti - adding 1 power supply, 1 smoke detector, 29 horn strobes, and 2 strobes to existing fire-lite ms9600ls fire alarm system. | $9,820 |
| May 7, 2024 | In progress issued May 2024 | 444 De Haro St | Skyline Construction | installation and relocation of 12 phone booths and relocate 4.Details
installation and relocation of 12 phone booths and relocate 4. | $100,000 |
| Jun 7, 2021 | Completed final sign-off Apr 2023 | 444 De Haro St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. relocate 11 heads and add 1 for discord. 2nd floor.Details
fire sprinkler only. relocate 11 heads and add 1 for discord. 2nd floor. | $6,000 |
| Jun 1, 2021 | Never finaled filed Jun 2021, never issued | 444 De Haro St | Tashcon Corporation | install new emergency back up generator on unoccupied roofDetails
install new emergency back up generator on unoccupied roof | $15,000 |
| Apr 28, 2021 | Completed final sign-off Jun 2021 | 444 De Haro St | Pacific Auxiliary Fire Alarm | fire alarm ti: adding (13) horn-strobes, (9) strobes, (20) duct detectors, (2) smoke detectors and (1) relay module to existing firellite ms 9600 fire alarm system.Details
fire alarm ti: adding (13) horn-strobes, (9) strobes, (20) duct detectors, (2) smoke detectors and (1) relay module to existing firellite ms 9600 fire alarm system. | $28,796 |
| Apr 20, 2021 | Completed final sign-off Apr 2023 | 444 De Haro St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. relocate 2 heads into soffit in stairwell #133. add 1 head under the stairs (pendent), add 1 upright head under top landing to 2nd floor.Details
fire sprinkler only. relocate 2 heads into soffit in stairwell #133. add 1 head under the stairs (pendent), add 1 upright head under top landing to 2nd floor. | $2,000 |
| Mar 16, 2021 | Completed final sign-off Jan 2023 | 444 De Haro St | Gci, Inc | #200: electrical- new power and data for workstations and office. new power for break room equipment. new lighting and controls. ref app#202010227121Details
#200: electrical- new power and data for workstations and office. new power for break room equipment. new lighting and controls. ref app#202010227121 | |
| Mar 11, 2021 | Never finaled issued Apr 2021, no final | 444 De Haro St | Pacific Auxiliary Fire Alarm | fire alarm ti: adding (2) power supplies (40) horn-strobes, (34) strobes, (15) duct detectors, (2) smoke detectors and (1) relay module to existing fire-lite ms-9600 fire alarm system. 2020-0915-4218Details
fire alarm ti: adding (2) power supplies (40) horn-strobes, (34) strobes, (15) duct detectors, (2) smoke detectors and (1) relay module to existing fire-lite ms-9600 fire alarm system. 2020-0915-4218 | $29,514 |
| Feb 12, 2021 | Completed final sign-off Jan 2023 | 444 De Haro St | Gci, Inc | ste 200: mechanical. install new vrf system with fan coils & restroom exhaust. new mechanical in reception, mailroom & lounge. ref pa# 202010227121. structural deferred.Details
ste 200: mechanical. install new vrf system with fan coils & restroom exhaust. new mechanical in reception, mailroom & lounge. ref pa# 202010227121. structural deferred. | |
| Dec 21, 2020 | Completed final sign-off Apr 2023 | 444 De Haro St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only - ref # 2020-0915-4218. reflocate 45 pendents (conceal) for discord on the 1st floor.Details
fire sprinkler only - ref # 2020-0915-4218. reflocate 45 pendents (conceal) for discord on the 1st floor. | $22,500 |
| Dec 2, 2020 | Completed final sign-off Jan 2023 | 444 De Haro St | Gci, Inc | mechanical: install (n) duct & (n) fan coil units. (n) exhaust. electrical: power, lighting & signal.Details
mechanical: install (n) duct & (n) fan coil units. (n) exhaust. electrical: power, lighting & signal. | |
| Oct 22, 2020 | Completed final sign-off Nov 2021 | 444 De Haro St | Gci, Inc | suite 200: interior tenant improvement: reception conference rooms, break areas & storage rooms.Details
suite 200: interior tenant improvement: reception conference rooms, break areas & storage rooms. | $421,000 |
| Sep 26, 2020 | Completed final sign-off Jan 2021 | 444 De Haro St | Golden Gate Fire Protection Inc | 1/f: fire sprinkler only, demo plan, remove (34) pendentsDetails
1/f: fire sprinkler only, demo plan, remove (34) pendents | $20,000 |
| Sep 24, 2020 | Completed final sign-off Nov 2021 | 444 De Haro St | Gci, Inc | suite #100: new communicating stair. deferred submittal. ref. pa#2020-0915-4218 and #2020-1022-7121.Details
suite #100: new communicating stair. deferred submittal. ref. pa#2020-0915-4218 and #2020-1022-7121. | $190,000 |
| Sep 15, 2020 | Completed final sign-off Nov 2021 | 444 De Haro St | Gci, Inc | suite 100. interior t.i. open office conference rooms, break areas and storage room. mep deferred.Details
suite 100. interior t.i. open office conference rooms, break areas and storage room. mep deferred. | $1,200,000 |
| Jul 19, 2020 | Completed final sign-off Feb 2021 | 444 De Haro St | Gci, Inc | #100: demo only - non structural partitions & finishes.Details
#100: demo only - non structural partitions & finishes. | $125,000 |
| Feb 19, 2020 | Completed final sign-off Mar 2020 | 444 De Haro St | Gci, Inc | demolition in proparation for future ti on 2nd floor (suite 222 - "discord").Details
demolition in proparation for future ti on 2nd floor (suite 222 - "discord"). | $60,000 |
| Feb 6, 2020 | Never finaled issued Feb 2020, no final | 444 De Haro St | Pioneer Fire Inc. | fire sprinkler remove existing drops maher not reqDetails
fire sprinkler remove existing drops maher not req | $5,700 |
| Apr 4, 2019 | Never finaled issued Apr 2019, no final | 444 De Haro St | street space only | ||
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 444 De Haro St | Skyline Construction | 2nd floor floor ref 201901230966 mep for tiDetails
2nd floor floor ref 201901230966 mep for ti | $15,000 |
| Feb 28, 2019 | Completed final sign-off Mar 2019 | 444 De Haro St | Pacific Auxiliary Fire Alarm | fire alarm t.i. to (e) fire lite ms 9600- adding 18 horn -strobes n/a maherDetails
fire alarm t.i. to (e) fire lite ms 9600- adding 18 horn -strobes n/a maher | $7,936 |
| Feb 28, 2019 | Expired or cancelled cancelled Jan 2026 | 444 De Haro St | City Mechanical Inc | hvac ti - straighten duct work for more uniform look. replace register firills. install new duct work for exhaust and restroom area. service and clean (e) heat pump units for proper operations maher naDetails
hvac ti - straighten duct work for more uniform look. replace register firills. install new duct work for exhaust and restroom area. service and clean (e) heat pump units for proper operations maher na | $120,000 |
| Feb 7, 2019 | Completed final sign-off Feb 2019 | 444 De Haro St | Pioneer Fire Inc. | ref pa# 201901230966; relocate (13) pendents, remove (9) pendents. n/a maherDetails
ref pa# 201901230966; relocate (13) pendents, remove (9) pendents. n/a maher | $6,500 |
| Jan 23, 2019 | Never finaled issued Jan 2019, no final | 444 De Haro St | Novo Construction Inc | 2nd floor: t.i. to include new restrooms. mep, fire, & lifesafty under seperate permit. n/a for maherDetails
2nd floor: t.i. to include new restrooms. mep, fire, & lifesafty under seperate permit. n/a for maher | $45,000 |
| Jan 18, 2019 | Completed final sign-off Mar 2019 | 444 De Haro St | Pacific Auxiliary Fire Alarm | 2nd fl: produce as-built (record) dwg set per sffd and add (1) control relay module (owner/filed change)Details
2nd fl: produce as-built (record) dwg set per sffd and add (1) control relay module (owner/filed change) | |
| Dec 20, 2018 | Never finaled issued Dec 2018, no final | 444 De Haro St | Novo Construction Inc | interior demo of existing non rated partitions, ceilings and mezzanine ab-017Details
interior demo of existing non rated partitions, ceilings and mezzanine ab-017 | $8,000 |
| Dec 18, 2018 | Expired or cancelled cancelled Jan 2026 | 444 De Haro St | revision to 201810314649. voluntary addition of 1 accessible gender neutral restroom. new plumbing fixtures, lights, finishes. no exterior work. no visible from street. def submittals if req: ls, fs, fa, mepDetails
revision to 201810314649. voluntary addition of 1 accessible gender neutral restroom. new plumbing fixtures, lights, finishes. no exterior work. no visible from street. def submittals if req: ls, fs, fa, mep | ||
| Dec 10, 2018 | Completed final sign-off Feb 2019 | 444 De Haro St | Pioneer Fire Inc. | revision to pa# 201809119696, relocate 4 concealed pendents and add 6 concealed pendents ref 201807114281 - as builtDetails
revision to pa# 201809119696, relocate 4 concealed pendents and add 6 concealed pendents ref 201807114281 - as built | $18,315 |
| Nov 16, 2018 | Completed final sign-off Mar 2019 | 444 De Haro St | Pacific Auxiliary Fire Alarm | 2nd fl - fire alarm ti to existing, firelite ms-9600. adding 3 horn strobes and 4 strobes; ref pa#201810032078Details
2nd fl - fire alarm ti to existing, firelite ms-9600. adding 3 horn strobes and 4 strobes; ref pa#201810032078 | $5,300 |
| Nov 9, 2018 | Expired or cancelled cancelled Jan 2026 | 444 De Haro St | new card readers | ||
| Nov 7, 2018 | Completed final sign-off Dec 2018 | 444 De Haro St | Pacific Auxiliary Fire Alarm | fire alarm ti to existing firelite ms9600. adding 1 strobe power supplyu, 13 horn sstrobes, 16 strobes and 1 smoke detector to 2nd/mezzanine levelsDetails
fire alarm ti to existing firelite ms9600. adding 1 strobe power supplyu, 13 horn sstrobes, 16 strobes and 1 smoke detector to 2nd/mezzanine levels | $9,200 |
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 444 De Haro St | Gci, Inc | suite 200: revision to 201807114281. additon of 1 accessible gender neutral restroom and 1 single occupancy gender neutral restroom. new plumbing fixtures, lights, finishes. no ext work. no work visible from street. def submittals if req life safety fire sprinklers, fire alarm mep maher not reqDetails
suite 200: revision to 201807114281. additon of 1 accessible gender neutral restroom and 1 single occupancy gender neutral restroom. new plumbing fixtures, lights, finishes. no ext work. no work visible from street. def submittals if req life safety fire sprinklers, fire alarm mep maher not req | $5,000 |
| Oct 26, 2018 | Completed final sign-off Nov 2018 | 444 De Haro St | 2nd floor - suite 218 ti - upgrade of (e) fire sprinkler system 1 relocate pendent, 4 add pendent, 1 delete pendent. ref 201810032078 maher naDetails
2nd floor - suite 218 ti - upgrade of (e) fire sprinkler system 1 relocate pendent, 4 add pendent, 1 delete pendent. ref 201810032078 maher na | $1,400 | |
| Oct 22, 2018 | Never finaled issued Oct 2018, no final | 444 De Haro St | Gci, Inc | revised duct layout for new floor plan. new power and data, new lighting & controls. new break room. ref. pa #2018-1003-2078 maher n/aDetails
revised duct layout for new floor plan. new power and data, new lighting & controls. new break room. ref. pa #2018-1003-2078 maher n/a | $110,000 |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 444 De Haro St | Gci, Inc | revision to 201807114281 addition of framing details of interior partitions no ext work, no work visible from street. defered submittals if redq: fire/life safetyDetails
revision to 201807114281 addition of framing details of interior partitions no ext work, no work visible from street. defered submittals if redq: fire/life safety | |
| Oct 3, 2018 | Completed final sign-off Nov 2018 | 444 De Haro St | Gci, Inc | t.i. improvement- minor demo, new walls and doorsDetails
t.i. improvement- minor demo, new walls and doors | $200,000 |
| Sep 11, 2018 | Completed final sign-off Feb 2019 | 444 De Haro St | Pioneer Fire Inc. | suite 200 - relocate 6 concealed pendent gci 201807114281Details
suite 200 - relocate 6 concealed pendent gci 201807114281 | $18,135 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 444 De Haro St | Gci, Inc | mechanical and plumbing, cooling only vav box, fan coil unit w stat, demo duct, new sheetmetal ref 201807114281Details
mechanical and plumbing, cooling only vav box, fan coil unit w stat, demo duct, new sheetmetal ref 201807114281 | $125,000 |
| Aug 22, 2018 | Completed final sign-off Feb 2021 | 444 De Haro St | Gci, Inc | electrical new power, new lighting and controlsDetails
electrical new power, new lighting and controls | $200,000 |
| Jul 11, 2018 | Completed final sign-off Mar 2019 | 444 De Haro St | Gci, Inc | #200: commercial ti in existing 2nd floor suite of (e) office bldg. demo work include demo of non-structural interior partitions, plumbing fixtures and lights. new non-structural partitions, plumbing fixtures & lighting to be installed. no exterior work, no work visible from stDetails
#200: commercial ti in existing 2nd floor suite of (e) office bldg. demo work include demo of non-structural interior partitions, plumbing fixtures and lights. new non-structural partitions, plumbing fixtures & lighting to be installed. no exterior work, no work visible from st | $500,000 |
| Oct 6, 2017 | Completed final sign-off Aug 2018 | 444 De Haro St | Emcor Services/Mesa Energy Systems Inc | new garage exhaust fans, new co monitoring control system. maher naDetails
new garage exhaust fans, new co monitoring control system. maher na | $89,421 |
| Oct 6, 2017 | Completed final sign-off Aug 2018 | 444 De Haro St | Emcor Services/Mesa Energy Systems Inc | replace boiler & circulating pump with (2) new high efficiency condensing boilers. maher naDetails
replace boiler & circulating pump with (2) new high efficiency condensing boilers. maher na | $201,437 |
| Mar 8, 2017 | Completed final sign-off Sep 2017 | 444 De Haro St | Pyro-Comm Systems, Inc. | fire alarm ti 2nd fl add 1 nac power supply, 1 smoke det, 1 module 17 horn strobes and 9 strobes connect to e fire alarm systemDetails
fire alarm ti 2nd fl add 1 nac power supply, 1 smoke det, 1 module 17 horn strobes and 9 strobes connect to e fire alarm system | $15,000 |
| Mar 8, 2017 | Completed final sign-off Jun 2017 | 444 De Haro St | Pyro-Comm Systems, Inc. | fire alarm annunciator additoin at security deskDetails
fire alarm annunciator additoin at security desk | $7,500 |
| Jun 9, 2016 | Never finaled issued Aug 2016, no final | 444 De Haro St | City Mechanical Inc | provide & install (1) a/c system with condensate line in the 2nd floor server room. maher naDetails
provide & install (1) a/c system with condensate line in the 2nd floor server room. maher na | $4,000 |
| May 12, 2016 | Completed final sign-off Jul 2016 | 444 De Haro St | Pacific Auxiliary Fire Alarm | 1st floor: fire alarm - add 1 relay to (e) system. ref pa 2016 0307 1405 maher naDetails
1st floor: fire alarm - add 1 relay to (e) system. ref pa 2016 0307 1405 maher na | $600 |
| Mar 14, 2016 | Never finaled issued Mar 2016, no final | 444 De Haro St | street space | ||
| Mar 7, 2016 | Completed final sign-off Jun 2016 | 444 De Haro St | Legacy Mechanical & Energy Services, Inc | provide & install (2) ceiling fans at lobby. maher naDetails
provide & install (2) ceiling fans at lobby. maher na | $8,000 |
| Nov 23, 2015 | Expired or cancelled cancelled May 2019 | 444 De Haro St | site plan: increase mezzanine area to form new 2/f, add windows to match existing. lower g/f elevation 12"Details
site plan: increase mezzanine area to form new 2/f, add windows to match existing. lower g/f elevation 12" | $1,000,000 | |
| Aug 17, 2015 | Expired or cancelled cancelled Jan 2026 | 444 De Haro St | remove existing window, replace with wood siding to match existing; maher n/aDetails
remove existing window, replace with wood siding to match existing; maher n/a | $1,500 | |
| Aug 13, 2015 | Completed final sign-off Oct 2016 | 444 De Haro St | Legacy Mechanical & Energy Services, Inc | provide and install one 27 ton cooling tower with pump, two 2.5 ton heat pump, one 2 ton heat pump and cooling tower associated accessory. n/a for maher.Details
provide and install one 27 ton cooling tower with pump, two 2.5 ton heat pump, one 2 ton heat pump and cooling tower associated accessory. n/a for maher. | $120,000 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 444 De Haro St | Devcon Construction | revision to approved pa 201503029724, scope is to revise duct smoke detector (dsd)to smoke detector (sd) and add fire alarm matrix per fir inspector's request,no new work, maher n/aDetails
revision to approved pa 201503029724, scope is to revise duct smoke detector (dsd)to smoke detector (sd) and add fire alarm matrix per fir inspector's request,no new work, maher n/a | |
| Jul 14, 2015 | Completed final sign-off Jul 2015 | 444 De Haro St | Pacific Auxiliary Fire Alarm | fire alarm- add 2 power supplies, 1 module, 3 relays, 3 duct detectors, 38 horn/strobes, 16 strobes as part of tenant improvement. ref 201406269566, 201503029724. n/a maher ord. 155-13Details
fire alarm- add 2 power supplies, 1 module, 3 relays, 3 duct detectors, 38 horn/strobes, 16 strobes as part of tenant improvement. ref 201406269566, 201503029724. n/a maher ord. 155-13 | $38,000 |
| Apr 22, 2015 | Completed final sign-off Jul 2015 | 444 De Haro St | Golden Bear Fire Protect. | revision to app#201503262013. add notes per fire department.Details
revision to app#201503262013. add notes per fire department. | |
| Mar 26, 2015 | Completed final sign-off Jul 2015 | 444 De Haro St | Golden Bear Fire Protect. | 2nd floor & 2nd fl mezz: install 106 new t.i. sprinkler on mezz; change fire sprinkler heads only equal 236(no piping) for 2nd fl. n/a for maher. ref. ti 2014-0626-9566.Details
2nd floor & 2nd fl mezz: install 106 new t.i. sprinkler on mezz; change fire sprinkler heads only equal 236(no piping) for 2nd fl. n/a for maher. ref. ti 2014-0626-9566. | $29,000 |
| Mar 23, 2015 | Never finaled issued Mar 2015, no final | 444 De Haro St | street space permit | ||
| Mar 12, 2015 | Completed final sign-off Jun 2015 | 444 De Haro St | Central Coating Company | reroofingDetails
reroofing | $341,000 |
| Mar 2, 2015 | Completed final sign-off Oct 2015 | 444 De Haro St | Devcon Construction | revisions to approved pa# 2014 0626 9566 as noted on plans. work includes new 2nd floor entry area. new demising wall to create subteway space, av room reconfiguration. maher - not req'dDetails
revisions to approved pa# 2014 0626 9566 as noted on plans. work includes new 2nd floor entry area. new demising wall to create subteway space, av room reconfiguration. maher - not req'd | |
| Dec 10, 2014 | Never finaled issued Dec 2014, no final | 444 De Haro St | Principal Builders Inc. | installation and anchorage of storage racks and shelving on 1/f, t.i. pa# 201407292395. n/a ordinance #155-13.Details
installation and anchorage of storage racks and shelving on 1/f, t.i. pa# 201407292395. n/a ordinance #155-13. | $12,000 |
| Nov 26, 2014 | Never finaled issued Nov 2014, no final | 444 De Haro St | street space | ||
| Nov 3, 2014 | Never finaled issued Feb 2015, no final | 444 De Haro St | Principal Builders Inc. | 1st floor - slab peneratation & strengthening at existing slab refer to pa #2014.0729.2395. n/a maher ordinanceDetails
1st floor - slab peneratation & strengthening at existing slab refer to pa #2014.0729.2395. n/a maher ordinance | $44,000 |
| Oct 28, 2014 | Completed final sign-off Jan 2015 | 444 De Haro St | Principal Builders Inc. | rev. to pa# 201409116107 to show mechanical work on roof to replace louvers and air intake grille. n/a ordinance #133-12Details
rev. to pa# 201409116107 to show mechanical work on roof to replace louvers and air intake grille. n/a ordinance #133-12 | $20,000 |
| Oct 15, 2014 | Completed final sign-off Jan 2015 | 444 De Haro St | Pyro-Comm Systems, Inc. | new fire alarm devices for t.i. to extg bldg to include: 1) power supply, 31 relay modules, (31) duct detectors, (40) horn/strobes, (15) strobes. ref app# 201407292395. n/a maher ordinance # 155-13Details
new fire alarm devices for t.i. to extg bldg to include: 1) power supply, 31 relay modules, (31) duct detectors, (40) horn/strobes, (15) strobes. ref app# 201407292395. n/a maher ordinance # 155-13 | $43,000 |
| Oct 3, 2014 | Completed final sign-off May 2015 | 444 De Haro St | Premier Structures Inc | revision to mechanical plans 201406259465 to include new exhaust on roof on fsd in elec room. n/a maher ordinance 155-13Details
revision to mechanical plans 201406259465 to include new exhaust on roof on fsd in elec room. n/a maher ordinance 155-13 | |
| Oct 2, 2014 | Never finaled issued Oct 2014, no final | 444 De Haro St | Principal Builders Inc. | to extend loading dock(not visible from street), creat opening and reinforce shearwall and reinforce partitions. refer tp pa#2014-0729-2395 for ti workDetails
to extend loading dock(not visible from street), creat opening and reinforce shearwall and reinforce partitions. refer tp pa#2014-0729-2395 for ti work | $50,000 |
| Oct 1, 2014 | Completed final sign-off Jan 2015 | 444 De Haro St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - t.i. on 1st floor: add 125 sprinklers. also, change out 180 sprinklers that were painted over. reference pa201409116107Details
existing fire sprinkler system - t.i. on 1st floor: add 125 sprinklers. also, change out 180 sprinklers that were painted over. reference pa201409116107 | $62,500 |
| Sep 17, 2014 | Completed final sign-off May 2015 | 444 De Haro St | H C I Systems Inc | add new horn and strobes to existing fire alarm system i the new solar city ti space. 4 new duct detectors will be added at the new dampers and hp1. a new bps will be added for the new h/s. ti #201407292395. compliance with maher ordinance no. 155-13 not required.Details
add new horn and strobes to existing fire alarm system i the new solar city ti space. 4 new duct detectors will be added at the new dampers and hp1. a new bps will be added for the new h/s. ti #201407292395. compliance with maher ordinance no. 155-13 not required. | $11,700 |
| Sep 16, 2014 | Never finaled issued Sep 2014, no final | 444 De Haro St | Skyline Construction | permit revision to 201310078695; to remove 2nd flr mezzanine construction and restroom construction from original permit.; maher n/aDetails
permit revision to 201310078695; to remove 2nd flr mezzanine construction and restroom construction from original permit.; maher n/a | |
| Sep 11, 2014 | Never finaled issued Sep 2014, no final | 444 De Haro St | Principal Builders Inc. | mechanical and electrical work for tenant improvement 201407292395. install new equipment including exhaust/return, fan coil units. fire smoke dampers, associated plumbing work. exterior louver and roof work on a separate permitDetails
mechanical and electrical work for tenant improvement 201407292395. install new equipment including exhaust/return, fan coil units. fire smoke dampers, associated plumbing work. exterior louver and roof work on a separate permit | $850,000 |
| Sep 8, 2014 | Completed final sign-off Dec 2014 | 444 De Haro St | Premier Structures Inc | infill of existing openings in slab located on ground floor. revision to pa#201405145691. n/a ordinance #155-13Details
infill of existing openings in slab located on ground floor. revision to pa#201405145691. n/a ordinance #155-13 | $10,000 |
| Aug 19, 2014 | Completed final sign-off Dec 2014 | 444 De Haro St | Premier Structures Inc | infill of existing concrete wall per plan. revision appl. 2014.0514.5691.Details
infill of existing concrete wall per plan. revision appl. 2014.0514.5691. | $10,000 |
| Jul 29, 2014 | Completed final sign-off Jan 2015 | 444 De Haro St | Principal Builders Inc. | 1st floor: t.i. to construct new non-load bearing partitions, doors, millwork finishes, electrical/plumbing. fire sprinklers, fire alarm and structural details under seperate permit. n/a for the maher ordinance #155-13Details
1st floor: t.i. to construct new non-load bearing partitions, doors, millwork finishes, electrical/plumbing. fire sprinklers, fire alarm and structural details under seperate permit. n/a for the maher ordinance #155-13 | $2,500,000 |
| Jul 29, 2014 | Completed final sign-off Jan 2015 | 444 De Haro St | Principal Builders Inc. | 1st floor: t.i. demolition of extg subflooring and partitions space to remain vacant per ab017. n/a for the maher ordinance #155-13Details
1st floor: t.i. demolition of extg subflooring and partitions space to remain vacant per ab017. n/a for the maher ordinance #155-13 | $50,000 |
| Jul 18, 2014 | Completed final sign-off Sep 2014 | 444 De Haro St | O'connor Plumbing & Fire Protection | add 42 new heads, relocate 2 plug off 8 extg heads per nfpa 13. n/a for the maher ordinance #155-13 ref app#201405145691Details
add 42 new heads, relocate 2 plug off 8 extg heads per nfpa 13. n/a for the maher ordinance #155-13 ref app#201405145691 | |
| Jun 26, 2014 | Completed final sign-off Oct 2015 | 444 De Haro St | Devcon Construction | 2nd fl - tenant improvements to (e) office suite on 2nd fl. construction of (n) mezzanine w/ stairs & ramp. open offices & support spaces. (n) lighting & electrical power/data. (n) mechanical systems incl radiant fl. (n) plumbing for added restrms & showers. n/a for maher ordinance.Details
2nd fl - tenant improvements to (e) office suite on 2nd fl. construction of (n) mezzanine w/ stairs & ramp. open offices & support spaces. (n) lighting & electrical power/data. (n) mechanical systems incl radiant fl. (n) plumbing for added restrms & showers. n/a for maher ordinance. | $3,384,842 |
| Jun 25, 2014 | Completed final sign-off May 2015 | 444 De Haro St | Premier Structures Inc | g/f only- no work on 2/f -interior t.i. including minor demolition, new walls, and doors. sprinkler and fire alarm under seperate permit. n/a for the maher ordinance #155-13Details
g/f only- no work on 2/f -interior t.i. including minor demolition, new walls, and doors. sprinkler and fire alarm under seperate permit. n/a for the maher ordinance #155-13 | $1,400,000 |
| Jun 18, 2014 | Never finaled issued Jun 2014, no final | 444 De Haro St | Acco Engineered Systems Inc. Dba Acco En | relocate existing supply air fan, furnace and ductwork at 1st and 2nd floor; relocate osa duct serving 1st flr to existing shaft at roof; maher n/aDetails
relocate existing supply air fan, furnace and ductwork at 1st and 2nd floor; relocate osa duct serving 1st flr to existing shaft at roof; maher n/a | $8,000 |
| May 14, 2014 | Completed final sign-off May 2015 | 444 De Haro St | Premier Structures Inc | new a.d.a. ramp addition, no future hvac, electrical of fire alarm required, sprinkler system under seperate permit. n/a ordinance #155-13.Details
new a.d.a. ramp addition, no future hvac, electrical of fire alarm required, sprinkler system under seperate permit. n/a ordinance #155-13. | $80,000 |
| Mar 26, 2014 | Never finaled issued Mar 2014, no final | 444 De Haro St | street space | ||
| Dec 19, 2013 | Never finaled issued Dec 2013, no final | 444 De Haro St | Premier Structures Inc | (compli. w/maher ord - extended ord. #155-13 not required. excavation less than 50 cu. yd) - change of use of 90,500 sq ft to office use per planning commision motion #18653. mechanical/arch. under separate permit.no work under this permitDetails
(compli. w/maher ord - extended ord. #155-13 not required. excavation less than 50 cu. yd) - change of use of 90,500 sq ft to office use per planning commision motion #18653. mechanical/arch. under separate permit.no work under this permit | |
| Oct 7, 2013 | Never finaled issued Oct 2013, no final | 444 De Haro St | Skyline Construction | construction of a mezzanine on 2nd floor on southside of bldng. to (e) walls per plan.Details
construction of a mezzanine on 2nd floor on southside of bldng. to (e) walls per plan. | $180,000 |
| Sep 5, 2013 | Completed final sign-off Dec 2014 | 444 De Haro St | Premier Structures Inc | replace existing ground floor property line windows along sidewalk with steel sash to match existing on 2/f.Details
replace existing ground floor property line windows along sidewalk with steel sash to match existing on 2/f. | $610,000 |
| Jun 3, 2013 | Completed final sign-off Jul 2013 | 444 De Haro St | Centric Construction Inc | suite #208 revision to appl #2013.01.16.8069 - remove sink & dishwash @ break area.Details
suite #208 revision to appl #2013.01.16.8069 - remove sink & dishwash @ break area. | |
| May 22, 2013 | Completed final sign-off Jun 2013 | 444 De Haro St | Golden Gate Fire Protection Inc | 1st and 2nd floor:relocate 8 pendent sprinkler heads on the 1st floor. relocate 7 upright heads on the 1st floor. relocate 4 pnedent heads on the 2nd floor. t.i. app#201302119907Details
1st and 2nd floor:relocate 8 pendent sprinkler heads on the 1st floor. relocate 7 upright heads on the 1st floor. relocate 4 pnedent heads on the 2nd floor. t.i. app#201302119907 | $9,780 |
| Apr 25, 2013 | Completed final sign-off Jul 2013 | 444 De Haro St | Centric Construction Inc | ste. 208: amend two notes of approved ti project appl.# 201301168069. change server room to utitlity closet and kitchen to break room on sheet a1.01.Details
ste. 208: amend two notes of approved ti project appl.# 201301168069. change server room to utitlity closet and kitchen to break room on sheet a1.01. | |
| Apr 12, 2013 | Completed final sign-off Jul 2013 | 444 De Haro St | American Mechanical Inc | suite #208-reuse (e) hvac units, install 2 new units & 3 new exhaust fans. ref t.i. #2013.01.16.8069Details
suite #208-reuse (e) hvac units, install 2 new units & 3 new exhaust fans. ref t.i. #2013.01.16.8069 | $120,000 |
| Apr 10, 2013 | Never finaled issued Apr 2013, no final | 444 De Haro St | Incom Mechanical Inc | install (30) new fire sprinkler heads on 2nd floor to existing sprinkler system.Details
install (30) new fire sprinkler heads on 2nd floor to existing sprinkler system. | $15,000 |
| Feb 11, 2013 | Never finaled issued Mar 2013, no final | 444 De Haro St | Skyline Construction | new entrance doors, new awning & removal of side doorsDetails
new entrance doors, new awning & removal of side doors | $165,000 |
| Feb 8, 2013 | Completed final sign-off Aug 2014 | 444 De Haro St | Skyline Construction | interior renovation of restrooms, common corridor and lobby finishes. fire alarm, elec, plumbing under separate permitDetails
interior renovation of restrooms, common corridor and lobby finishes. fire alarm, elec, plumbing under separate permit | $375,000 |
| Feb 1, 2013 | Never finaled issued Feb 2013, no final | 444 De Haro St | Johnson Controls Security Solutions Llc | currently 2 communicators on site for 1 address., one communicator per riser. this project to consolidate 2 commicators to 1. sprinkler supervision only. central station monitoringDetails
currently 2 communicators on site for 1 address., one communicator per riser. this project to consolidate 2 commicators to 1. sprinkler supervision only. central station monitoring | $5,000 |
| Jan 16, 2013 | Completed final sign-off Jul 2013 | 444 De Haro St | Skyline Construction | suite # 208:t.i. commercial for a new office and video production. suite is on 2nd floor with mezzanine. no scope of work to bldg envelope. mech, elect, and sprinklers under seperate applications.Details
suite # 208:t.i. commercial for a new office and video production. suite is on 2nd floor with mezzanine. no scope of work to bldg envelope. mech, elect, and sprinklers under seperate applications. | $700,000 |
| Jan 9, 2013 | Completed final sign-off Apr 2013 | 444 De Haro St | Cornerstone Environmental | all floors install (7) sub slab vent sumps. install 4" alum. tubing to each vent point, manifold tubing to (2) roof penetrating. install fans on each roof vent point working on all floors.Details
all floors install (7) sub slab vent sumps. install 4" alum. tubing to each vent point, manifold tubing to (2) roof penetrating. install fans on each roof vent point working on all floors. | $21,000 |
| Nov 30, 2012 | Completed final sign-off Mar 2014 | 444 De Haro St | Peacock Construction Inc | 1st and 2nd floor:revision to app#201207245596. minor demo of extg non structural partitions, ramps milwork, associated electrical, plumbing and cieling.Details
1st and 2nd floor:revision to app#201207245596. minor demo of extg non structural partitions, ramps milwork, associated electrical, plumbing and cieling. | $30,000 |
| Oct 2, 2012 | Never finaled issued Oct 2012, no final | 444 De Haro St | street space & sidewalk permit. | ||
| Jul 24, 2012 | Completed final sign-off Mar 2014 | 444 De Haro St | Peacock Construction Inc | suites #104/110/201 & 211-minor demo of non-structural partitions, ramps, millwork & associated electrical, plumbing & ceiling work. demo only per ab-017.Details
suites #104/110/201 & 211-minor demo of non-structural partitions, ramps, millwork & associated electrical, plumbing & ceiling work. demo only per ab-017. | $15,000 |
| Jan 25, 2010 | Completed final sign-off Mar 2010 | 444 De Haro St | Howard S. Wright Constructors Lp | interior ti on 2nd floor suite 203. new wall, new ceiling and relocating existing light fixturesDetails
interior ti on 2nd floor suite 203. new wall, new ceiling and relocating existing light fixtures | $15,000 |
| Jan 14, 2010 | Completed final sign-off Jan 2010 | 444 De Haro St | Great American Glass Co | project consists of extension of (e) duct work & relocating diffuses & redistribute air. arch pa# 2008-1028-5266Details
project consists of extension of (e) duct work & relocating diffuses & redistribute air. arch pa# 2008-1028-5266 | $3,000 |
| Dec 18, 2009 | Completed final sign-off Feb 2010 | 444 De Haro St | Great American Glass Co | office ti on 2nd fl, suite 222. work to include demo of existing partitions, doors, power and tre/data. receptacles and and finishes, construction of new partitions, doors, power and tel/data receptacles, ciling and finishes. mep under separate permitDetails
office ti on 2nd fl, suite 222. work to include demo of existing partitions, doors, power and tre/data. receptacles and and finishes, construction of new partitions, doors, power and tel/data receptacles, ciling and finishes. mep under separate permit | $55,000 |
| Jan 6, 2009 | Completed final sign-off Jan 2009 | 444 De Haro St | revision to pa# 2008-1028-5266-revised drawings to include height of workstation panels-delta 1Details
revision to pa# 2008-1028-5266-revised drawings to include height of workstation panels-delta 1 | ||
| Oct 28, 2008 | Completed final sign-off Jan 2009 | 444 De Haro St | t.i. to (e) vacant space on 2nd floor. no increase in area, work includes minor demo and construction, new ceiling ht. partitions. no modification to (e) mech, elect. life safety, sprinkler or structural system. new ceiling lit partitions.Details
t.i. to (e) vacant space on 2nd floor. no increase in area, work includes minor demo and construction, new ceiling ht. partitions. no modification to (e) mech, elect. life safety, sprinkler or structural system. new ceiling lit partitions. | $38,000 | |
| Feb 13, 2008 | Never finaled issued Feb 2008, no final | 444 De Haro St | revision to pa# 2008.0108.2073. demo existing in suite toilet room on 2nd floor. other building elements in full compliance for da.Details
revision to pa# 2008.0108.2073. demo existing in suite toilet room on 2nd floor. other building elements in full compliance for da. | ||
| Jan 8, 2008 | Completed final sign-off Mar 2008 | 444 De Haro St | minor demo and construction of new offices/breakroom.Details
minor demo and construction of new offices/breakroom. | $80,000 | |
| Dec 29, 2006 | Completed final sign-off Feb 2007 | 444 De Haro St | Waterproofing Associates | reroofingDetails
reroofing | $50,000 |
| Nov 30, 2006 | Completed final sign-off Jan 2007 | 444 De Haro St | interior non structural remodel of extg 1st floor office new display kchn ,bath not plumbing for new condo development salesDetails
interior non structural remodel of extg 1st floor office new display kchn ,bath not plumbing for new condo development sales | $88,750 | |
| Sep 22, 2006 | Never finaled issued Sep 2006, no final | 444 De Haro St | Legacy Mechanical & Energy Services, Inc | add 2 supply air grilles with ductwork and add three return air grilles. no structural or penetrationsDetails
add 2 supply air grilles with ductwork and add three return air grilles. no structural or penetrations | $570 |
| Jun 15, 2006 | Completed final sign-off Dec 2006 | 444 De Haro St | add two air outletsd & remove existing one grille in ceilingDetails
add two air outletsd & remove existing one grille in ceiling | $1,000 | |
| May 11, 2006 | Completed final sign-off Dec 2006 | 444 De Haro St | Superior Automatic Sprinkler | add 2 ssp, 1 ssu to existing system.Details
add 2 ssp, 1 ssu to existing system. | $750 |
| Apr 28, 2006 | Completed final sign-off Jun 2006 | 444 De Haro St | Van Der Sterre Construction | replace (e) walking surface with trex pallats use pt sleepers - to comp0ly w/ nov. #200668658 (work at 444 de haro st. #208)Details
replace (e) walking surface with trex pallats use pt sleepers - to comp0ly w/ nov. #200668658 (work at 444 de haro st. #208) | $2,000 |
| Apr 12, 2006 | Completed final sign-off Dec 2006 | 444 De Haro St | Fernandez & Durr Construction, Inc. | oti 1 2nd floor-el,spDetails
oti 1 2nd floor-el,sp | $45,000 |
| Nov 1, 2002 | Never finaled issued Nov 2002, no final | 444 De Haro St | Amwest Mechanical Inc | fire sprinklers relocation on groundfloorDetails
fire sprinklers relocation on groundfloor | $400 |
| Oct 16, 2002 | Expired or cancelled expired Mar 2004 | 444 De Haro St | oti-1 spr. | $60,000 | |
| Aug 23, 2002 | Completed final sign-off Nov 2002 | 444 De Haro St | Z M General Contractor | t/i of office space add 2 sprinkler heads sprinkler plans only under this permit for 2/f & 2/f mezzDetails
t/i of office space add 2 sprinkler heads sprinkler plans only under this permit for 2/f & 2/f mezz | $300 |
| Jul 30, 2002 | Completed final sign-off Nov 2002 | 444 De Haro St | tenant improvement of (e) office space, no structure workDetails
tenant improvement of (e) office space, no structure work | $42,000 | |
| Jul 7, 2000 | Completed final sign-off Sep 2000 | 444 De Haro St | Dpr Construction Inc | demo interior partitions.construct new partitions, raised comp floor,lighting, finishes&claddings...Details
demo interior partitions.construct new partitions, raised comp floor,lighting, finishes&claddings... | $17,000 |
| Jun 13, 2000 | Completed final sign-off Aug 2000 | 444 De Haro St | Waterproofing Associates | reroofingDetails
reroofing | $97,257 |
| Feb 1, 2000 | Expired or cancelled expired Sep 2000 | 444 De Haro St | D A Pope Inc | renewal of application 9913272 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gci, Inc (21), Skyline Construction (10), Pacific Auxiliary Fire Alarm (8), Premier Structures Inc (7), Principal Builders Inc. (7), Anderson, Rowe & Buckley, Inc. (4), Pioneer Fire Inc. (4), Rapid Fire Safety&Security Llc Dba Pafa (4), Devcon Construction (3), Golden Gate Fire Protection Inc (3), Legacy Mechanical & Energy Services, Inc (3), Pyro-Comm Systems, Inc. (3), Centric Construction Inc (2), City Mechanical Inc (2), Emcor Services/Mesa Energy Systems Inc (2), Golden Bear Fire Protect. (2), Great American Glass Co (2), Novo Construction Inc (2), Peacock Construction Inc (2), Waterproofing Associates (2), Acco Engineered Systems Inc. Dba Acco En, American Mechanical Inc, Amwest Mechanical Inc, Central Coating Company, Cornerstone Environmental, D A Pope Inc, Dpr Construction Inc, Fernandez & Durr Construction, Inc., H C I Systems Inc, Howard S. Wright Constructors Lp, Incom Mechanical Inc, Johnson Controls Security Solutions Llc, O'connor Plumbing & Fire Protection, Superior Automatic Sprinkler, Tashcon Corporation, Van Der Sterre Construction, Z M General Contractor
- Architects
- Scott E Clement (4), Charles Blank (3), Douglas Booth (3), M Melissa Duffy (2), Virginie Manichon (2), Bartley Mcclelland, Cliff Leonard Peterson, James Zack, Jerome Douglas Tobias, Leighton Lee, Marc Penninger, Martha Breed, Matthew Molloy Combrink
- Engineers
- Dorel Anghel (2), Jahandar Yadegar (2), Stephen Shaffer (2), Steven Curry (2), Carlo Biscocho, Craig Ristow, Danilo Pineda, Eugene Tuan, Jahandar Yadegar, Kambiz Moradkhani, Kyle S Blocker, Lefler Engineering, Marc Pfenninger, Meng Chen, Mozart Faizi, Sherry Chaumpluke, Xuong Quach
- Authorized agents
- John Toby (2), Charles Chapman, Henry Kwong
- Designers
- Pafa
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.