Cornerstone Environmental
- Based in
- Concord
- On San Francisco permits
- Oct 2001 to Nov 2016
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2016 | Completed final sign-off Dec 2017 | 2 Richardson Av | decommissioning of an environmental remediation system. involves removal of a concrete slab on grade compound, chain link fencing, holding tank, remediation equipment, and remediation piping onsite and offsite.Details
decommissioning of an environmental remediation system. involves removal of a concrete slab on grade compound, chain link fencing, holding tank, remediation equipment, and remediation piping onsite and offsite. | $125,000 |
| Jan 9, 2013 | Completed final sign-off Apr 2013 | 444 De Haro St | all floors install (7) sub slab vent sumps. install 4" alum. tubing to each vent point, manifold tubing to (2) roof penetrating. install fans on each roof vent point working on all floors.Details
all floors install (7) sub slab vent sumps. install 4" alum. tubing to each vent point, manifold tubing to (2) roof penetrating. install fans on each roof vent point working on all floors. | $21,000 |
| Aug 28, 2012 | Never finaled issued Sep 2013, no final | 2 Richardson Av | installation of underground piping under broderick street for soil remediation use, piping to connect to existing remediation piping and recovery unit located on site.Details
installation of underground piping under broderick street for soil remediation use, piping to connect to existing remediation piping and recovery unit located on site. | $61,185 |
| Aug 10, 2012 | Completed final sign-off Mar 2013 | 1175 Fell St | fence removal and disposal, equipment remocal and disposal, compond enclosure and bollard removval and disposal, backfill and resurfacing. 6" high curb.Details
fence removal and disposal, equipment remocal and disposal, compond enclosure and bollard removval and disposal, backfill and resurfacing. 6" high curb. | $25,000 |
| Jul 5, 2012 | Completed final sign-off Dec 2012 | 401 Treat Av | excavation of 1,290 cy of contaminated soil to be off hauled & disposed includes installation of temporary gate for truck exit onto harrison street. removal of approx 6,000 sq ft of ashphalt to allow soil excavation, area will be backfilled, compacted & resurfaced with 3" ac.Details
excavation of 1,290 cy of contaminated soil to be off hauled & disposed includes installation of temporary gate for truck exit onto harrison street. removal of approx 6,000 sq ft of ashphalt to allow soil excavation, area will be backfilled, compacted & resurfaced with 3" ac. | $170,000 |
| Dec 21, 2004 | Completed final sign-off Nov 2006 | 1200 Geneva Av | upgrade extg soil vapor extration system and add a ground water treatment system/relocate trash enclosureDetails
upgrade extg soil vapor extration system and add a ground water treatment system/relocate trash enclosure | $70,800 |
| Oct 18, 2001 | Completed final sign-off Nov 2002 | 1200 Geneva Av | revision to 9911290- replace exist process piping & supply electrical service & circuits to oxidizerDetails
revision to 9911290- replace exist process piping & supply electrical service & circuits to oxidizer | $60,000 |