Block 0934, lot 019
2 Richardson Ave
- City’s use
- Commercial Misc
- Built
- 1970
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,644 sq ft
- Lot
- 7,305 sq ft
- Zoning
- NC3
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 22, 2016 | Completed final sign-off Dec 2017 | 2 Richardson Av | Cornerstone Environmental | decommissioning of an environmental remediation system. involves removal of a concrete slab on grade compound, chain link fencing, holding tank, remediation equipment, and remediation piping onsite and offsite.Details
decommissioning of an environmental remediation system. involves removal of a concrete slab on grade compound, chain link fencing, holding tank, remediation equipment, and remediation piping onsite and offsite. | $125,000 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 2 Richardson Av | Pak's Roofing Inc | re-roofingDetails
re-roofing | $4,000 |
| Aug 28, 2012 | Never finaled issued Sep 2013, no final | 2 Richardson Av | Cornerstone Environmental | installation of underground piping under broderick street for soil remediation use, piping to connect to existing remediation piping and recovery unit located on site.Details
installation of underground piping under broderick street for soil remediation use, piping to connect to existing remediation piping and recovery unit located on site. | $61,185 |
| May 26, 2011 | Never finaled issued Jun 2011, no final | 2 Richardson Av | Stantec Consulting Corp Dba Stantec | revision to app#201001225166. replace previous oxidizer stack with emission stack capable of noise abatement.Details
revision to app#201001225166. replace previous oxidizer stack with emission stack capable of noise abatement. | $5,000 |
| Apr 20, 2010 | Never finaled issued Sep 2010, no final | 2 Richardson Av | Innovative Const Solutions | revision to pa# 2010.01.22.5166. change to bollard location, and removal of 1 hr firewall requirements on sound enclosure due to inctease of fire-seperation distance.Details
revision to pa# 2010.01.22.5166. change to bollard location, and removal of 1 hr firewall requirements on sound enclosure due to inctease of fire-seperation distance. | |
| Apr 14, 2010 | Expired or cancelled cancelled Nov 2022 | 2 Richardson Av | Innovative Const Solutions | off site trenching connecting exsiting remediation piping to 5 off site wells. trenches will take place on broderick ave and adjacent sidewalk ( major encroachement app# 09me-0005). soil vapor and ground water will be extracted from wells and processed for abatement on site at 2 richardson ave.Details
off site trenching connecting exsiting remediation piping to 5 off site wells. trenches will take place on broderick ave and adjacent sidewalk ( major encroachement app# 09me-0005). soil vapor and ground water will be extracted from wells and processed for abatement on site at 2 richardson ave. | $33,700 |
| Jan 22, 2010 | Never finaled issued Apr 2010, no final | 2 Richardson Av | Innovative Const Solutions | revision to pa# 2009/02/26/2947 - equipment location change to be relocated to different area outside.Details
revision to pa# 2009/02/26/2947 - equipment location change to be relocated to different area outside. | |
| Dec 10, 2009 | Never finaled issued Dec 2009, no final | 2 Richardson Av | Innovative Const Solutions | revision to pa# 2009.02.26.2947. expansion of concrete footing for treatment equipment support into a concrete slabDetails
revision to pa# 2009.02.26.2947. expansion of concrete footing for treatment equipment support into a concrete slab | $8,000 |
| Feb 26, 2009 | Never finaled issued Nov 2009, no final | 2 Richardson Av | 9 groundwater and soil vapor extraction wells are to be installed both on and off site. below grade conducts are to be connected to each well. these will be routed to a sound enclosure containing abatement equipmt, a fence will be installed to house +equipment all off site wrk under seperate permtDetails
9 groundwater and soil vapor extraction wells are to be installed both on and off site. below grade conducts are to be connected to each well. these will be routed to a sound enclosure containing abatement equipmt, a fence will be installed to house +equipment all off site wrk under seperate permt | $200,000 | |
| Nov 3, 2008 | Never finaled issued Nov 2008, no final | 2 Richardson Av | street space permit only.Details
street space permit only. | ||
| Nov 6, 2007 | Never finaled issued Nov 2007, no final | 2 Richardson Av | present use of location: automotive repair business. canopy and structure to be torn down once were portion of a gasonine service station.Details
present use of location: automotive repair business. canopy and structure to be torn down once were portion of a gasonine service station. | $4,500 |