Block 0295, lot 007

384 Post St

122 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 31, 2023Never finaled
filed Aug 2023, never issued
384 Post Strevision to permit 202306301252 store in store alteration to (e) tenant space. new product displays fixtures and finishes. area of work 206 sf. electrical scope to include telecom, av and security.
Jun 30, 2023Completed
final sign-off Oct 2023
384 Post StMarini Construction Incstore in store alteration to (e) commercial tenant space. install new product display fixtures and finsihes, area of work 206 sf elec scope to include telecomm and security$75,000
Jan 11, 2022Completed
final sign-off Mar 2022
384 Post StPotter Fire Protectionrelocate 4 fire sprinklers into new ceiling construction. ref pa# 202107285281.$2,100
Dec 10, 2021Completed
final sign-off Feb 2022
384 Post StPotter Fire Protectionrelocate (10) & demo (1) fire sprinkler. ref pa #202109309570$5,500
Oct 8, 2021Never finaled
issued Nov 2021, no final
384 Post StMarini Construction Incupgrade lower level men's ada tiolet stall to code compliance.conform 3/f water fountain meets code complancy. repositiong lower restroom signge. confirm all elements first floor ada entrance.$75,000
Sep 30, 2021Never finaled
issued Nov 2021, no final
384 Post StMarini Construction Inctenant improvement of a retail space area inside extg saks 5th avenue store. work to inlcude arch, mech, and electrical.t.i. on pad on 2nd floor:new fitout, new floor & finishes, sale floor fixtures. new store front signage.$150,000
Jul 28, 2021Never finaled
issued Nov 2021, no final
384 Post StMauel Francisco Bran Co Inc1/f: new interior finisehs & detailing, new display fixtures, new peremiter millwork, no exterior or plumbing work; work is within the saks fifth ave. maher n/a.$53,628
Mar 9, 2021Completed
final sign-off Nov 2021
384 Post StHurst & Siebert Incinterior t.i. for (e) demised space in a covered mall. includes floor/ wall/ ceiling finishes, product display fixtures, light fixtures, electrical, structural fixture attachment & signage. no change in occupancy. no demo. no fire alarm/sprinkler changes.$50,000
Sep 9, 2019Never finaled
issued Nov 2019, no final
384 Post StFreeman Construction Companycommercial t.i. consisting of demo extg area, non structural partitions, casework, fixtures, interior signage and electrical fixtures. tenant sak's fifth ave on post street. n/a for maher.$175,000
Mar 28, 2018Completed
final sign-off Apr 2018
384 Post StAfs Sprinkler Increlocate (4) existing sprinkler heads$2,500
Jan 9, 2018Completed
final sign-off Apr 2018
384 Post StUpscale Construction Inc.ground floor: new interior millwork and finishes at (e) ground level retail shop with saks fifth avenue in ~350 sq ft space; n/a maher. sprinkler and alarms under separate permit(s).$50,000
Aug 10, 2016Never finaled
issued Sep 2016, no final
384 Post StJohnson Controls Security Solutions Llc4th flr: connect to custome owned duct smoke detector, install monitor module and control module to control duct smoke detecotr ref pa 201603021035$2,500
Jun 30, 2016Never finaled
issued Jul 2016, no final
384 Post StJohnson Controls Security Solutions Llctyco to remove 6 smoke detectors and 6 horn/strobes from executive offices. executive offices will be remodeled to storage room. tyco to reinstall 2 horn/strobes in storage area. ref app#201603243038. n/a for maher$23,000
Jun 17, 2016Completed
final sign-off Jul 2016
384 Post StPotter Fire Protectionrelocate 12 fire sprinklers$6,000
Jun 17, 2016Completed
final sign-off Jul 2016
384 Post StPotter Fire Protectionrelocate 2 fier sprinklers around hvac equipment red 201603021035$1,500
Mar 31, 2016Completed
final sign-off Apr 2016
384 Post StPotter Fire Protectionrelocate 4 pendant fire sprinklers. ref 201512185492$2,400
Mar 24, 2016Never finaled
issued May 2016, no final
384 Post StMarini Construction Incconvert (e) offices to stock roomemove drywall, partitions, acoustical ceiling and carpet. add new strip light, shelving unit mep. maher na$85,000
Mar 14, 2016Completed
final sign-off Apr 2016
384 Post StJohnson Controls Security Solutions Llcsaks 5th ave is remodeling cartier dept in 1st floor. horn/strobe that is installed on wall will be removed and new ceiling mount horn/strobe will be installed. maher na$7,200
Mar 2, 2016Never finaled
issued May 2016, no final
384 Post StMarini Construction Incinstall new hood and duct, new openings in slab to install vertical duct, install new boiler. n/a for maher ordinance no.155-13.$93,000
Jan 15, 2016Completed
final sign-off May 2016
384 Post StMarini Construction Incti for cartier boutique space 206 sq ft gr fl saks 5th ave. work includes (n) fixtures, finishes, lighting, fire protection under seperate permit.$100,000
Dec 18, 2015Never finaled
issued Mar 2016, no final
384 Post StShawmut Woodworking & Supply Incshop.in. shop fragrance store within extg retail building, work includes architectural finishes, new lighting, relocate hvac diffuser, cabinets, and fixtures. fire sprinklers under separate permit. relocate extg fire sprinklers. n/a for maher.$40,000
Oct 15, 2015Completed
final sign-off May 2016
384 Post StJohnson Controls Security Solutions Llc2nd floor: ti- saks fifth - remodeling a portion of the space to add 2 smoke detectors and 2 horn/strobes to be compliant ref pa 201507242412$8,500
Oct 8, 2015Completed
final sign-off Oct 2015
384 Post StPribuss Engineering Inc1st & 2nd fl: fire sprinkler relocate 27, add 2. ref pa 2015-0803-3166. maher na$5,000
Sep 30, 2015Completed
final sign-off Jul 2016
384 Post StMarini Construction Incnew interior fixtures and finishes on 2nd floor$75,000
Aug 3, 2015Completed
final sign-off Jan 2016
384 Post StTrainor Commercial Construction Inc., Marini Construction Incinterior renovation of an extg retail shop within saks fifth ave. n/a for maher.$130,000
Jul 24, 2015Completed
final sign-off Jul 2016
384 Post StMarini Construction Inctenant improvement for valentino vendor shop, includes new interior partitions, fixtures & interior finishes; maher n/a$35,000
Jul 24, 2015Completed
final sign-off Jan 2016
384 Post StMarini Construction Incinterior ti to 3rd flr, includes new partitions, fixtures, light fixtures, and interior finishes, some electrical work; maher n/a$75,000
Jul 24, 2015Completed
final sign-off Jul 2016
384 Post StMarini Construction Incinterior t.i. on 2nd flr, includes new partitions, fixtures, light fixtures & interior finishes. some mep work.; maher n/a$100,000
Jun 26, 2015Expired or cancelled
cancelled Jul 2015
384 Post StPribuss Engineering Incfire sprinkler t.i., relocate 4. t.i. pa# 201504284807. n/a ordinance #155-13$2,058
May 14, 2015Completed
final sign-off Jun 2015
384 Post StDaryl Lassen Construction Incinterior renovation of an extg retail shop within sak's fifth ave on the 2nd floor. n/a for the maher.$80,000
Apr 28, 2015Completed
final sign-off Jul 2016
384 Post StMarini Construction Incsoft demo interior, mechanical and elect ti. maher na. fire sprinkler relocation under separate permit; n/a maher ord. # 155-13$48,960
Oct 6, 2014Completed
final sign-off Nov 2014
384 Post StMarini Construction Incinterior of remodel of existing space including fixtures, flooring, interior wall and structural mounting blocking. maher n/a.$121,000
Nov 12, 2013Completed
final sign-off Feb 2014
384 Post StAlain Hirsch Construction Corpt.i. for givenchy boutique space (approx 200 sq ft) on ground floor of saks 5th ave. work includes (n) flooring, fixtures, millwork, finishes. no change to mep, fire protection under separate permit.$250,000
Oct 30, 2013Completed
final sign-off Nov 2013
384 Post StJohnson Controls Security Solutions Llcfire alarm revision to app#201310078699. 2nd fllor: relocated (2) ceiling mount strobes from original wall mount strobes.
Oct 9, 2013Completed
final sign-off Nov 2013
384 Post StAll Valley Fire Protection **See Notes*raise 11 fire sprinkler heads on 2nd floor. ref pa #2013.0820.4772$2,400
Oct 7, 2013Completed
final sign-off Nov 2013
384 Post StJohnson Controls Security Solutions Llcremoving 1 mfa, one smoke detector, one horn/strobe and one strobe while store remodels area. after area is completed reinstalling 1 mfa, one smoke detector, 1 horn/strobe & 1 strobe to it's original spot/area. add 2 additional strobes due to new area having 2 addtional rooms. ref app#201308204772$3,750
Aug 20, 2013Completed
final sign-off Nov 2013
384 Post StAlain Hirsch Construction Corp2nd floor:interior remodel of extg space. including , mechanical, electrical and structural.$77,171
Jul 26, 2013Completed
final sign-off Sep 2013
384 Post StDejager Construction Inc.remodel of apporx. 207 st ft of retail space on ground floor. work includes new millwork and electrical$110,000
Jun 24, 2013Never finaled
issued Jun 2013, no final
384 Post St2nd floor-interior barricade for temporary construction of (e) boutique in saks. work is related to pa# 2012-0430-9365 (ti)$5,000
Jun 12, 2013Completed
final sign-off Sep 2013
384 Post StMichilli Increvision to pa# 2012-0430-9365-interior alteration revisions to cabinets, lighting, fixtures, millwork & finishes
Jan 28, 2013Completed
final sign-off Jun 2013
384 Post StAmerican Chiller Service Inc.replace existing cooling tower installed in 1980 with new "like for like" cooling tower$120,000
Nov 29, 2012Completed
final sign-off Dec 2012
384 Post StPotter Fire Protection3rd floor - relcoate (2) fire sprinklers.$1,120
Nov 7, 2012Never finaled
issued Nov 2012, no final
384 Post StTrainor Commercial Construction Inc.minor t.i. includes demolition of walls and construction of new walls and doors, finishes, furniture, and floor and minor modification of ceiling fixtures, ceiling gyp bd to remain. (extg) electrical and mech under seperate permit.$89,650
Oct 29, 2012Expired or cancelled
cancelled Jan 2026
384 Post Stinterior ti of existing vendor shop on 3rd fl of saks 5th ave. remove existing partitons, new finishes, lighting, power, display fixtures$150,000
Oct 29, 2012Never finaled
filed Oct 2012, never issued
384 Post Stinterior tenant improvement of existing vendor shop o the 3rd floor of saks 5th ave. remove existing partitions, new finishes. new lighting, power, display fixtures
Oct 29, 2012Completed
final sign-off Nov 2012
384 Post StM C Construction Management Corp.interior tenant improvement of existing vendor shop on the 3rd floor of saks 5th ave. remove existing partition, new finishes, new lighting, new power, new display fixtures.$150,000
Sep 11, 2012Never finaled
issued Sep 2012, no final
384 Post StTrainor Commercial Construction Inc.minor interior remodel off fur retail area. new walls and doors and finishes. ceiling and lighting remain existing. no mechanical. electrical under separate permit$59,000
May 30, 2012Completed
final sign-off Jun 2012
384 Post StPotter Fire Protection1st floor:relocate 1 fire sprinklers to accomodate new ceiling construction.$1,120
May 2, 2012Never finaled
issued May 2012, no final
384 Post StHurst & Siebert Inc, Tyco Integrated Security3rd floor:adding 2 strobes to extg fire system$4,900
Apr 30, 2012Completed
final sign-off Sep 2013
384 Post StMichilli Inc1st floor:interior only renovation of a vendor shop inside of saks 5th ave. included is only architectural and electrical.$60,000
Apr 16, 2012Completed
final sign-off May 2012
384 Post StSimplexgrinnell Lp.3rd floor-add & relocate 5 each fire sprinklers to accomodate new ceiling tenant plan. all new sprinklers to be quick response$2,400
Apr 10, 2012Completed
final sign-off May 2012
384 Post StHurst & Siebert Incinterior renovation of(e) 1078 sf open space on 3rd floor of stand-alone dept store. work include new non-load bearing partitons, mnor hvac and minor eletrical work.$59,994
Apr 6, 2012Completed
final sign-off May 2012
384 Post StHurst & Siebert Incdemo existing wall and ceilings/temp walls. ab-017$150,000
Apr 5, 2012Never finaled
issued May 2012, no final
384 Post StTrainor Commercial Construction Inc.minor remodel of boutique cosmetics including ada upgrade in boutique$89,650
Sep 20, 2011Never finaled
issued Sep 2011, no final
384 Post StAnderson, Rowe & Buckley, Inc.t.i.: extg fire sprinkler system. 4 added sprinklers,2 removed sprinkler,9 relocated sprinklers on 2nd floor$6,500
Jul 28, 2011Completed
final sign-off Nov 2011
384 Post StPlant Construction Company Lp1st floor-t.i. for gucci handbags boutique in saks 5th ave store. work includes new fixtures, finishes, millwork, lighting, ceiling. no other work. fire protection under seperate permit$30,500
Jul 28, 2011Completed
final sign-off Nov 2011
384 Post StPlant Construction Company Lp2nd floor-t.i. for gucci handbags boutique in saks 5th ave store. work includes new partitions, millwork, fixtures, finishes, ceiling, lighting. no exterior work. fire protection under seperate permit. work in ladies ready to wear section.$80,000
Apr 4, 2011Completed
final sign-off Feb 2012
384 Post StSimplex Grinnelladd 6 each sprinklers under existing mech duct due to blockage of spray pattern all sprinkelrs quick response$1,700
Jun 29, 2010Completed
final sign-off Sep 2010
384 Post StTrainor Commercial Construction Inc.saks fifth avenue. interior non-structural tenant improvement of existing retail store to include architectural and minor electrical work on the 1st floor within pad area only. sprinkler affected will be under separate permit.$40,000
Mar 3, 2010Completed
final sign-off Mar 2010
384 Post StTyco Integrated Security1st floor-due to the partial remodeling of prada store on 1st. flr. horn/strobe device & one wall mount horn/strobe device will be replace with new ceiling mount devices on the same circuit.$1,500
Jan 19, 2010Completed
final sign-off Mar 2010
384 Post StR L H Fire Protection Inct/i upgrade onan (e) fire sprinkler system for prada; 1st. floor of sax-fifth ave. relocate 7-heads. ref. appl. #2009/1215/3243.$1,600
Dec 15, 2009Completed
final sign-off Mar 2010
384 Post StWestwood Contractors, Inc.ground floor -demolition of existing sales & light fixtures, installation of new sales fixtures, light fixtures & a soffit. modification of hvac & electrical distribution.$85,000
Jul 15, 2009Never finaled
issued Jul 2009, no final
384 Post StSimplex Grinnellscope of work is to add 1-each and relocate 7 each fire sprinklers to accomodate new ceiling plan per architect.$1,774
Jul 1, 2009Completed
final sign-off Sep 2009
384 Post Stinterior remodel of existing retail tenant with non rated partitions, new finishes and fixtures. all work on 1st floor.$55,000
May 19, 2009Never finaled
issued May 2009, no final
384 Post StJames Agresta Carpentryinterior tenant improvement of existing retail space, arch, demo, mech & elect.$45,000
Nov 3, 2008Never finaled
issued Nov 2008, no final
384 Post StPotter Fire Protection3rd floor fire sprinkler -relocate 6 and 1 plug only$2,000
Sep 19, 2008Completed
final sign-off Jan 2009
384 Post Stminor interior t.i: relocate non-structural partitions, new ceiling and flooring. replace (e) light fixtures with fewer watts, (title 24 calcs not required)$85,000
Jul 8, 2008Never finaled
issued Jul 2008, no final
384 Post Ststreet space
Apr 21, 2008Never finaled
issued Apr 2008, no final
384 Post StTyco Integrated Securitydue to partial remodeling of bsmnt, 12 (e) horn/strobes will be rmvd/repl w/12 new ceiling mount horn/strobes. 4 additional ceiling horn/strobes, 4 ceiling strobe will be added. 1 (e) wall mount horn/strobe will be relocated. old annunciator will be repl with new led. new devices will connect to (e)$15,680
Apr 8, 2008Completed
final sign-off Apr 2008
384 Post StAquamatic Fire Protectionrenew 200708099219 for final inspection.
Feb 20, 2008Never finaled
issued Apr 2008, no final
384 Post Stinterior remodel of lower level, women shoes, new finishes, lighting, now structural walls.$95,000
Feb 20, 2008Completed
final sign-off Apr 2008
384 Post StTyco Integrated Security2nd & 3rd floor: due to partial remodeling, 4 existing wall mount horn/strobes will be removed & replace w/4 new ceiling mount hown/strobes, one additional ceiling mount & one wall mount horn/strobes will be added. monitor per nfpa 72 control system monitoring.$5,660
Jan 30, 2008Expired or cancelled
cancelled Jan 2026
384 Post Stdue to partial remodelinmg of 2nd & 3rd floor for (e) horn/strobes will be removed & replaces, ceiling mount horn/strobes. two new led annunciators will replace old one. system monitor per nfpa72 central system monitoring.$8,000
Jan 24, 2008Completed
final sign-off Apr 2008
384 Post StAquamatic Fire Protectioncut back 8 sprinkler heads on the 1st floor, 8 on the 2nd flr, 8 on the 3rd flr arround the escalator. on the 3rd flr, add 1 sprinkler head, change out 10 and relocate 4 heads$5,500
Jan 2, 2008Never finaled
issued Jan 2008, no final
384 Post Ststreet space
Dec 7, 2007Completed
final sign-off Apr 2008
384 Post StTyco Integrated Securitydue to partial remodeling on 3rd fl, 6 (e) horn/strobes will be removed and relocated to (n) locations and 6 new strobes will be addded. (e) & (n) devices will be connect to (e) panel located in basement & monitor per nfpa 72 central system monitoring$5,551
Nov 29, 2007Never finaled
issued Apr 2008, no final
384 Post Stprada - interior non structural existing 1st floor tenant. finishes, new lights fixtures. new partition with recessed wall standards.$90,000
Nov 6, 2007Completed
final sign-off Apr 2008
384 Post StDpw Inc.3rd floor - relocate (30) existing sprinkler heads and add (1) for new tenant improvement. ref. appl. #2007.10.30.6812.$11,000
Oct 30, 2007Expired or cancelled
cancelled Aug 2022
384 Post St1st floor - interior non-structural remodel to an existing tenant approx 349 sq ft. new partitions with installation of new light fixtures. patch & repair any existing gypsum board.$75,000
Oct 30, 2007Completed
final sign-off Apr 2008
384 Post St2nd & 3rd floor - interior non-structural remodel of demo with new walls, light fixutres. new finishes. fire sprinkler and fire alarm under separate permit.$125,000
Oct 17, 2007Completed
final sign-off Apr 2008
384 Post StTyco Integrated Securitybasement - due to partial remodeling in the basement. one (e) horn/strobe will be removed and relocate & additional horn/strobe devices will be added. devices will be connect to existing panel & monitor per nfpa 72 central system minitoring.$1,700
Oct 10, 2007Completed
final sign-off Apr 2008
384 Post Stinterior (non-structural) remodel of (4) existing vendor areas. (1) oscar de la renta - 911 sq ft 3rd floor (2) armani - 2370 sq ft 3rd floor (3) chloe - 464 sq ft 2nd floor and (4) dolce gabana 312 sq ft 1st floor.$660,000
Sep 17, 2007Completed
final sign-off Apr 2008
384 Post StAquamatic Fire Protectionrelocate extg uprights/pendents 35 due to altered walls/ceiling on first floor of five floor fully sprinkled retail building$11,500
Aug 29, 2007Never finaled
issued Sep 2007, no final
384 Post Stinterior non-structural remodel of sales area on 1st. and 3rd. flr. no work to fire alarm or sprinkler. no exterior work.$330,000
Aug 21, 2007Completed
final sign-off Apr 2008
384 Post StTyco Integrated Security1st & 3rd flrs-due to partial remodeling on 1st and 3rd floor. some exisitng devices will be removed and relocated to new location and new devices will be added. relocated and new devies will be connect to exisitng panel located in basement and monitor per nfp 2 contral monitor.$6,080
Aug 9, 2007Expired or cancelled
expired Apr 2008
384 Post StAquamatic Fire Protection3rd floor-portion remodel for fur salon that includes new or altered walls and ceilings requiring relocation of fire sprinkler heads. relocate 18 heads$3,900
Jul 17, 2007Completed
final sign-off Apr 2008
384 Post Stinterior non-structural remodel of fur sales area on 3/f (approx 1000 sq.ft.). demolish non bearing partition and finishes. new stockroom & fitting room, fire alarm, sprinklers and m.e.p. under seperate permit. no exterior work.$150,000
Jun 21, 2007Completed
final sign-off Apr 2008
384 Post Stground floor remodel of vendor area for prada, gucci, d & g , tods and fendi. remodel cosmetic office and handbag section.new finishes and lighting. sprnklr and fire alarm under seperate permit$500,000
Jun 14, 2007Never finaled
issued Jun 2007, no final
384 Post Ststreet space permit
Mar 14, 2007Never finaled
issued May 2007, no final
384 Post StCailin Construdc5tion, Inc.removal of two non barring walls and remoal of single huan door , wall for future double door, interior non structural demolition work only tenant improvements work under spparate permit soft demo as per ab017 9fbc$900
Feb 14, 2007Never finaled
issued Feb 2007, no final
384 Post Ststreet space
Nov 15, 2005Completed
final sign-off Feb 2006
384 Post St5th floor - revision to approved pa#200508170555 (fire alarm upgrade on 5th floor) revised device layout per sffd inspection.$5,000
Nov 15, 2005Completed
final sign-off Feb 2006
384 Post St2nd floor - revision to approved pa#200508180685 (fire alarm upgrade on 2nd fl) revised device layout per sffd inspection.$4,000
Nov 15, 2005Expired or cancelled
cancelled Nov 2024
384 Post Strevision to approved 200508170555 (fire alarm upgrade on 5th floor) revised device layout per sffd inspection.$5,000
Aug 18, 2005Completed
final sign-off Feb 2006
384 Post Stfire alarm upgrade on 2nd floor$62,000
Aug 17, 2005Completed
final sign-off Feb 2006
384 Post Stfire alarm upgrade for 5th floor.$65,000
Jul 26, 2005Completed
final sign-off Feb 2006
384 Post StAquamatic Fire Protectiont.i. 2nd floor, add / relocate 19 fire sprinkler heads.$4,000
Jul 25, 2005Completed
final sign-off Feb 2006
384 Post Stfinish work in 2 vendor spaces of 2nd flr. (695 sqft & 485 sqft) for prada and dolce & gabana. new$85,000
Jul 1, 2005Completed
final sign-off Feb 2006
384 Post StAquamatic Fire Protectionremodel of 5th floor. add / relocate 186 heads fire sprinklers.$32,550
Jun 14, 2005Completed
final sign-off Feb 2006
384 Post Stinterior non-structural improvements to 2nd floor. new partitions & lighting.$95,000
May 23, 2005Expired or cancelled
expired Jun 2007
384 Post Stinterior non structural soft demolition of 2nd floor only$15,000
May 3, 2005Completed
final sign-off Feb 2006
384 Post Stremodel of 5th fl retail area. interior room structural work only, fitting rms. counters$211,000
Apr 13, 2005Expired or cancelled
cancelled Mar 2006
384 Post Stremodel of lower level offices & stockroom area.relocate office from 5/f.interior only$95,000
Apr 6, 2005Completed
final sign-off Feb 2006
384 Post Stinterior non-structural demolition of 5th floor.$10,000
Mar 25, 2005Never finaled
issued Mar 2005, no final
384 Post StTyco Integrated Securityrenew appl#200210229553 for final inspection
Oct 22, 2002Never finaled
issued Oct 2002, no final
384 Post StTyco Integrated Securityreplacing extg conventional fire panel to addressable fire panel and replacing extg sounding devices$190,000
Jul 8, 2002Expired or cancelled
expired Jan 2004
384 Post Stprovide additional entry doors for windbreak$65,000
Oct 12, 2001Expired or cancelled
expired Feb 2002
384 Post Ststreet space permit
Aug 31, 2001Expired or cancelled
expired Dec 2001
384 Post StTyco Integrated Securityinstall strobes in fitting rooms & horn/strobes in hallway of new fitting rooms located on 2 3 & 4/f$3,000
Aug 27, 2001Expired or cancelled
expired Dec 2001
384 Post StPotter Fire Protectiondelocate 3 and add 2 fire sprinklers to accomodate the new ceiling &wall layout for a retail tent im
Jun 21, 2001Expired or cancelled
expired Jan 2004
384 Post StPotter Fire Protectionrelocate (20) fire sprinklers to accomodate new ceiling & wall construction in a remodeled store$3,750
May 1, 2001Expired or cancelled
expired Nov 2001
384 Post StPotter Fire Protectionrelocate 16 and add 18 fire spriklers to accomodate the new ceiling and wall layout for t.i$8,500
Apr 19, 2001Expired or cancelled
expired Jan 2004
384 Post StTyco Integrated Securitywork on lwr lvl and 1st fl horn/strobes being moved to accomodate partial rmdl 1st fl 37 new horn/st$10,000
Mar 14, 2001Expired or cancelled
expired Jul 2001
384 Post StPotter Fire Protectionrelocate 8 fire sprinklers to acomodate new ceiling and wall construction in a remodel retail store$1,950
Feb 14, 2001Expired or cancelled
expired Aug 2001
384 Post StPotter Fire Protectionrelocate (98) and plug (2)fire sprinkler$15,000
Jan 16, 2001Expired or cancelled
expired Jul 2001
384 Post StPotter Fire Protectionrelocate (68) & add (7) fire sprinkler to accomodate new ceiling & wall construction$15,000
Dec 28, 2000Expired or cancelled
expired Apr 2001
384 Post StTyco Integrated Securityinstalling 10 horn/strobes in newly remodeled fifth floor to existingfir alram system (saks fifth av$3,000
Dec 26, 2000Never finaled
issued Jan 2001, no final
384 Post Stprovide tenant improvement at main level 2nd 3rd and 4th level install selves counter display case$325,000
Nov 17, 2000Expired or cancelled
expired Mar 2002
384 Post Stupgrade below grade level include bldg new decorative staircase$120,000
Oct 10, 2000Expired or cancelled
expired Feb 2001
384 Post StPotter Fire Protectionrelocate 8 sprnkler heads add 2 heads on 5th floor$1,500
Sep 5, 2000Expired or cancelled
expired Sep 2001
384 Post St5th floor limited retail improvements$95,000
Feb 12, 2000Expired or cancelled
expired Feb 2001
384 Post Stmodify existing counter area to handbag & women's clothing boutique$35,000