Brian A. Trainor
- Listed as
- authorized agent-others, contractor
- Firm
- Trainor Commercial Construction Inc.
- Based in
- Petaluma
- On San Francisco permits
- Dec 2003 to Apr 2026
192 permits since 2000 (contractor on 192 permits, authorized agent-others on 3 permits): 106 completed, 9 in progress, 69 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 192.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 22, 2026 | In progress issued May 2026 | 90 Grant Av | Trainor Commercial Construction Inc. | recommencement and completion of work approved under pa# 202208261402.Details
recommencement and completion of work approved under pa# 202208261402. | $375,000 |
| Sep 4, 2025 | In progress issued Apr 2026 | 3325 Fillmore St | Trainor Commercial Construction Inc. | core and shell building remod for future tenant. new storefront, entry doors & windows at the front facace, interior stairs, roof deck & structural retrofit. space to remain vacant until tenant improvement is approved and tenant improvement is finaled.Details
core and shell building remod for future tenant. new storefront, entry doors & windows at the front facace, interior stairs, roof deck & structural retrofit. space to remain vacant until tenant improvement is approved and tenant improvement is finaled. | $400,000 |
| May 28, 2025 | Completed final sign-off Dec 2025 | 28 02nd St | Trainor Commercial Construction Inc. | 1st floor: installation of non structural partitions, and new finishes. this project is located on the ground floor. mep under seperate permit.Details
1st floor: installation of non structural partitions, and new finishes. this project is located on the ground floor. mep under seperate permit. | $160,000 |
| Mar 20, 2025 | Completed final sign-off Apr 2025 | 8 Mission St | Trainor Commercial Construction Inc. | revision 202408148686- admin permit to remove 6th floor from scope of work and add 7th floor. new scope of work should be add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 7,8.Details
revision 202408148686- admin permit to remove 6th floor from scope of work and add 7th floor. new scope of work should be add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 7,8. | |
| Nov 13, 2024 | In progress filed Nov 2024, not yet issued | 3325 Fillmore St | Trainor Commercial Construction Inc. | demolition permit in conformance with sf information sheet s-04 structural demolition permit exception for partial building demolitions. scope of demoition only for non-structural exterior storefont and non-structural walls at first level.Details
demolition permit in conformance with sf information sheet s-04 structural demolition permit exception for partial building demolitions. scope of demoition only for non-structural exterior storefont and non-structural walls at first level. | |
| Nov 1, 2024 | In progress issued Nov 2024 | 335 Powell St | Trainor Commercial Construction Inc. | 12th fl- additional lighting to (e) suites for pa #2024-0916-0809. title 24 sheets.Details
12th fl- additional lighting to (e) suites for pa #2024-0916-0809. title 24 sheets. | $30,000 |
| Sep 30, 2024 | In progress issued Nov 2024 | 3325 Fillmore St | Trainor Commercial Construction Inc. | demolition permit in conformance with s-04 structural demolition permit exception for partial building demolitions. scope of demolition only for interior non-structural partitions, interior finishes, plumbing and electrical. soft demo for market ready.Details
demolition permit in conformance with s-04 structural demolition permit exception for partial building demolitions. scope of demolition only for interior non-structural partitions, interior finishes, plumbing and electrical. soft demo for market ready. | $65,313 |
| Sep 16, 2024 | In progress issued Oct 2024 | 335 Powell St | Trainor Commercial Construction Inc. | conversion of a hotel suite on 12flr london suite into conference roos and converting an exsiting bathroom into an ada compliant all gender restroom. mep design built.Details
conversion of a hotel suite on 12flr london suite into conference roos and converting an exsiting bathroom into an ada compliant all gender restroom. mep design built. | $194,000 |
| Aug 14, 2024 | Completed final sign-off Apr 2025 | 8 Mission St | Trainor Commercial Construction Inc. | add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 6,8.Details
add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 6,8. | $40,000 |
| Aug 7, 2024 | In progress issued Oct 2024 | 150 Stockton St | Trainor Commercial Construction Inc. | 2/f: ti for (e) retail space, scope of work includes millwork, light mechanical work, ceiling lighting is (e) to remain. fitting rooms and cash wrap are (e) to remain. light partition (demo) work. no change in use, occupancy, or zoning. (905 sf total)Details
2/f: ti for (e) retail space, scope of work includes millwork, light mechanical work, ceiling lighting is (e) to remain. fitting rooms and cash wrap are (e) to remain. light partition (demo) work. no change in use, occupancy, or zoning. (905 sf total) | $135,800 |
| Apr 9, 2024 | In progress issued Jun 2024 | 150 Stockton St | Trainor Commercial Construction Inc. | interior tenant improvement of existing retail space for new vendor, work to include built in millwork, lighting and electrical. no change in use, occupancy, egress or zoning. no exterior work and no sf addition.Details
interior tenant improvement of existing retail space for new vendor, work to include built in millwork, lighting and electrical. no change in use, occupancy, egress or zoning. no exterior work and no sf addition. | $45,000 |
| Apr 9, 2024 | In progress issued Oct 2024 | 150 Stockton St | Trainor Commercial Construction Inc. | 2nd floor interior tenant improvement within (e) retail store scope of work includes vendor shop build out including millwork and electrical no change in use, occupancy, egress or zoningDetails
2nd floor interior tenant improvement within (e) retail store scope of work includes vendor shop build out including millwork and electrical no change in use, occupancy, egress or zoning | $214,500 |
| Oct 31, 2023 | Completed final sign-off Nov 2023 | 28 02nd St | Trainor Commercial Construction Inc. | renew permit to obtain final inspection for bpa#201901150394, all work is complete.Details
renew permit to obtain final inspection for bpa#201901150394, all work is complete. | |
| Sep 26, 2023 | Completed final sign-off Mar 2024 | 499 Jackson St | Trainor Commercial Construction Inc. | 5/f: construction of new non-structural partitions, stair guardrails, doors, frames, handware, millwork, ceilings, finishes, mep included. demo portion of interior structure wall to enlarge (e) opening. kitchenette area-no catering. life safety under separate permit.Details
5/f: construction of new non-structural partitions, stair guardrails, doors, frames, handware, millwork, ceilings, finishes, mep included. demo portion of interior structure wall to enlarge (e) opening. kitchenette area-no catering. life safety under separate permit. | $500,000 |
| Apr 25, 2023 | Completed final sign-off Jan 2024 | 335 Powell St | Trainor Commercial Construction Inc. | mep & food service drawings associted w/pa# 202212218855, fire sprinkler & alarm deferredDetails
mep & food service drawings associted w/pa# 202212218855, fire sprinkler & alarm deferred | $160,000 |
| Mar 23, 2023 | Never finaled issued Aug 2023, no final | 150 Stockton St | Trainor Commercial Construction Inc. | store in store interior only build with new non-load bearng walls, finishes, elec fixtures, and wiring, hvac workDetails
store in store interior only build with new non-load bearng walls, finishes, elec fixtures, and wiring, hvac work | $165,000 |
| Feb 10, 2023 | Completed final sign-off Aug 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | interior remodel only. wall, ceiling & floor finishes for ground fl elevator lobby, lighting and electrical under separate permits. ref 2022-0630-7538 and 2021-1104-1845.Details
interior remodel only. wall, ceiling & floor finishes for ground fl elevator lobby, lighting and electrical under separate permits. ref 2022-0630-7538 and 2021-1104-1845. | $65,000 |
| Dec 21, 2022 | Completed final sign-off Jan 2024 | 335 Powell St | Trainor Commercial Construction Inc. | lobby, level 1 - remodel of oak room and medallion room into private hotel lounge. mep and food service drwgs under separate permits. fire sprinkler and alarm drwgs as deferred submittalDetails
lobby, level 1 - remodel of oak room and medallion room into private hotel lounge. mep and food service drwgs under separate permits. fire sprinkler and alarm drwgs as deferred submittal | $160,000 |
| Dec 14, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | revision to 202211025766. added hand sink in gr fl coffee roaster enclosed space per sf dept of health commentDetails
revision to 202211025766. added hand sink in gr fl coffee roaster enclosed space per sf dept of health comment | $5,000 |
| Nov 16, 2022 | Never finaled issued Jan 2023, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 1/flr: tenant improvement of retail space for new vendors, work to include demo and installation of partitions, finishes, loose fixtures and ceiling and lighting remodel. mech and elec work as req. no change of use, occupancy, egress, or zoning in the app. no exterior work.Details
1/flr: tenant improvement of retail space for new vendors, work to include demo and installation of partitions, finishes, loose fixtures and ceiling and lighting remodel. mech and elec work as req. no change of use, occupancy, egress, or zoning in the app. no exterior work. | $90,000 |
| Nov 2, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | revision to 202206307538 ground fl coffee roaster wth enclosure and associated venting thru fl 2- 5 above & terminating at roof.Details
revision to 202206307538 ground fl coffee roaster wth enclosure and associated venting thru fl 2- 5 above & terminating at roof. | $30,000 |
| Oct 31, 2022 | Never finaled issued Feb 2023, no final | 90 Grant Av | Trainor Commercial Construction Inc. | basement - interior racking permitDetails
basement - interior racking permit | $190,000 |
| Aug 26, 2022 | Never finaled issued Sep 2022, no final | 90 Grant Av | Trainor Commercial Construction Inc. | exterior facade improvements: replacement of storfront entry and canopy of ground flr glazing and storefront framing. no change of use, interior under scope separate permit no awnings save for this replaced canopy at the front of the store, to ensure the fire escape is accesible by the sffdDetails
exterior facade improvements: replacement of storfront entry and canopy of ground flr glazing and storefront framing. no change of use, interior under scope separate permit no awnings save for this replaced canopy at the front of the store, to ensure the fire escape is accesible by the sffd | $375,000 |
| Aug 26, 2022 | Completed final sign-off Dec 2022 | 1763 Union St | Trainor Commercial Construction Inc. | commercial ti of e dental office. no change in occupancy. area of remodel limited to 1st fl. demo e casework,plumbing fixt,dental equip. new partitoins between treatment chairs,new plumb fx and dental equp. ceiling lighting, demo awning,remove window graphics.power door operner in e entry door.Details
commercial ti of e dental office. no change in occupancy. area of remodel limited to 1st fl. demo e casework,plumbing fixt,dental equip. new partitoins between treatment chairs,new plumb fx and dental equp. ceiling lighting, demo awning,remove window graphics.power door operner in e entry door. | $300,000 |
| Aug 17, 2022 | Never finaled issued Sep 2022, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 2/f ti of (e) retail, new vendor, work to include millwork, flooring, finishes and electrical fixtures.Details
2/f ti of (e) retail, new vendor, work to include millwork, flooring, finishes and electrical fixtures. | $150,000 |
| Jul 12, 2022 | Completed final sign-off Sep 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 4/f: construction of sofit & interior demountable furniture installation. rev to 202102255364Details
4/f: construction of sofit & interior demountable furniture installation. rev to 202102255364 | $1,000 |
| Jun 30, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | ground floor and basement change of use. new partitions, finishes, mep and kitchen equip for specialty grocery retail sales, minor food prep. new single occupancy restroom at ground floor and basement.Details
ground floor and basement change of use. new partitions, finishes, mep and kitchen equip for specialty grocery retail sales, minor food prep. new single occupancy restroom at ground floor and basement. | $350,000 |
| Jun 28, 2022 | Completed final sign-off May 2023 | 28 02nd St | Trainor Commercial Construction Inc. | 7th fl: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork, finishes. sprinklers and fire alarm under separate permit.Details
7th fl: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork, finishes. sprinklers and fire alarm under separate permit. | $250,000 |
| Apr 11, 2022 | Never finaled issued Aug 2022, no final | 90 Grant Av | Trainor Commercial Construction Inc. | interior tenant improvement of 12,418 sqft. no exterior modifications under this permit. incl mechanical. fire alarm/sprinklers under sep permits.Details
interior tenant improvement of 12,418 sqft. no exterior modifications under this permit. incl mechanical. fire alarm/sprinklers under sep permits. | $2,500,000 |
| Mar 9, 2022 | Never finaled issued Mar 2022, no final | 188 Henry Adams St | Trainor Commercial Construction Inc. | minor ti consisting of removal of decorative elements on exterior and replastering of exterior stucco, replacement of doors, removal of interior wood trim and repainting of interior walls.rjeplace roods with glass doors with hidden metal channgel frame & windows.Details
minor ti consisting of removal of decorative elements on exterior and replastering of exterior stucco, replacement of doors, removal of interior wood trim and repainting of interior walls.rjeplace roods with glass doors with hidden metal channgel frame & windows. | $2,000,000 |
| Feb 24, 2022 | Completed final sign-off Dec 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 6th floor: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. this project is located on 6th floor. suite #600. sprinkler and fire alarm system designs will be submitted under seperate permits.Details
6th floor: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. this project is located on 6th floor. suite #600. sprinkler and fire alarm system designs will be submitted under seperate permits. | $250,000 |
| Jan 3, 2022 | Completed final sign-off Dec 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 5/f: construction of interior partition , act ceiling, lighting, plumbing fixtures, millwork, and finishes. this project is located on 5/f, ste 500. sprinkler and fire alarm system design will be submitted under sep permits.Details
5/f: construction of interior partition , act ceiling, lighting, plumbing fixtures, millwork, and finishes. this project is located on 5/f, ste 500. sprinkler and fire alarm system design will be submitted under sep permits. | $250,000 |
| Nov 10, 2021 | Completed final sign-off Dec 2021 | 2117 Fillmore St | Trainor Commercial Construction Inc. | replace fabric @ (e) awning. sign "benefit san francisco"Details
replace fabric @ (e) awning. sign "benefit san francisco" | $3,000 |
| Nov 4, 2021 | Never finaled issued Feb 2022, no final | 499 Jackson St | Trainor Commercial Construction Inc. | to comply with accessible business entry program per ordinance 51-16. ground flr: new accessible business entrance barrier removal. relocation of existing building main entry doors on jackson street. no other work is proposed. electrical is a deferred permit submittal.Details
to comply with accessible business entry program per ordinance 51-16. ground flr: new accessible business entrance barrier removal. relocation of existing building main entry doors on jackson street. no other work is proposed. electrical is a deferred permit submittal. | $25,000 |
| Nov 4, 2021 | Never finaled issued Jan 2022, no final | 90 Grant Av | Trainor Commercial Construction Inc. | g/f interior demolition. existing decorative stiars & floor opening to be in-filled per structural dwgs.Details
g/f interior demolition. existing decorative stiars & floor opening to be in-filled per structural dwgs. | $85,000 |
| Nov 3, 2021 | Completed final sign-off Dec 2021 | 2117 Fillmore St | Trainor Commercial Construction Inc. | ground floor, beauty shop: new wall and floor finish, new furniture. electrical for new fixtures. walls ceiling lighting to remain existing, restrooms existing. basement no work.Details
ground floor, beauty shop: new wall and floor finish, new furniture. electrical for new fixtures. walls ceiling lighting to remain existing, restrooms existing. basement no work. | $45,000 |
| Oct 18, 2021 | Never finaled issued Oct 2021, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 3/f: tenant improvement: architectural walls, doors, finishes, fixtures and ceiling/lighting remodel (e) hvac systems to remainDetails
3/f: tenant improvement: architectural walls, doors, finishes, fixtures and ceiling/lighting remodel (e) hvac systems to remain | $120,000 |
| Feb 25, 2021 | Completed final sign-off Dec 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 4th fl: interior tenant improvement only including new partitions, doors, floorings, and ceilings.Details
4th fl: interior tenant improvement only including new partitions, doors, floorings, and ceilings. | $250,000 |
| Jan 22, 2021 | Completed final sign-off Apr 2021 | 335 Powell St | Trainor Commercial Construction Inc. | rev pa 202008292929: food service equip rev to electrical per food service equip, rev to hood assemby details on arch and mech drawings, mnor rev to interior elevations.Details
rev pa 202008292929: food service equip rev to electrical per food service equip, rev to hood assemby details on arch and mech drawings, mnor rev to interior elevations. | |
| Dec 24, 2020 | Completed final sign-off Oct 2024 | 28 02nd St | Trainor Commercial Construction Inc. | 3rd fl tenant improvements. m.e.p.. included. life safety under separate permit.Details
3rd fl tenant improvements. m.e.p.. included. life safety under separate permit. | $250,000 |
| Oct 7, 2020 | Completed final sign-off Nov 2020 | 425 Hayes St | Trainor Commercial Construction Inc. | installation of power door actuators to provide accessible business entrance programDetails
installation of power door actuators to provide accessible business entrance program | $1,000 |
| Aug 29, 2020 | Completed final sign-off Mar 2021 | 335 Powell St | Trainor Commercial Construction Inc. | demolish (e) lobby bistro bar, portion of boh kitchen, millwork & finishes. renovate (e) lobby bistro bar, new non-rated partitions, seating, millwork, lighting & finishes. electrical modifications for new millwork & kitchen equipment. new type2 hood & ducting. modify plumbing & ada pot & restroomsDetails
demolish (e) lobby bistro bar, portion of boh kitchen, millwork & finishes. renovate (e) lobby bistro bar, new non-rated partitions, seating, millwork, lighting & finishes. electrical modifications for new millwork & kitchen equipment. new type2 hood & ducting. modify plumbing & ada pot & restrooms | $158,000 |
| Jul 8, 2020 | Never finaled issued Apr 2021, no final | 225 Powell St | Trainor Commercial Construction Inc. | the project scope includes the renovation of ground floor public space of an existing hotel. specific work includes the alteration of walls, ceilings, lighting, and finishes. the project also proposes a new canopy and storefront entrance doors. fire sprinkler & fire alarm work under separate permit.Details
the project scope includes the renovation of ground floor public space of an existing hotel. specific work includes the alteration of walls, ceilings, lighting, and finishes. the project also proposes a new canopy and storefront entrance doors. fire sprinkler & fire alarm work under separate permit. | $90,000 |
| Jun 10, 2020 | Never finaled issued Jan 2021, no final | 225 Powell St | Trainor Commercial Construction Inc. | the project scope consists of the renovation of the ground floor public space of an existing hotel. specific works includes the removal of an existing bar and the creation of new retail tenant space fronting powell street. no exterior work is proposed.Details
the project scope consists of the renovation of the ground floor public space of an existing hotel. specific works includes the removal of an existing bar and the creation of new retail tenant space fronting powell street. no exterior work is proposed. | $75,000 |
| Mar 5, 2020 | Never finaled issued Mar 2020, no final | 650 Sacramento St | Trainor Commercial Construction Inc. | demolition of ceiling finishes at gr fl of currently vacant office building per ab-17Details
demolition of ceiling finishes at gr fl of currently vacant office building per ab-17 | $1,000 |
| Jan 22, 2020 | Completed final sign-off Mar 2020 | 444 Jackson St | Trainor Commercial Construction Inc. | modify extg concrete slab at entry. revision to pa# 2019-0924-2597 to provide additional front entry upgrades not clearly shown under pa# 2019-0924-2597.Details
modify extg concrete slab at entry. revision to pa# 2019-0924-2597 to provide additional front entry upgrades not clearly shown under pa# 2019-0924-2597. | $2,000 |
| Jan 15, 2020 | Never finaled issued Feb 2020, no final | 166 Geary St | Trainor Commercial Construction Inc. | 7th flr. install new card reader on lobby doors, manual unlocking device, install new push to exit, and sensor release. ref pa# 201906052591.Details
7th flr. install new card reader on lobby doors, manual unlocking device, install new push to exit, and sensor release. ref pa# 201906052591. | |
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 150 Stockton St | Trainor Commercial Construction Inc. | installation of stockroom shelving, 3rd floor; ref pa#2019-0510-0303.Details
installation of stockroom shelving, 3rd floor; ref pa#2019-0510-0303. | $6,000 |
| Dec 4, 2019 | Completed final sign-off Mar 2020 | 207 Skyline Bl | Trainor Commercial Construction Inc. | remodel (e) women's locker room, fixture & finishes only. no structuralDetails
remodel (e) women's locker room, fixture & finishes only. no structural | $150,000 |
| Sep 24, 2019 | Never finaled issued Oct 2019, no final | 444 Jackson St | Trainor Commercial Construction Inc. | t.i. of (e) 1-story retail building including partitionts, door, fixtures,finishes, electrical, mechanical and plumbing. addition of (n) rooftop equiopment, not visilbe from row.Details
t.i. of (e) 1-story retail building including partitionts, door, fixtures,finishes, electrical, mechanical and plumbing. addition of (n) rooftop equiopment, not visilbe from row. | $141,000 |
| Aug 15, 2019 | Never finaled issued Aug 2019, no final | 425 Hayes St | Trainor Commercial Construction Inc. | revision to 201906193894 ti - to int lighting, mep distribution fixture, finishes and non structural partitions. increase of sq by moving non structural partition to adjacent tenant. no change in occupancy or useDetails
revision to 201906193894 ti - to int lighting, mep distribution fixture, finishes and non structural partitions. increase of sq by moving non structural partition to adjacent tenant. no change in occupancy or use | |
| Jun 19, 2019 | Never finaled issued Jul 2019, no final | 425 Hayes St | Trainor Commercial Construction Inc. | new roof top unit, electrical and mechanical upgrade, minor non structural partitions, commercial t.i. n/a for maherDetails
new roof top unit, electrical and mechanical upgrade, minor non structural partitions, commercial t.i. n/a for maher | $85,000 |
| Jun 19, 2019 | Completed final sign-off Sep 2019 | 425 Hayes St | Trainor Commercial Construction Inc. | back of house shelving installation. n/a for maherDetails
back of house shelving installation. n/a for maher | $13,000 |
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 110 Geary St | Trainor Commercial Construction Inc. | to comply w/ n.o.v 201946251. replace damaged window and frame in-kind. work consistant w/ privious approval #214-003121 ptaDetails
to comply w/ n.o.v 201946251. replace damaged window and frame in-kind. work consistant w/ privious approval #214-003121 pta | $100,000 |
| Jun 6, 2019 | Never finaled issued Oct 2019, no final | 166 Geary St | Concord Construction Inc, Trainor Commercial Construction Inc. | 14th and 15th flrs. install (n) partitions, gyp, ceiling. (n) millwork, countertops, fixtures. (n) finishes, paint, floor covers. install card readers at elevator lobby. install light fixtures, electr equip. install plumbing equip. fire alarm, sprinklers under separate permit. emerg resp def submit.Details
14th and 15th flrs. install (n) partitions, gyp, ceiling. (n) millwork, countertops, fixtures. (n) finishes, paint, floor covers. install card readers at elevator lobby. install light fixtures, electr equip. install plumbing equip. fire alarm, sprinklers under separate permit. emerg resp def submit. | $1,320,600 |
| Jun 5, 2019 | Never finaled issued Nov 2019, no final | 166 Geary St | Concord Construction Inc, Trainor Commercial Construction Inc. | installation of new partitions and gyp bd ceiling. new millwork, countertops fixtures, new finishes throughout, paint, floor dovering, installation of card readers at elev lobby. light fixt and other elec equip. instal plumb eqip.alarm,sprnklr sep permit, emergency responder comm system deffered subDetails
installation of new partitions and gyp bd ceiling. new millwork, countertops fixtures, new finishes throughout, paint, floor dovering, installation of card readers at elev lobby. light fixt and other elec equip. instal plumb eqip.alarm,sprnklr sep permit, emergency responder comm system deffered sub | $1,369,960 |
| May 10, 2019 | Never finaled issued Jul 2019, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 3rd flr. interior improvements within an (e)retail store. walls, doors, finishes, ceiling and lighting remodel.Details
3rd flr. interior improvements within an (e)retail store. walls, doors, finishes, ceiling and lighting remodel. | $192,565 |
| May 10, 2019 | Never finaled issued Jul 2019, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 1st flr. interior improvements within an (e)retail store. walls, doors, finishes, ceiling and lighting remodel.Details
1st flr. interior improvements within an (e)retail store. walls, doors, finishes, ceiling and lighting remodel. | $175,000 |
| Apr 11, 2019 | Completed final sign-off Aug 2019 | 114 Sansome St | Trainor Commercial Construction Inc. | 11th flr. tenant improvement to (e) office space incl interior non-bearing partitions, millwork and interior finishes.Details
11th flr. tenant improvement to (e) office space incl interior non-bearing partitions, millwork and interior finishes. | $290,409 |
| Mar 21, 2019 | Never finaled issued Jan 2020, no final | 562 Sutter St | Trainor Commercial Construction Inc. | permit consists of modifications to basment maintenance room and office to support new sidewalk lift and machine room. existing lift gate opening at sutter st sidewalk to be revised; no change to sidewalk grading. new lift pit. no structural modification to sidewalkDetails
permit consists of modifications to basment maintenance room and office to support new sidewalk lift and machine room. existing lift gate opening at sutter st sidewalk to be revised; no change to sidewalk grading. new lift pit. no structural modification to sidewalk | $242,000 |
| Mar 13, 2019 | Never finaled issued Jun 2019, no final | 425 Hayes St | Trainor Commercial Construction Inc. | t.i. construction will include new non-structural partitions, casework, fixtures anchitectural finishes. no change in occupancyDetails
t.i. construction will include new non-structural partitions, casework, fixtures anchitectural finishes. no change in occupancy | $250,000 |
| Feb 22, 2019 | Never finaled issued Apr 2019, no final | 22 04th St | Trainor Commercial Construction Inc. | 4th fl - minor office remodel. entry door to suite replacement with storefront.Details
4th fl - minor office remodel. entry door to suite replacement with storefront. | $35,000 |
| Jul 19, 2018 | Never finaled issued Jul 2018, no final | 150 Stockton St | Trainor Commercial Construction Inc. | small ti area within a major retail store, adding casework fixtures, minor ceiling, lighting, mechanical, electrical remodel. no exterior work, no removal of historical fabrickDetails
small ti area within a major retail store, adding casework fixtures, minor ceiling, lighting, mechanical, electrical remodel. no exterior work, no removal of historical fabrick | $80,000 |
| May 9, 2018 | Never finaled issued May 2018, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 3rd floor - ti within an (e) retail space, sinishes, ele, lighting, power, soffit framing maher naDetails
3rd floor - ti within an (e) retail space, sinishes, ele, lighting, power, soffit framing maher na | $45,500 |
| May 2, 2018 | Never finaled issued May 2018, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 1st fl: interior tenant improvemnt in existing retail store, includes mechanical & electrical. maher naDetails
1st fl: interior tenant improvemnt in existing retail store, includes mechanical & electrical. maher na | $100,000 |
| Apr 20, 2018 | Completed final sign-off Sep 2018 | 526 Washington St | Trainor Commercial Construction Inc. | minor demolition barrior removal, new cabinetry, new path to accessible restrooms. area plus or minus 1700 sq ft. n/a for maherDetails
minor demolition barrior removal, new cabinetry, new path to accessible restrooms. area plus or minus 1700 sq ft. n/a for maher | $15,000 |
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 4th flr - mep's for 201802080760 and revision electrical maher naDetails
4th flr - mep's for 201802080760 and revision electrical maher na | $8,000 |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 150 Stockton St | Trainor Commercial Construction Inc. | 4th flr - interior improvements to womens customer restroom, within (e) retail store. includes finishes, doors, ceiling and lighting maher naDetails
4th flr - interior improvements to womens customer restroom, within (e) retail store. includes finishes, doors, ceiling and lighting maher na | $32,000 |
| Dec 18, 2017 | Completed final sign-off Apr 2018 | 127 Ellis St | Trainor Commercial Construction Inc. | 1st fl: demolition of existing wall & construction of cross wall.Details
1st fl: demolition of existing wall & construction of cross wall. | $20,000 |
| Dec 14, 2017 | Completed final sign-off Nov 2018 | 1155 04th St | Trainor Commercial Construction Inc. | (n) interior tenant improvement: (n) walls, doors, casework, equipment, furniture, wall finishes, ceiling, lighting, restrooms & patio seatingDetails
(n) interior tenant improvement: (n) walls, doors, casework, equipment, furniture, wall finishes, ceiling, lighting, restrooms & patio seating | $350,000 |
| Oct 30, 2017 | Never finaled issued Oct 2017, no final | 590 Hayes St | Trainor Commercial Construction Inc. | administrative correction to bpa #2016-12-20-5468. original permit application references existing retail store. permit correction is to identify 1st time occupancy within new building.Details
administrative correction to bpa #2016-12-20-5468. original permit application references existing retail store. permit correction is to identify 1st time occupancy within new building. | |
| Oct 10, 2017 | Completed final sign-off Nov 2017 | 3126 16th St | Trainor Commercial Construction Inc. | ada barrier removal only: upgrade (e) restroom including new plumbing fixtures, hardware & finishes. electrical under sep permit.no change in use, occupancy, egress, construction or sf. no f/s or f/a work req. maher n/a.Details
ada barrier removal only: upgrade (e) restroom including new plumbing fixtures, hardware & finishes. electrical under sep permit.no change in use, occupancy, egress, construction or sf. no f/s or f/a work req. maher n/a. | $15,000 |
| Oct 3, 2017 | Completed final sign-off Mar 2018 | 520 Washington St | Trainor Commercial Construction Inc. | ti - no exterior work. new hair salon including new walls, flooring, ceiling furring, cabinets, styling stations, shampoo stations, lighting & plumbing to new sinks. hvac to remain. maher naDetails
ti - no exterior work. new hair salon including new walls, flooring, ceiling furring, cabinets, styling stations, shampoo stations, lighting & plumbing to new sinks. hvac to remain. maher na | $45,000 |
| Sep 22, 2017 | Never finaled issued Sep 2017, no final | 260 Church St | Trainor Commercial Construction Inc. | upgrade (e) restrooms: (n) plumbing fixtures, hardware & finishes. electrical under sep. permit. mechanical existing to remain. no fire sprinker or alarm work required.Details
upgrade (e) restrooms: (n) plumbing fixtures, hardware & finishes. electrical under sep. permit. mechanical existing to remain. no fire sprinker or alarm work required. | $15,000 |
| Sep 15, 2017 | Completed final sign-off Feb 2018 | 3157 Geary Bl | Trainor Commercial Construction Inc. | barrier removal only - upgrade (e) restroom in seating area including (n) plumbing fixtures, hardware and finishes. electrical under separate permit. no change in use, occupancy, egress, construction type or sf. no fire sprinkler or alarm work requiredDetails
barrier removal only - upgrade (e) restroom in seating area including (n) plumbing fixtures, hardware and finishes. electrical under separate permit. no change in use, occupancy, egress, construction type or sf. no fire sprinkler or alarm work required | $15,000 |
| Sep 12, 2017 | Completed final sign-off Dec 2017 | 3318 24th St | Trainor Commercial Construction Inc. | barrier removal only - upgrade (e) rsstroom in seating area of (e0 cafe including: (n) plumbing fixtures, hardware & finishes. electrical under separate. n ochange in use, occupancy, egress, construction type or sq ft, no fire sprinkler or alarm work required.Details
barrier removal only - upgrade (e) rsstroom in seating area of (e0 cafe including: (n) plumbing fixtures, hardware & finishes. electrical under separate. n ochange in use, occupancy, egress, construction type or sq ft, no fire sprinkler or alarm work required. | $15,000 |
| Sep 1, 2017 | Completed final sign-off Sep 2017 | 3465 California St | Trainor Commercial Construction Inc. | barrier removal only. upgrade e restroom, n plumbing fixtures, finishes, hardware, elec sep permit. no fire sprinkler or alarm work, no chang occupancy, egress, construction type, sf or useDetails
barrier removal only. upgrade e restroom, n plumbing fixtures, finishes, hardware, elec sep permit. no fire sprinkler or alarm work, no chang occupancy, egress, construction type, sf or use | $10,000 |
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 520 Washington St | Trainor Commercial Construction Inc. | 1/f- demolition only, preparation for future tenant improvement per ab-17. n/a ordinance #155-13. maher ord 155-13 naDetails
1/f- demolition only, preparation for future tenant improvement per ab-17. n/a ordinance #155-13. maher ord 155-13 na | $5,000 |
| Jul 27, 2017 | Completed final sign-off Aug 2017 | 1400 Van Ness Av | Trainor Commercial Construction Inc. | g/f -coffee shop: upgrade existing restroom. barrier removal (ada restroom). electrical under sep. permit.Details
g/f -coffee shop: upgrade existing restroom. barrier removal (ada restroom). electrical under sep. permit. | $7,500 |
| Jul 19, 2017 | Never finaled issued Aug 2017, no final | 601 Van Ness Av | Trainor Commercial Construction Inc. | replace sink and toilet in (e) locations. install touchless accessories per ew 201706296401 and plumbing permit pp20170711911Details
replace sink and toilet in (e) locations. install touchless accessories per ew 201706296401 and plumbing permit pp20170711911 | $5,000 |
| Jul 13, 2017 | Completed final sign-off Sep 2017 | 170 Ofarrell St | Trainor Commercial Construction Inc. | #428: new interior, non-structural restaurant buildout for subway in macy's food court w/ (e) walk in, (e) wh, (n) ventless hood, (n) equipment, all plumbing outlets (e). fa/fs deffered.Details
#428: new interior, non-structural restaurant buildout for subway in macy's food court w/ (e) walk in, (e) wh, (n) ventless hood, (n) equipment, all plumbing outlets (e). fa/fs deffered. | $30,000 |
| Jun 22, 2017 | Never finaled issued Jun 2017, no final | 225 Powell St | Trainor Commercial Construction Inc. | temporary storefront barricade in sidewalk, related to renovation pa#201701268000, not attached to building store frontDetails
temporary storefront barricade in sidewalk, related to renovation pa#201701268000, not attached to building store front | $8,000 |
| May 11, 2017 | Never finaled issued Aug 2017, no final | 225 Powell St | Trainor Commercial Construction Inc. | basement- renovation of elevator control room at the basement level. specific work consists of the selective demo and reconstruction of walls, floors, ceilings and finishes. fire sprinkler and fire alarm under separate permitDetails
basement- renovation of elevator control room at the basement level. specific work consists of the selective demo and reconstruction of walls, floors, ceilings and finishes. fire sprinkler and fire alarm under separate permit | $22,500 |
| May 2, 2017 | Completed final sign-off Oct 2018 | 590 Hayes St | Trainor Commercial Construction Inc. | revision to 201612205468. reconfiguration of entry at hayes st retail space on ground floor. no other workDetails
revision to 201612205468. reconfiguration of entry at hayes st retail space on ground floor. no other work | $12,000 |
| Apr 25, 2017 | Never finaled issued Jul 2017, no final | 2213 Fillmore St | Trainor Commercial Construction Inc. | non structural interior tenant improvement for cafe. new partitions, lighting, mechanical + electrical systems. new finishes & food service equipement.Details
non structural interior tenant improvement for cafe. new partitions, lighting, mechanical + electrical systems. new finishes & food service equipement. | $300,000 |
| Apr 25, 2017 | Never finaled issued May 2017, no final | 2213 Fillmore St | Trainor Commercial Construction Inc. | remove e interior partitions, casework, equipment, furniture items as noted on d0.01. remove e ceiling finishes, framing, lighting fixtures, mech duct and assoc items as indicate d0.02 accessible features included in subsequent tenant improvement per sfbc ab-017Details
remove e interior partitions, casework, equipment, furniture items as noted on d0.01. remove e ceiling finishes, framing, lighting fixtures, mech duct and assoc items as indicate d0.02 accessible features included in subsequent tenant improvement per sfbc ab-017 | $15,000 |
| Mar 20, 2017 | Never finaled issued Jul 2017, no final | 103 Geary St | Trainor Commercial Construction Inc. | to erect electric, wall, single faced sign.Details
to erect electric, wall, single faced sign. | $3,000 |
| Mar 7, 2017 | Completed final sign-off Jan 2018 | 225 Powell St | Trainor Commercial Construction Inc. | mep and kitchen scope only for 201611223371 for renovation of existing restaurantDetails
mep and kitchen scope only for 201611223371 for renovation of existing restaurant | $750,000 |
| Jan 30, 2017 | Expired or cancelled cancelled Mar 2019 | 301 Mission St | Trainor Commercial Construction Inc. | #3a- to comply with nov#201643625, to correct ramps at the following locations: lobby porte cochers, lobby mid-rise, level 2 cl pool and level 2 cl-mid rise. n/a ordinance #155-13Details
#3a- to comply with nov#201643625, to correct ramps at the following locations: lobby porte cochers, lobby mid-rise, level 2 cl pool and level 2 cl-mid rise. n/a ordinance #155-13 | $19,000 |
| Jan 26, 2017 | Completed final sign-off Jan 2018 | 225 Powell St | Trainor Commercial Construction Inc. | renovation of public space at grand level (entrance,lobby, storefront, canopy, back of house)includes selective demolation & reconstruction of walls, floors, ceilings and finishes for reconfiguration of public spaces. fire life safety under separate permit.Details
renovation of public space at grand level (entrance,lobby, storefront, canopy, back of house)includes selective demolation & reconstruction of walls, floors, ceilings and finishes for reconfiguration of public spaces. fire life safety under separate permit. | $350,000 |
| Jan 24, 2017 | Expired or cancelled cancelled Mar 2019 | 301 Mission St | Trainor Commercial Construction Inc. | #3a - to comply w/complaint #201647681 - repair ramps on b1 north, b1 south & level 2 cl-1 elevator. maher ord 155-13 naDetails
#3a - to comply w/complaint #201647681 - repair ramps on b1 north, b1 south & level 2 cl-1 elevator. maher ord 155-13 na | $15,000 |
| Jan 5, 2017 | Completed final sign-off Jun 2017 | 33 29th St | Trainor Commercial Construction Inc. | replace front windows with marvin clad windows. replace additional 16 windows damaged by fire. install new clapboard siding to side and rear of building.Details
replace front windows with marvin clad windows. replace additional 16 windows damaged by fire. install new clapboard siding to side and rear of building. | $80,000 |
| Dec 20, 2016 | Completed final sign-off Oct 2018 | 590 Hayes St | Trainor Commercial Construction Inc. | unit #3: interior non structural renovation of (e) retail store. no change of use or occupancy, fully sprinklered building. no exterior work. fire and signage under separate permitsDetails
unit #3: interior non structural renovation of (e) retail store. no change of use or occupancy, fully sprinklered building. no exterior work. fire and signage under separate permits | $250,000 |
| Dec 20, 2016 | Never finaled issued Jan 2017, no final | 590 Hayes St | Trainor Commercial Construction Inc. | install 1 projecting double faced electric blade signDetails
install 1 projecting double faced electric blade sign | $5,000 |
| Dec 20, 2016 | Never finaled issued Jan 2017, no final | 590 Hayes St | Trainor Commercial Construction Inc. | one vinyl graphic inside window stencil; painted on wall as shownDetails
one vinyl graphic inside window stencil; painted on wall as shown | $100 |
| Dec 6, 2016 | Completed final sign-off Jun 2017 | 103 Geary St | Trainor Commercial Construction Inc. | interior tenant improvement. facade under separate permitDetails
interior tenant improvement. facade under separate permit | $155,000 |
| Dec 5, 2016 | Never finaled issued Jan 2017, no final | 103 Geary St | Trainor Commercial Construction Inc. | temporary baricade. no interior workDetails
temporary baricade. no interior work | $5,000 |
| Dec 1, 2016 | Never finaled issued Jan 2017, no final | 103 Geary St | Trainor Commercial Construction Inc. | non-structural interior demo/ per ab-017. space to remain vacant until ada features restoredDetails
non-structural interior demo/ per ab-017. space to remain vacant until ada features restored | $10,000 |
| Nov 22, 2016 | Completed final sign-off Jan 2018 | 225 Powell St | Trainor Commercial Construction Inc. | interior renovation of e restaurant & kitchen at gr fl and basement. work includes selective demo & reconstruction of walls, floors, ceilings and finishes. no exterior work. fire life safety work under sep permitDetails
interior renovation of e restaurant & kitchen at gr fl and basement. work includes selective demo & reconstruction of walls, floors, ceilings and finishes. no exterior work. fire life safety work under sep permit | $116,000 |
| Nov 15, 2016 | Never finaled issued Dec 2016, no final | 301 Howard St | Trainor Commercial Construction Inc. | install (2) electrical signDetails
install (2) electrical sign | $1,000 |