Gregory Smith
- Listed as
- architect
- Based in
- Alameda
- On San Francisco permits
- Dec 2010 to Jun 2026
54 permits since 2000 (architect on 54 permits): 26 completed, 2 in progress, 3 never finaled, 23 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 15, 2026 | In progress issued Aug 2026 | 321 Caselli Av | Apollo Building & Roofing Group Inc. | add new skylight on flat roof.Details
add new skylight on flat roof. | $3,000 |
| May 9, 2025 | Completed final sign-off May 2025 | 60 Maiden Ln | Olive Construction Corp | revision to pa# 202501218728, door size change (interior)Details
revision to pa# 202501218728, door size change (interior) | |
| Jan 21, 2025 | Completed final sign-off May 2025 | 60 Maiden Ln | Olive Construction Corp | commmencement of work not started under previously approved permit pa# 201912230357. (work to comply with sfdbi accessibile entrance program: replace 30" (x2 pair) doors with (1) one 42" wide door. add power door assist operator. (accessible business entrance program per ordinance 51-16.)Details
commmencement of work not started under previously approved permit pa# 201912230357. (work to comply with sfdbi accessibile entrance program: replace 30" (x2 pair) doors with (1) one 42" wide door. add power door assist operator. (accessible business entrance program per ordinance 51-16.) | $10,000 |
| Oct 3, 2024 | In progress filed Oct 2024, not yet issued | 299 West Portal Av | t.i. create opthamology office, no change of exterior, 3 n) treatment rms, reception, testing rm improvements to e) rr to provide accessibility compliance included n) lavatory, toilet & grab bars, n) gyo board walls, ceiling, new flooring, lighting, power plan, & sinks. install n)power door operatorDetails
t.i. create opthamology office, no change of exterior, 3 n) treatment rms, reception, testing rm improvements to e) rr to provide accessibility compliance included n) lavatory, toilet & grab bars, n) gyo board walls, ceiling, new flooring, lighting, power plan, & sinks. install n)power door operator | $128,000 | |
| Aug 7, 2024 | Completed final sign-off Sep 2024 | 299 West Portal Av | Olive Construction Corp | soft demo (after nail salon leave) north-east portion of the building. non-structural, per ab-017. future t.i. under separate permitDetails
soft demo (after nail salon leave) north-east portion of the building. non-structural, per ab-017. future t.i. under separate permit | $3,000 |
| May 3, 2024 | Completed final sign-off Jun 2024 | 1928 Jackson St | Capomastro Group:Acalifornia Corp. | to comply w/ nov 202422015. remove floor hatch & patiton wall, replacing (e) rat slab, placing near non load bearing partition. no foundation work provde 2" concrete rat slab to existing crawl space.Details
to comply w/ nov 202422015. remove floor hatch & patiton wall, replacing (e) rat slab, placing near non load bearing partition. no foundation work provde 2" concrete rat slab to existing crawl space. | $5 |
| Nov 30, 2023 | Completed final sign-off Jan 2024 | 207 Skyline Bl | replace fixtures & finishes @ existing locker room. no structural work @mens locker only.Details
replace fixtures & finishes @ existing locker room. no structural work @mens locker only. | $158,000 | |
| Aug 30, 2022 | Completed final sign-off Aug 2023 | 207 Skyline Bl | Michael O'shaughnessy Construction Inc | project is to create an accessible site path on the owner/leasee's property. new street parking dedicated to the path will be completed under a separate department of public works permit following completion of the accessible site pathDetails
project is to create an accessible site path on the owner/leasee's property. new street parking dedicated to the path will be completed under a separate department of public works permit following completion of the accessible site path | $200,000 |
| Dec 28, 2021 | Never finaled filed Dec 2021, never issued | 417 Laguna St | replace rear egress stair. all work to be in-kind. replace wood for wood.Details
replace rear egress stair. all work to be in-kind. replace wood for wood. | $8,000 | |
| Dec 28, 2021 | Completed final sign-off Jan 2023 | 417 Laguna St | Capomastro Group:Acalifornia Corp. | restore existing double hung historic wood windows. 7 total.Details
restore existing double hung historic wood windows. 7 total. | $5,000 |
| Nov 16, 2020 | Completed final sign-off Sep 2021 | 177 Post St | Olive Construction Corp | 3rd & 8th fl: voluntary barrier removal. create 2 unisex restrooms on each floor. total of 4 restrooms.Details
3rd & 8th fl: voluntary barrier removal. create 2 unisex restrooms on each floor. total of 4 restrooms. | $40,000 |
| Oct 31, 2020 | Completed final sign-off Jul 2021 | 4080 26th St | to comply with nov# 200915221. install new skylight & replace dry-rotted window in-kind. all not visible from street.Details
to comply with nov# 200915221. install new skylight & replace dry-rotted window in-kind. all not visible from street. | $7,000 | |
| Oct 20, 2020 | Completed final sign-off Jun 2021 | 722 32nd Av | Olive Construction Corp | remodel bathroom to create 2 bathrooms on 2/f. amend to pa202009023234.Details
remodel bathroom to create 2 bathrooms on 2/f. amend to pa202009023234. | $50,000 |
| Dec 23, 2019 | Expired or cancelled expired May 2025 | 60 Maiden Ln | Olive Construction Corp | work to comply with sfdbi accessibile entrance program: replace 30" (x2 pair) doors with (1) one 42" wide door. add power door assist operator. (accessible business entrance program per ordinance 51-16.)Details
work to comply with sfdbi accessibile entrance program: replace 30" (x2 pair) doors with (1) one 42" wide door. add power door assist operator. (accessible business entrance program per ordinance 51-16.) | $10,000 |
| Dec 4, 2019 | Completed final sign-off Mar 2020 | 207 Skyline Bl | Trainor Commercial Construction Inc. | remodel (e) women's locker room, fixture & finishes only. no structuralDetails
remodel (e) women's locker room, fixture & finishes only. no structural | $150,000 |
| Sep 23, 2019 | Completed final sign-off Jan 2020 | 718 32nd Av | Olive Construction Corp | remodel (e) bathroom to create 2 bathrooms @ 2nd floor of existing resident. all work interiorDetails
remodel (e) bathroom to create 2 bathrooms @ 2nd floor of existing resident. all work interior | $25,000 |
| May 15, 2019 | Never finaled issued May 2019, no final | 1738 Lombard St | Olive Construction Corp | new ti - add sink alcove, new lighting & plumbing.Details
new ti - add sink alcove, new lighting & plumbing. | $15,000 |
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 177 Post St | Olive Construction Corp | to comply with the accessible business entrance program (abe ordinace 51-16). main building lobby, add power door operator. new opener at (e) door, 1 inside 1 outside button at (e) wallsDetails
to comply with the accessible business entrance program (abe ordinace 51-16). main building lobby, add power door operator. new opener at (e) door, 1 inside 1 outside button at (e) walls | $5,000 |
| Jul 11, 2018 | Completed final sign-off Oct 2018 | 177 Post St | Olive Construction Corp | 2nd fl: new tenant improvements: non-brearing partitions; (2) new restrooms; new flooring & paint; new lighting & power; fire sprinklers. no hvac - ducts and equipment to remain. relocate registers. maher n/a.Details
2nd fl: new tenant improvements: non-brearing partitions; (2) new restrooms; new flooring & paint; new lighting & power; fire sprinklers. no hvac - ducts and equipment to remain. relocate registers. maher n/a. | $180,000 |
| Nov 20, 2017 | Completed final sign-off Aug 2018 | 153 Clifford Tr | Hakewill Construction Co. Inc. | remodel kitchen & baths. extend floor arer into bld access (this floor only) <20 sqft. demo (1) 1.2 bath & (1) water closet. build (2) new full baths incld (1) shower, (1) tub/shower, new sinks, new toilets. new kitchen cabinets, relocate appliances. demo walls @ kitchenDetails
remodel kitchen & baths. extend floor arer into bld access (this floor only) <20 sqft. demo (1) 1.2 bath & (1) water closet. build (2) new full baths incld (1) shower, (1) tub/shower, new sinks, new toilets. new kitchen cabinets, relocate appliances. demo walls @ kitchen | $100,000 |
| Oct 3, 2017 | Completed final sign-off Mar 2018 | 520 Washington St | Trainor Commercial Construction Inc. | ti - no exterior work. new hair salon including new walls, flooring, ceiling furring, cabinets, styling stations, shampoo stations, lighting & plumbing to new sinks. hvac to remain. maher naDetails
ti - no exterior work. new hair salon including new walls, flooring, ceiling furring, cabinets, styling stations, shampoo stations, lighting & plumbing to new sinks. hvac to remain. maher na | $45,000 |
| Sep 18, 2017 | Expired or cancelled cancelled Jan 2026 | 240 Gold Mine Dr | remodel kitchen & bath. replace kitchen cabinets, finishes & appliances. remove walls at dining rm. remodel bath at ground level. remove exterior rear deck. replace bath fixtures at upper level. repair dryrot.Details
remodel kitchen & bath. replace kitchen cabinets, finishes & appliances. remove walls at dining rm. remodel bath at ground level. remove exterior rear deck. replace bath fixtures at upper level. repair dryrot. | $25,000 | |
| Jul 12, 2017 | Expired or cancelled cancelled Nov 2017 | 163 Liberty St | Hakewill Construction Co. Inc. | rear bldg - remodel s.f.d. - replace existing entry door & select exterior windows. remove (e) exterior stair & provide new interior stair. structural improvement. n/a maher ordinanceDetails
rear bldg - remodel s.f.d. - replace existing entry door & select exterior windows. remove (e) exterior stair & provide new interior stair. structural improvement. n/a maher ordinance | $50,000 |
| Jul 12, 2017 | Expired or cancelled cancelled Jan 2026 | 207 Skyline Bl | exercise room remodel: new steel frame for equipment, wall mirrors, ballet barre, replace lights w/led lights, new shelves.Details
exercise room remodel: new steel frame for equipment, wall mirrors, ballet barre, replace lights w/led lights, new shelves. | $10,000 | |
| Jun 9, 2017 | Completed final sign-off Nov 2017 | 9 Redfield Al | O'shaughnessy Construction | remodel extg permitted roof deck without change to configuration or floor area. repair in kind.Details
remodel extg permitted roof deck without change to configuration or floor area. repair in kind. | $10,000 |
| Apr 19, 2017 | Completed final sign-off May 2018 | 1766 Greenwich St | Capomastro Group:Acalifornia Corp. | revision to 201607071791. add new parapet walls, enlarge roof deck after reroofing (ref 201607192710) add rated walls at east proerty line wall (dryrot 201702229825) to comply with 201765636Details
revision to 201607071791. add new parapet walls, enlarge roof deck after reroofing (ref 201607192710) add rated walls at east proerty line wall (dryrot 201702229825) to comply with 201765636 | $15,000 |
| Dec 20, 2016 | Completed final sign-off May 2018 | 1766 Greenwich St | add new structural beam at wall/amend scope of work approved permit app#201607071791Details
add new structural beam at wall/amend scope of work approved permit app#201607071791 | $500 | |
| Jul 7, 2016 | Completed final sign-off May 2018 | 1766 Greenwich St | Capomastro Group:Acalifornia Corp. | remove interior walls, doors at 3rd fl, install new direct vent fireplace. new blind door at storage behind new fireplace. remove ex stair at rear yard. enclose existing stair top landing including 1 hr walls and 20 min doorDetails
remove interior walls, doors at 3rd fl, install new direct vent fireplace. new blind door at storage behind new fireplace. remove ex stair at rear yard. enclose existing stair top landing including 1 hr walls and 20 min door | $100,000 |
| Feb 29, 2016 | Completed final sign-off Dec 2016 | 1960 Jones St | Capomastro Group:Acalifornia Corp. | rev. to pa#201404012176 s-2, change roofing material from wood shingle to asphalt shingle to match existing. add roof hatch skylight at previously approved roof deck.Details
rev. to pa#201404012176 s-2, change roofing material from wood shingle to asphalt shingle to match existing. add roof hatch skylight at previously approved roof deck. | |
| Jul 2, 2015 | Completed final sign-off Dec 2016 | 1960 Jones St | Capomastro Group:Acalifornia Corp. | revision to pa#201404012176 convert master bedroom to family room.Details
revision to pa#201404012176 convert master bedroom to family room. | |
| Dec 8, 2014 | Completed final sign-off Mar 2015 | 207 Skyline Bl | P 3 Construction & Remodeling Inc | barrier removal. add accessible unisex changing room for disabled with opposite sex caregivers.Details
barrier removal. add accessible unisex changing room for disabled with opposite sex caregivers. | $35,000 |
| Jul 17, 2014 | Completed final sign-off Dec 2014 | 207 Skyline Bl | Jkl Construction Services Inc. | reroofingDetails
reroofing | $1,040,000 |
| Jan 31, 2014 | Completed final sign-off Sep 2014 | 4610 Mission St | Triton Tower Inc | replace 6 panel antennas with 6 new panel antennas on existing mountsDetails
replace 6 panel antennas with 6 new panel antennas on existing mounts | $90,000 |
| Jan 31, 2014 | Expired or cancelled cancelled Jul 2016 | 1540 Market St | replace 3 existing panel antennas with 3 new panel antennas and add 3 panel antennas 6 total (compliance with maher ordinance - extended ordinance no.155-13 not required.)Details
replace 3 existing panel antennas with 3 new panel antennas and add 3 panel antennas 6 total (compliance with maher ordinance - extended ordinance no.155-13 not required.) | $60,000 | |
| Jan 31, 2014 | Completed final sign-off Dec 2014 | 965 Sutter St | Jfc Construction Inc. | replace 6 panel antennas with 6 new panel antennas (metropcs/tmobile)Details
replace 6 panel antennas with 6 new panel antennas (metropcs/tmobile) | $70,000 |
| Jan 16, 2013 | Expired or cancelled cancelled Apr 2017 | 5024 03rd St | to comply w/ his nov 200845951 dated 2/22/2008. modification to existing wireless facility consisting of the addition of 2 microwave dishes and 1 tmr equipment cabinet.Details
to comply w/ his nov 200845951 dated 2/22/2008. modification to existing wireless facility consisting of the addition of 2 microwave dishes and 1 tmr equipment cabinet. | $9,000 | |
| Nov 27, 2012 | Expired or cancelled cancelled Jan 2026 | 1100 Oak St | modification to an existing wireless facility consisting of the addition of one 1" microwave dish.Details
modification to an existing wireless facility consisting of the addition of one 1" microwave dish. | $2,500 | |
| Nov 26, 2012 | Expired or cancelled cancelled Mar 2020 | 2325 03rd St | modification to an (e) wireless facility consisting of the addition of one (1) 1' microwave dish & one (1) 2' microwave dish.Details
modification to an (e) wireless facility consisting of the addition of one (1) 1' microwave dish & one (1) 2' microwave dish. | $1,500 | |
| Nov 16, 2012 | Expired or cancelled cancelled Jun 2016 | 401 Valencia St | modification to an (e) wireless facility consisting of the addition of three 1' microwave dishes & one 1 new equipment cabinet.Details
modification to an (e) wireless facility consisting of the addition of three 1' microwave dishes & one 1 new equipment cabinet. | $15,000 | |
| Nov 7, 2012 | Expired or cancelled cancelled Jul 2016 | 965 Mission St | replace (6) existing single port antennas w/ (4) new dual port antennas & (1) new quad port antenna. install (4) new microwave dish antennas, coax transmission lines from existing equipment cabinets to new antennas. all other metro pcs equipment to be main.Details
replace (6) existing single port antennas w/ (4) new dual port antennas & (1) new quad port antenna. install (4) new microwave dish antennas, coax transmission lines from existing equipment cabinets to new antennas. all other metro pcs equipment to be main. | $10,000 | |
| Oct 30, 2012 | Expired or cancelled cancelled Jun 2016 | 450 Harrison St | modification to an existing wireless facility consisting of one (1) 2' microwave dish.Details
modification to an existing wireless facility consisting of one (1) 2' microwave dish. | $4,000 | |
| Oct 30, 2012 | Expired or cancelled cancelled Mar 2020 | 965 Geneva Av | modification to an existing wireless facility consisting of the addition of two (2) 1' microwave dishes and the replacement of one (1) equipment cabinet for one (1) new equipment cabinet.Details
modification to an existing wireless facility consisting of the addition of two (2) 1' microwave dishes and the replacement of one (1) equipment cabinet for one (1) new equipment cabinet. | $3,500 | |
| Oct 29, 2012 | Expired or cancelled cancelled Mar 2020 | 4610 Mission St | modification to a wireless facility consisting of the addition of one (1) 1 foot microwave dish.Details
modification to a wireless facility consisting of the addition of one (1) 1 foot microwave dish. | $2,000 | |
| Oct 10, 2012 | Expired or cancelled cancelled Apr 2015 | 375 Alabama St | modification to an (e) wireless facility consisting of the addition of (3) 1' microwave dishes.Details
modification to an (e) wireless facility consisting of the addition of (3) 1' microwave dishes. | $7,000 | |
| Oct 4, 2012 | Expired or cancelled cancelled Mar 2020 | 3001 Mission St | modification to an (e) wireless facility consisting of the addition of (1) 1' microwave dish.Details
modification to an (e) wireless facility consisting of the addition of (1) 1' microwave dish. | $3,500 | |
| Oct 3, 2012 | Expired or cancelled cancelled Mar 2020 | 5630 Mission St | modification to an (e) wireless facility consisting of the addition of (1) 1'microwave dish & (1) 2' microwave dish.Details
modification to an (e) wireless facility consisting of the addition of (1) 1'microwave dish & (1) 2' microwave dish. | $3,000 | |
| Oct 3, 2012 | Expired or cancelled withdrawn Feb 2019 | 550 15th St | modification to an (e) wireless facility consisting of the addition of (1) 1'microwave dish & replacement of equipment cabinet for (1) new equipment cabinet.Details
modification to an (e) wireless facility consisting of the addition of (1) 1'microwave dish & replacement of equipment cabinet for (1) new equipment cabinet. | $2,500 | |
| Oct 2, 2012 | Expired or cancelled cancelled Jun 2016 | 2601 Mission St | modification to an (e) wireless facility consisting of an addition of (4) 1' microwave dishes & (2) 2' microwave dishes.Details
modification to an (e) wireless facility consisting of an addition of (4) 1' microwave dishes & (2) 2' microwave dishes. | $12,000 | |
| Oct 2, 2012 | Expired or cancelled cancelled Mar 2020 | 900 Palou Av | Details
| $5,000 | |
| Oct 1, 2012 | Expired or cancelled cancelled Mar 2020 | 1701 Jerrold Av | modification to an (e) wireless facility consisting of the addition of (1) 1' microwave dish.Details
modification to an (e) wireless facility consisting of the addition of (1) 1' microwave dish. | $2,500 | |
| Sep 17, 2012 | Expired or cancelled cancelled Mar 2020 | 185 Berry St | modification of an (e) wireless facility consisting of (2) 2' microwave dishes & coaxil transmission lines from (e) equipment cabinets to (n) microwave dishes.Details
modification of an (e) wireless facility consisting of (2) 2' microwave dishes & coaxil transmission lines from (e) equipment cabinets to (n) microwave dishes. | $9,500 | |
| Oct 19, 2011 | Expired or cancelled expired Jan 2017 | 888 Innes Av | Park Place Contractors | modification of telecommunictions facility: install (1) mod cell transaever station, bts cabinets on concrete slab at grade & remove (2) micro antennas within (e) simulated roof vent & replace w/ (3) (n) 40.6" height panel antennas.Details
modification of telecommunictions facility: install (1) mod cell transaever station, bts cabinets on concrete slab at grade & remove (2) micro antennas within (e) simulated roof vent & replace w/ (3) (n) 40.6" height panel antennas. | $6,000 |
| Aug 24, 2011 | Expired or cancelled cancelled Jul 2016 | 965 Mission St | wireless facility modification: replace 3 existing antennas with 6 new antennas. all other metro pcs equipment to remain.Details
wireless facility modification: replace 3 existing antennas with 6 new antennas. all other metro pcs equipment to remain. | $5,000 | |
| Dec 9, 2010 | Completed final sign-off Sep 2011 | 478 36th Av | Fagan Construction & Woodworking | new deck at rear, remodel interior: change mudroom to bathroom.Details
new deck at rear, remodel interior: change mudroom to bathroom. | $25,000 |