Block 0310, lot 019
60 Maiden Ln
- City’s use
- Commercial Office
- Built
- 1908
- Stories
- 10
- Units
- 4
- Rooms
- 21 bathrooms
- Building
- 59,786 sq ft
- Lot
- 6,490 sq ft
- Zoning
- C3R
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
97 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2025 | In progress issued May 2025 | 60 Maiden Ln | Olive Construction Corp | cleaning/repair facade. plants growing on building and destroying exterior facade. remove plants. patch the broken cement using high strengh cement patch. total working area 10 sq ft.Details
cleaning/repair facade. plants growing on building and destroying exterior facade. remove plants. patch the broken cement using high strengh cement patch. total working area 10 sq ft. | $21,000 |
| May 21, 2025 | In progress issued May 2025 | 177 Post St | Olive Construction Corp | cleaning/repair, re-paint facade. loose paint falling - cracks to repair in facade. will remove loose paint, patch, prime and paint. same color bm swiss coffee. total working asrea 10-15 sq ft.Details
cleaning/repair, re-paint facade. loose paint falling - cracks to repair in facade. will remove loose paint, patch, prime and paint. same color bm swiss coffee. total working asrea 10-15 sq ft. | $24,000 |
| May 9, 2025 | Completed final sign-off May 2025 | 60 Maiden Ln | Olive Construction Corp | revision to pa# 202501218728, door size change (interior)Details
revision to pa# 202501218728, door size change (interior) | |
| Jan 21, 2025 | Completed final sign-off May 2025 | 60 Maiden Ln | Olive Construction Corp | commmencement of work not started under previously approved permit pa# 201912230357. (work to comply with sfdbi accessibile entrance program: replace 30" (x2 pair) doors with (1) one 42" wide door. add power door assist operator. (accessible business entrance program per ordinance 51-16.)Details
commmencement of work not started under previously approved permit pa# 201912230357. (work to comply with sfdbi accessibile entrance program: replace 30" (x2 pair) doors with (1) one 42" wide door. add power door assist operator. (accessible business entrance program per ordinance 51-16.) | $10,000 |
| Dec 19, 2024 | Expired or cancelled cancelled Jan 2025 | 60 Maiden Ln | Olive Construction Corp | commencement of work not started under previously approved permit. pa #201912230357.Details
commencement of work not started under previously approved permit. pa #201912230357. | $10,000 |
| Jun 3, 2021 | Completed final sign-off Sep 2021 | 177 Post St | Johnson Controls Security Solutions Llc | remodel existing fire alarm at "restrooms" on 3rd and 8th floor. add (1) new horn/strobe, (2) smoke detectors, 3rd and 8th floorsDetails
remodel existing fire alarm at "restrooms" on 3rd and 8th floor. add (1) new horn/strobe, (2) smoke detectors, 3rd and 8th floors | $1,500 |
| Jun 3, 2021 | Completed final sign-off Mar 2022 | 177 Post St | Johnson Controls Security Solutions Llc | like for like alarm panel replacement, adding 5 new smoke detectors, as-builts for battery calcs and voltage drop required. ref pa #201906102999Details
like for like alarm panel replacement, adding 5 new smoke detectors, as-builts for battery calcs and voltage drop required. ref pa #201906102999 | $1,500 |
| Apr 22, 2021 | Expired or cancelled cancelled Jul 2023 | 177 Post St | Johnson Controls Inc. | as-builts for 2019-0610-2999Details
as-builts for 2019-0610-2999 | |
| Nov 16, 2020 | Completed final sign-off Sep 2021 | 177 Post St | Olive Construction Corp | 3rd & 8th fl: voluntary barrier removal. create 2 unisex restrooms on each floor. total of 4 restrooms.Details
3rd & 8th fl: voluntary barrier removal. create 2 unisex restrooms on each floor. total of 4 restrooms. | $40,000 |
| Feb 7, 2020 | Never finaled issued Feb 2020, no final | 177 Post St | street spaceDetails
street space | ||
| Dec 23, 2019 | Expired or cancelled expired May 2025 | 60 Maiden Ln | Olive Construction Corp | work to comply with sfdbi accessibile entrance program: replace 30" (x2 pair) doors with (1) one 42" wide door. add power door assist operator. (accessible business entrance program per ordinance 51-16.)Details
work to comply with sfdbi accessibile entrance program: replace 30" (x2 pair) doors with (1) one 42" wide door. add power door assist operator. (accessible business entrance program per ordinance 51-16.) | $10,000 |
| Dec 2, 2019 | Expired or cancelled cancelled Jan 2026 | 175 Post St | replace banner sign max maraDetails
replace banner sign max mara | $500 | |
| Dec 2, 2019 | Expired or cancelled cancelled Jan 2026 | 175 Post St | 2 new signs max maraDetails
2 new signs max mara | $6,675 | |
| Dec 2, 2019 | Never finaled filed Dec 2019, never issued | 175 Post St | reclad existing window and woor franes with brushed brass cladding in kind. replace e door handles with new brushed brass handles in kind. replace e opal glass fascia with new opal glass fasciaDetails
reclad existing window and woor franes with brushed brass cladding in kind. replace e door handles with new brushed brass handles in kind. replace e opal glass fascia with new opal glass fascia | $15,750 | |
| Aug 20, 2019 | Never finaled issued Aug 2019, no final | 177 Post St | street spaceDetails
street space | ||
| Jul 19, 2019 | Never finaled issued Jul 2019, no final | 177 Post St | street spaceDetails
street space | ||
| Jun 21, 2019 | Never finaled issued Jun 2019, no final | 177 Post St | street spaceDetails
street space | ||
| Jun 10, 2019 | Never finaled issued Jun 2019, no final | 177 Post St | Johnson Controls Inc. | main lobby: emergency fire alarm panel replcement, (e) panel flooded ue to hvac failure on floor above. new panle to be a simplex 44100es,(e) 2-wire idc's to be connected, replace eolr's as need. (e) devices are compatibility list, will remain as-is and untouched. maher n/a.Details
main lobby: emergency fire alarm panel replcement, (e) panel flooded ue to hvac failure on floor above. new panle to be a simplex 44100es,(e) 2-wire idc's to be connected, replace eolr's as need. (e) devices are compatibility list, will remain as-is and untouched. maher n/a. | $25,358 |
| Apr 10, 2019 | Completed final sign-off Apr 2019 | 177 Post St | Johnson Controls Inc. | 9th fl.: a new smoke detector to be added for panel protection at mech room, to be connected to (e) fl. zone 9, , 4 new horn/strobes and 2 new strobe - only to be connected to (e) remote paver supply, ref pa 201901281381 & e20190410469 & ew201903149384Details
9th fl.: a new smoke detector to be added for panel protection at mech room, to be connected to (e) fl. zone 9, , 4 new horn/strobes and 2 new strobe - only to be connected to (e) remote paver supply, ref pa 201901281381 & e20190410469 & ew201903149384 | $22,883 |
| Mar 13, 2019 | Completed final sign-off Mar 2019 | 177 Post St | Pribuss Engineering Inc | fire sprinklers suite 920- add 11 headsDetails
fire sprinklers suite 920- add 11 heads | $5,654 |
| Mar 11, 2019 | Never finaled issued Mar 2019, no final | 177 Post St | Olive Construction Corp | ste#920 revision to (e) permit 201901281381 - correct da checklist remove hardshipDetails
ste#920 revision to (e) permit 201901281381 - correct da checklist remove hardship | |
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 177 Post St | Olive Construction Corp | to comply with the accessible business entrance program (abe ordinace 51-16). main building lobby, add power door operator. new opener at (e) door, 1 inside 1 outside button at (e) wallsDetails
to comply with the accessible business entrance program (abe ordinace 51-16). main building lobby, add power door operator. new opener at (e) door, 1 inside 1 outside button at (e) walls | $5,000 |
| Jan 28, 2019 | Completed final sign-off May 2019 | 177 Post St | Olive Construction Corp | 9/f: new tenant improvement for office space. suite 920. maher n/a.Details
9/f: new tenant improvement for office space. suite 920. maher n/a. | $100,000 |
| Oct 10, 2018 | Completed final sign-off Oct 2018 | 177 Post St | Johnson Controls Inc. | revision pa 2018-0918-0580. added 1 relay to release door holds and added 1 smoke detector for freight elevatorDetails
revision pa 2018-0918-0580. added 1 relay to release door holds and added 1 smoke detector for freight elevator | $4,000 |
| Sep 18, 2018 | Completed final sign-off Oct 2018 | 177 Post St | Johnson Controls Inc. | 2nd fl: installing a new power supply and smoke detector and adding them to the existing system. installing 6 new horn strove and 10 strobes and adding them to the newly installed power supply panel. reason for fa ti due to interior remodel update, ref #201807114235.Details
2nd fl: installing a new power supply and smoke detector and adding them to the existing system. installing 6 new horn strove and 10 strobes and adding them to the newly installed power supply panel. reason for fa ti due to interior remodel update, ref #201807114235. | $17,645 |
| Jul 26, 2018 | Completed final sign-off Oct 2018 | 177 Post St | Pribuss Engineering Inc | 2nd flr - fire sprinklers ti - install new fire sprinkler system with new floor control assembly, new point of connection to be at (e) riser total sprinklers 48- this scope of work makes building fully sprinkler protected per contractor- need documents stating it is fully sprinklered.Details
2nd flr - fire sprinklers ti - install new fire sprinkler system with new floor control assembly, new point of connection to be at (e) riser total sprinklers 48- this scope of work makes building fully sprinkler protected per contractor- need documents stating it is fully sprinklered. | $24,672 |
| Jul 11, 2018 | Completed final sign-off Oct 2018 | 177 Post St | Olive Construction Corp | 2nd fl: new tenant improvements: non-brearing partitions; (2) new restrooms; new flooring & paint; new lighting & power; fire sprinklers. no hvac - ducts and equipment to remain. relocate registers. maher n/a.Details
2nd fl: new tenant improvements: non-brearing partitions; (2) new restrooms; new flooring & paint; new lighting & power; fire sprinklers. no hvac - ducts and equipment to remain. relocate registers. maher n/a. | $180,000 |
| Jul 11, 2018 | Completed final sign-off Oct 2018 | 177 Post St | Western Allied Mechanical Inc. | 2nd flr ti - replace (e) system (water cooled) ac unit with new add new vav pneumatic vav boxes and reconfigure (e) ductwork for new layout. fire alarm under separate permit.Details
2nd flr ti - replace (e) system (water cooled) ac unit with new add new vav pneumatic vav boxes and reconfigure (e) ductwork for new layout. fire alarm under separate permit. | $139,000 |
| Mar 5, 2018 | Completed final sign-off May 2019 | 177 Post St | Olive Construction Corp | 2nd flr - demo of (e) ti to create vacant space for future ti under sep permit by others. no structural work - per ab-017Details
2nd flr - demo of (e) ti to create vacant space for future ti under sep permit by others. no structural work - per ab-017 | $3,000 |
| Feb 14, 2018 | Completed final sign-off Mar 2018 | 177 Post St | Olive Construction Corp | to comply with nov #201840361 (bid) partition wall and door installation inside the office.Details
to comply with nov #201840361 (bid) partition wall and door installation inside the office. | $15,000 |
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 177 Post St | Golden Gate Glass And Mirror Co Inc | 9th fl: suite #900 - replace (e) 45 min fire rated door and frame with new 45 min fire rated metal door frame with firelite nt glazing.Details
9th fl: suite #900 - replace (e) 45 min fire rated door and frame with new 45 min fire rated metal door frame with firelite nt glazing. | $15,000 |
| Jun 10, 2016 | Completed final sign-off Sep 2016 | 177 Post St | Western Allied Mechanical Inc. | replace existing cooling tower with new tower of same capacity, install new structural support for cooling tower.Details
replace existing cooling tower with new tower of same capacity, install new structural support for cooling tower. | $75,000 |
| Apr 13, 2016 | Never finaled issued Apr 2016, no final | 177 Post St | street space permitDetails
street space permit | ||
| Nov 21, 2013 | Completed final sign-off Dec 2013 | 177 Post St | Pribuss Engineering Inc | 6th floor:fire sprinkler t.i. relocate 2 sprinkler heads, add 4 sprinkler heads. total 6x514.62=3088. t.i. app#201310240158Details
6th floor:fire sprinkler t.i. relocate 2 sprinkler heads, add 4 sprinkler heads. total 6x514.62=3088. t.i. app#201310240158 | $3,088 |
| Nov 7, 2013 | Completed final sign-off Dec 2013 | 177 Post St | Johnson Controls Inc. | suite 650: add 2 hornstrobes and 2 strobes to remodel. fire alarm and electrical. t.i. app#201310240158Details
suite 650: add 2 hornstrobes and 2 strobes to remodel. fire alarm and electrical. t.i. app#201310240158 | $6,000 |
| Oct 31, 2013 | Completed final sign-off Nov 2013 | 177 Post St | Johnson Controls Inc. | fire alarm: add 2 new strobes to remodeled restrooms, 1 hornstrobe, 1 strobe to existing corridor, 2 strobes, 1 horn strobe to remodeled suite 550. t.i. #2013.0913.6800Details
fire alarm: add 2 new strobes to remodeled restrooms, 1 hornstrobe, 1 strobe to existing corridor, 2 strobes, 1 horn strobe to remodeled suite 550. t.i. #2013.0913.6800 | $8,000 |
| Oct 24, 2013 | Completed final sign-off Dec 2013 | 177 Post St | Olive Construction Corp | #650- interior tenant improvement includes new non bearing partition, mechanical & electrical under seperate permit.Details
#650- interior tenant improvement includes new non bearing partition, mechanical & electrical under seperate permit. | $90,000 |
| Sep 13, 2013 | Completed final sign-off Feb 2014 | 177 Post St | Olive Construction Corp | 5th floor suite 550: interior t.i.: including constuction of new non-bearing partitions and new accessible men's restrooms and new women's restroom per ab-006- mep, fire alarm and sprinklers separate permitsDetails
5th floor suite 550: interior t.i.: including constuction of new non-bearing partitions and new accessible men's restrooms and new women's restroom per ab-006- mep, fire alarm and sprinklers separate permits | $125,000 |
| Aug 22, 2013 | Never finaled issued Aug 2013, no final | 177 Post St | Olive Construction Corp | demo existing oofice - remove all furniture, carpet and clean up.Details
demo existing oofice - remove all furniture, carpet and clean up. | $5,000 |
| Oct 27, 2011 | Never finaled issued Oct 2011, no final | 177 Post St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Aug 16, 2011 | Never finaled issued Aug 2011, no final | 177 Post St | street space permitDetails
street space permit | ||
| Jun 6, 2011 | Completed final sign-off Jul 2011 | 177 Post St | Pribuss Engineering Inc | add 17 sprinkler heads on the 7th floorDetails
add 17 sprinkler heads on the 7th floor | $8,738 |
| Sep 30, 2009 | Completed final sign-off Apr 2010 | 175 Post St | Zebra Awning Co Inc | erect a non-electric projecting doulbe faced non illuminated new signDetails
erect a non-electric projecting doulbe faced non illuminated new sign | $700 |
| May 11, 2009 | Completed final sign-off Jun 2009 | 177 Post St | Pribuss Engineering Inc | remove 4 fire sprinklers in basement elevator machine room, rpovide contractor's and owner's to district inspector at time of inspection.Details
remove 4 fire sprinklers in basement elevator machine room, rpovide contractor's and owner's to district inspector at time of inspection. | $1,000 |
| Apr 8, 2009 | Never finaled issued May 2009, no final | 177 Post St | Johnson Controls Inc. | add (1) smoke detector at grou nd floor elevator lobby & add (1) at basement elevator machine room.Details
add (1) smoke detector at grou nd floor elevator lobby & add (1) at basement elevator machine room. | $5,000 |
| Dec 1, 2008 | Never finaled issued Dec 2008, no final | 175 Post St | Development Support Services Inc | minor structural adjustments to entrance. revision to application 200807176972.Details
minor structural adjustments to entrance. revision to application 200807176972. | |
| Nov 5, 2008 | Never finaled issued Nov 2008, no final | 175 Post St | street space permitDetails
street space permit | ||
| Oct 23, 2008 | Never finaled issued Nov 2008, no final | 175 Post St | Development Support Services Inc | revision to app #200809222297 to a)fitting rooms relocated.b)door added by cash wrap. c)partition excludedDetails
revision to app #200809222297 to a)fitting rooms relocated.b)door added by cash wrap. c)partition excluded | |
| Oct 15, 2008 | Never finaled issued Oct 2008, no final | 177 Post St | street space only.Details
street space only. | ||
| Oct 15, 2008 | Never finaled issued Oct 2008, no final | 175 Post St | Pribuss Engineering Inc | fire sprinklers t.i. 72 new sprinklers.Details
fire sprinklers t.i. 72 new sprinklers. | $18,000 |
| Sep 29, 2008 | Never finaled issued Sep 2008, no final | 175 Post St | Johnson Controls Inc. | add 1 smoke detector, 1 pull station, 10 strobes, 5 horn strobesDetails
add 1 smoke detector, 1 pull station, 10 strobes, 5 horn strobes | $13,500 |
| Sep 22, 2008 | Never finaled issued Oct 2008, no final | 175 Post St | Development Support Services Inc | commercial t.i. - merging two existing separate retail spaces itno one, new lighting, new fitting room, new partition, new ceiling. drywall & finishes.Details
commercial t.i. - merging two existing separate retail spaces itno one, new lighting, new fitting room, new partition, new ceiling. drywall & finishes. | $110,000 |
| Sep 3, 2008 | Never finaled issued Sep 2008, no final | 175 Post St | Development Support Services Inc | interior demolition only of non structural walls. (soft demo) per ab-17 of vacant ground floor retail space. ti and storefront and accessibility on separate permitDetails
interior demolition only of non structural walls. (soft demo) per ab-17 of vacant ground floor retail space. ti and storefront and accessibility on separate permit | $120,000 |
| Aug 14, 2008 | Never finaled issued Aug 2008, no final | 177 Post St | Pribuss Engineering Inc | fire sprinkler t.i. at 3rd fl & 4th fl: 21 heads chang ovt, 100 added heads. total 119.Details
fire sprinkler t.i. at 3rd fl & 4th fl: 21 heads chang ovt, 100 added heads. total 119. | $28,000 |
| Jul 28, 2008 | Never finaled issued Jul 2008, no final | 177 Post St | Johnson Controls Inc. | 4th floor-add 1 smoke detector, 1 booster panel, 3 horn/strobe, 1 strobeDetails
4th floor-add 1 smoke detector, 1 booster panel, 3 horn/strobe, 1 strobe | $7,970 |
| Jul 28, 2008 | Never finaled issued Jul 2008, no final | 177 Post St | Johnson Controls Inc. | 3rd floor-add 1 smoke detector, 1 booster panel, 1 horn/strobe, 1 strobeDetails
3rd floor-add 1 smoke detector, 1 booster panel, 1 horn/strobe, 1 strobe | $6,890 |
| Jul 17, 2008 | Never finaled issued Nov 2008, no final | 175 Post St | Development Support Services Inc | this permit is for the construction of a storefront only. other ti work is under a seperate permit. 11/03/2008Details
this permit is for the construction of a storefront only. other ti work is under a seperate permit. 11/03/2008 | $350,000 |
| Apr 3, 2008 | Completed final sign-off Jul 2008 | 177 Post St | revision to pa# 2007/12/06/9859 to change dimising wall between space a and b on the 5th floor to 1hr fire rated.Details
revision to pa# 2007/12/06/9859 to change dimising wall between space a and b on the 5th floor to 1hr fire rated. | ||
| Apr 3, 2008 | Completed final sign-off Dec 2008 | 177 Post St | ti on the 3rd floor to remove and relocate partition walls in the conference room. sprinkler & mep. uner seperate permit.Details
ti on the 3rd floor to remove and relocate partition walls in the conference room. sprinkler & mep. uner seperate permit. | $5,000 | |
| Apr 3, 2008 | Completed final sign-off Dec 2008 | 177 Post St | ti on suite #400- to remove and reloacate partition walls in the new office space.new lights with switches & outlets. mep and sprinklers separate permit.Details
ti on suite #400- to remove and reloacate partition walls in the new office space.new lights with switches & outlets. mep and sprinklers separate permit. | $10,000 | |
| Mar 13, 2008 | Completed final sign-off Jul 2008 | 177 Post St | Pribuss Engineering Inc | ti for sprinkler system on the 5th floor in suite#550. add 20 sprinkler headsDetails
ti for sprinkler system on the 5th floor in suite#550. add 20 sprinkler heads | $5,000 |
| Mar 13, 2008 | Completed final sign-off Jul 2008 | 177 Post St | Pribuss Engineering Inc | ti for sprinkler system on the 5th floor in suite#500. add 30 sprinkler headsDetails
ti for sprinkler system on the 5th floor in suite#500. add 30 sprinkler heads | $7,500 |
| Mar 6, 2008 | Completed final sign-off Jul 2008 | 177 Post St | Johnson Controls Inc. | ti for fire alarm system on the 5th floor. add 3 smoke detectors, 1 booster panel, 3 horn/strobes and 2 strobes. at 5th fl.Details
ti for fire alarm system on the 5th floor. add 3 smoke detectors, 1 booster panel, 3 horn/strobes and 2 strobes. at 5th fl. | $7,300 |
| Feb 12, 2008 | Never finaled issued Feb 2008, no final | 177 Post St | suite 750: add 10" to each side of existing wall. maintain minimum exit width required. unit #750.Details
suite 750: add 10" to each side of existing wall. maintain minimum exit width required. unit #750. | $200 | |
| Dec 11, 2007 | Completed final sign-off Mar 2008 | 177 Post St | Pribuss Engineering Inc | fire sprinkler system on 6th floor. add 20 headsDetails
fire sprinkler system on 6th floor. add 20 heads | $4,750 |
| Dec 6, 2007 | Completed final sign-off Jul 2008 | 177 Post St | tenant improvement. new partition walls, new lights, switches and outlets, new sink ada upgrade to water fountain. elec., plumbing, fire sprinklers, mech. life safety under separate permit.Details
tenant improvement. new partition walls, new lights, switches and outlets, new sink ada upgrade to water fountain. elec., plumbing, fire sprinklers, mech. life safety under separate permit. | $25,000 | |
| Dec 5, 2007 | Completed final sign-off Mar 2008 | 177 Post St | Johnson Controls Inc. | add 3 smokes detectors 1 booster pannel, 2 horn.strobe, 2 strobe. on existing system.Details
add 3 smokes detectors 1 booster pannel, 2 horn.strobe, 2 strobe. on existing system. | $7,000 |
| Oct 3, 2007 | Completed final sign-off Mar 2008 | 177 Post St | #600- minor interior office remodel: relocation of partition walls, new light switches and outletsDetails
#600- minor interior office remodel: relocation of partition walls, new light switches and outlets | $15,000 | |
| May 26, 2005 | Never finaled issued May 2005, no final | 177 Post St | street spaceDetails
street space | ||
| May 17, 2005 | Expired or cancelled expired Mar 2007 | 175 Post St | erect: projecting, noniluminated new signDetails
erect: projecting, noniluminated new sign | ||
| Apr 22, 2005 | Never finaled issued Apr 2005, no final | 177 Post St | street spaceDetails
street space | ||
| Apr 22, 2005 | Expired or cancelled expired Jun 2007 | 177 Post St | upgrade doors at front entrane and restroos for access compliance. limited removal of petitions andDetails
upgrade doors at front entrane and restroos for access compliance. limited removal of petitions and | $42,000 | |
| Sep 10, 2004 | Completed final sign-off Sep 2004 | 177 Post St | Everest Waterproofing & Restoration Inc. | on rear elevation, maiden lane side, remove brick at south west corner and at 4 headers to inspectDetails
on rear elevation, maiden lane side, remove brick at south west corner and at 4 headers to inspect | $35,000 |
| Sep 9, 2004 | Never finaled issued Sep 2004, no final | 60 Maiden Ln | street spaceDetails
street space | ||
| Sep 9, 2004 | Completed final sign-off Jan 2005 | 60 Maiden Ln | E. J. Weber Elect.Co Inc | oti-4, 1st floor, ls. fire alarm upgradesDetails
oti-4, 1st floor, ls. fire alarm upgrades | $5,000 |
| Aug 5, 2004 | Completed final sign-off Jan 2005 | 60 Maiden Ln | Gci, Inc | electrical- reroute power to accomodate new space reconfiguration- 1st and 2nd floorDetails
electrical- reroute power to accomodate new space reconfiguration- 1st and 2nd floor | $8,000 |
| Jul 27, 2004 | Completed final sign-off Jan 2005 | 60 Maiden Ln | Gci, Inc | per oti 200404090973 (rev.) structural:additional blocking required to comply w/space reconfiguratioDetails
per oti 200404090973 (rev.) structural:additional blocking required to comply w/space reconfiguratio | $2,750 |
| Jul 21, 2004 | Completed final sign-off Jan 2005 | 60 Maiden Ln | Pribuss Engineering Inc | fire sprinkler t.i. @ g/fDetails
fire sprinkler t.i. @ g/f | $16,000 |
| Jun 9, 2004 | Never finaled issued Jun 2004, no final | 60 Maiden Ln | street space permit/scaffoldDetails
street space permit/scaffold | ||
| Apr 9, 2004 | Completed final sign-off Jan 2005 | 60 Maiden Ln | Gci, Inc | interio4 upgrade f exisitin retail space, increase in floor arear no plumbing llightiing/elec underDetails
interio4 upgrade f exisitin retail space, increase in floor arear no plumbing llightiing/elec under | $95,000 |
| Jul 22, 2002 | Completed final sign-off Sep 2002 | 177 Post St | oti-1 el 7th floorDetails
oti-1 el 7th floor | $11,000 | |
| Oct 11, 2001 | Expired or cancelled expired Feb 2002 | 177 Post St | oti-1 8/f el onlyDetails
oti-1 8/f el only | $5,000 | |
| Mar 28, 2001 | Completed final sign-off May 2001 | 177 Post St | fire alarm t/i 9th floorDetails
fire alarm t/i 9th floor | $8,000 | |
| Mar 21, 2001 | Completed final sign-off Apr 2001 | 60 Maiden Ln | install a cooling ac unit 2nd floor closet areaDetails
install a cooling ac unit 2nd floor closet area | $10,000 | |
| Mar 9, 2001 | Completed final sign-off May 2001 | 177 Post St | Pribuss Engineering Inc | firespkr's - new 9th floor base system w/caulationDetails
firespkr's - new 9th floor base system w/caulation | $14,500 |
| Mar 5, 2001 | Completed final sign-off Apr 2001 | 177 Post St | fire alarm work on 7th fl only, suite #750Details
fire alarm work on 7th fl only, suite #750 | $7,000 | |
| Feb 9, 2001 | Completed final sign-off May 2001 | 177 Post St | oti-1 9/f el me ls and spDetails
oti-1 9/f el me ls and sp | $15,000 | |
| Nov 27, 2000 | Expired or cancelled expired May 2001 | 177 Post St | street spaceDetails
street space | ||
| Oct 10, 2000 | Completed final sign-off Oct 2000 | 175 Post St | revision to appp 2000/06/12/2380 omit structural work for mezzanine walkway to stairDetails
revision to appp 2000/06/12/2380 omit structural work for mezzanine walkway to stair | ||
| Sep 28, 2000 | Completed final sign-off Oct 2000 | 175 Post St | fire alarm tenant improvement 1st floorDetails
fire alarm tenant improvement 1st floor | $14,000 | |
| Sep 15, 2000 | Completed final sign-off Apr 2001 | 177 Post St | Pribuss Engineering Inc | fire spkr t.1. 7th floor 177 post as 12660Details
fire spkr t.1. 7th floor 177 post as 12660 | $5,000 |
| Aug 2, 2000 | Completed final sign-off Apr 2001 | 177 Post St | demo of ceiling tiles & exist non load bearing walls on 7th floor facing maiden lane ste 750Details
demo of ceiling tiles & exist non load bearing walls on 7th floor facing maiden lane ste 750 | $10,000 | |
| Jun 21, 2000 | Completed final sign-off Sep 2000 | 175 Post St | interior demo non-structural 1st floor. revise 2000/06/12/2380.Details
interior demo non-structural 1st floor. revise 2000/06/12/2380. | $10,000 | |
| Jun 19, 2000 | Expired or cancelled expired Oct 2000 | 175 Post St | street spaceDetails
street space | ||
| Jun 12, 2000 | Completed final sign-off Oct 2000 | 175 Post St | @ 1st fl: new entry way move back to make landing levelDetails
@ 1st fl: new entry way move back to make landing level | $280,000 | |
| Mar 30, 2000 | Completed final sign-off Jul 2000 | 60 Maiden Ln | Pribuss Engineering Inc | fire sprinkler t. i., 6th floor, calcs, 6th floor, 177 post, asr 558Details
fire sprinkler t. i., 6th floor, calcs, 6th floor, 177 post, asr 558 | $5,000 |
| Jan 25, 2000 | Expired or cancelled expired Aug 2000 | 60 Maiden Ln | Wu Construction Co Inc | oti-1 16th floor el & l/sDetails
oti-1 16th floor el & l/s | $5,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.