Duncan Phillip Green
- Listed as
- engineer
- Firm
- Western Allied Mechanical Inc.
- On San Francisco permits
- Jun 2016 to Oct 2021
3 permits since 2000 (engineer on 3 permits): 3 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 25, 2021 | Completed final sign-off Apr 2023 | 221 Main St | Western Allied Mechanical Inc. | removal and replacement of the existing tenant cooling towers (2 ea), replacement of condenser water pumps (2 ea), and installation of a new filtration system (1 ea). install a total of (4 ea) vfd's; 2 for the cooling towers and 2 for the condernser water pumps.Details
removal and replacement of the existing tenant cooling towers (2 ea), replacement of condenser water pumps (2 ea), and installation of a new filtration system (1 ea). install a total of (4 ea) vfd's; 2 for the cooling towers and 2 for the condernser water pumps. | $409,600 |
| Jul 31, 2019 | Completed final sign-off Jan 2020 | 499 Illinois St | Western Allied Mechanical Inc. | 1st floor mech ductwork & vav box modification - ref 201907226515Details
1st floor mech ductwork & vav box modification - ref 201907226515 | $40,000 |
| Jun 10, 2016 | Completed final sign-off Sep 2016 | 177 Post St | Western Allied Mechanical Inc. | replace existing cooling tower with new tower of same capacity, install new structural support for cooling tower.Details
replace existing cooling tower with new tower of same capacity, install new structural support for cooling tower. | $75,000 |