Duncan Phillip Green
- License
- M37003
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M37003 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Western Allied Mechanical Inc.
- On San Francisco permits
- Jun 2016 to Oct 2021
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Western Allied Mechanical Inc. (3)
- Architects
- Scott E Clement
- Engineers
- Jahandar Yadegar
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 25, 2021 | Completed final sign-off Apr 2023 | 221 Main St | Western Allied Mechanical Inc. | removal and replacement of the existing tenant cooling towers (2 ea), replacement of condenser water pumps (2 ea), and installation of a new filtration system (1 ea). install a total of (4 ea) vfd's; 2 for the cooling towers and 2 for the condernser water pumps.Details
removal and replacement of the existing tenant cooling towers (2 ea), replacement of condenser water pumps (2 ea), and installation of a new filtration system (1 ea). install a total of (4 ea) vfd's; 2 for the cooling towers and 2 for the condernser water pumps. | $409,600 |
| Jul 31, 2019 | Completed final sign-off Jan 2020 | 499 Illinois St | Western Allied Mechanical Inc. | 1st floor mech ductwork & vav box modification - ref 201907226515Details
1st floor mech ductwork & vav box modification - ref 201907226515 | $40,000 |
| Jun 10, 2016 | Completed final sign-off Sep 2016 | 177 Post St | Western Allied Mechanical Inc. | replace existing cooling tower with new tower of same capacity, install new structural support for cooling tower.Details
replace existing cooling tower with new tower of same capacity, install new structural support for cooling tower. | $75,000 |