Concord Construction Inc
- Based in
- Beverly Hills
- On San Francisco permits
- Jun 2019 to Jun 2019
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2019 | Never finaled issued Oct 2019, no final | 166 Geary St | 14th and 15th flrs. install (n) partitions, gyp, ceiling. (n) millwork, countertops, fixtures. (n) finishes, paint, floor covers. install card readers at elevator lobby. install light fixtures, electr equip. install plumbing equip. fire alarm, sprinklers under separate permit. emerg resp def submit.Details
14th and 15th flrs. install (n) partitions, gyp, ceiling. (n) millwork, countertops, fixtures. (n) finishes, paint, floor covers. install card readers at elevator lobby. install light fixtures, electr equip. install plumbing equip. fire alarm, sprinklers under separate permit. emerg resp def submit. | $1,320,600 |
| Jun 5, 2019 | Never finaled issued Nov 2019, no final | 166 Geary St | installation of new partitions and gyp bd ceiling. new millwork, countertops fixtures, new finishes throughout, paint, floor dovering, installation of card readers at elev lobby. light fixt and other elec equip. instal plumb eqip.alarm,sprnklr sep permit, emergency responder comm system deffered subDetails
installation of new partitions and gyp bd ceiling. new millwork, countertops fixtures, new finishes throughout, paint, floor dovering, installation of card readers at elev lobby. light fixt and other elec equip. instal plumb eqip.alarm,sprnklr sep permit, emergency responder comm system deffered sub | $1,369,960 |