Block 3707, lot 002
28 02nd St
- City’s use
- Commercial Office
- Built
- 1914
- Stories
- 7
- Units
- 8
- Rooms
- 13 bathrooms
- Building
- 28,383 sq ft
- Lot
- 4,129 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
61 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2025 | Completed final sign-off Dec 2025 | 28 02nd St | Infinium Air Inc | ground floor: furnish and install mechanical equipments which consist of 2 outdoor heat pumps, 3 indoor fan coils, and 2 exhaust fans. all associated ductwork per plans. ref t.i permit 202505287421Details
ground floor: furnish and install mechanical equipments which consist of 2 outdoor heat pumps, 3 indoor fan coils, and 2 exhaust fans. all associated ductwork per plans. ref t.i permit 202505287421 | $30,000 |
| Sep 15, 2025 | In progress issued Sep 2025 | 28 02nd St | Aaa Restaurant Fire Control Llc | add/relocate (6) fire sprinklersDetails
add/relocate (6) fire sprinklers | $12,000 |
| Aug 28, 2025 | In progress issued Aug 2025 | 28 02nd St | San Francisco Fire Protection | ti due to ground floor renovation. add 3 ceiling horn strobes and 2 monitor modules to the existing fire alarm system. ref arch #202505287421 and ref fire pa #202404099598Details
ti due to ground floor renovation. add 3 ceiling horn strobes and 2 monitor modules to the existing fire alarm system. ref arch #202505287421 and ref fire pa #202404099598 | $3,800 |
| May 28, 2025 | Completed final sign-off Dec 2025 | 28 02nd St | Trainor Commercial Construction Inc. | 1st floor: installation of non structural partitions, and new finishes. this project is located on the ground floor. mep under seperate permit.Details
1st floor: installation of non structural partitions, and new finishes. this project is located on the ground floor. mep under seperate permit. | $160,000 |
| Jul 16, 2024 | Completed final sign-off Jan 2025 | 28 02nd St | Axel8 Construction | deferred mep for pa# 202312082195. no exterior workDetails
deferred mep for pa# 202312082195. no exterior work | $80,000 |
| Apr 9, 2024 | Completed final sign-off Dec 2024 | 28 02nd St | San Francisco Fire Protection | 2/f: fire alarm tenant improvement to (e) fire alarm system. install new rps, smoke detectors, relay modules, strobes, and horn strobes. ref pa# 202312082195 arch plans. pa# 202210184581 ti facu.Details
2/f: fire alarm tenant improvement to (e) fire alarm system. install new rps, smoke detectors, relay modules, strobes, and horn strobes. ref pa# 202312082195 arch plans. pa# 202210184581 ti facu. | $20,000 |
| Feb 22, 2024 | In progress issued Feb 2024 | 28 02nd St | All Systems Approved Inc | 2/f: tenant improvement to an (e) nfpa 13 fire sprinkler system due to new wall partitions. ref ti permit 202312082195Details
2/f: tenant improvement to an (e) nfpa 13 fire sprinkler system due to new wall partitions. ref ti permit 202312082195 | $8,900 |
| Dec 8, 2023 | Completed final sign-off Jan 2025 | 28 02nd St | Axel8 Construction | 2/f: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. mep and life safety under a separate permit.Details
2/f: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. mep and life safety under a separate permit. | $215,000 |
| Oct 31, 2023 | Completed final sign-off Nov 2023 | 28 02nd St | Trainor Commercial Construction Inc. | renew permit to obtain final inspection for bpa#201901150394, all work is complete.Details
renew permit to obtain final inspection for bpa#201901150394, all work is complete. | |
| Dec 12, 2022 | Completed final sign-off Dec 2022 | 28 02nd St | O'connor Plumbing & Fire Protection | tenant improvement for sprinkler system on 7th fl. ref app# 2022-0628-7255Details
tenant improvement for sprinkler system on 7th fl. ref app# 2022-0628-7255 | $6,000 |
| Oct 18, 2022 | Completed final sign-off May 2023 | 28 02nd St | San Francisco Fire Protection | add on to (e) fire system due to t.i. on 7th flr. install (n) power supply panel, smoke detector, notification devices & module for duet detector, (n) devices will be tie in to (e) control panel in the basement #2022-0628-7255.Details
add on to (e) fire system due to t.i. on 7th flr. install (n) power supply panel, smoke detector, notification devices & module for duet detector, (n) devices will be tie in to (e) control panel in the basement #2022-0628-7255. | $7,000 |
| Jul 22, 2022 | Completed final sign-off Sep 2022 | 28 02nd St | O'connor Plumbing & Fire Protection | provide tenant improvement for fire sprinkler system on 6th fl.Details
provide tenant improvement for fire sprinkler system on 6th fl. | $7,000 |
| Jul 22, 2022 | Completed final sign-off Sep 2022 | 28 02nd St | O'connor Plumbing & Fire Protection | provide tenant improvement for fire sprinkler system on 5th fl.Details
provide tenant improvement for fire sprinkler system on 5th fl. | $7,000 |
| Jul 12, 2022 | Completed final sign-off Sep 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 4/f: construction of sofit & interior demountable furniture installation. rev to 202102255364Details
4/f: construction of sofit & interior demountable furniture installation. rev to 202102255364 | $1,000 |
| Jun 28, 2022 | Completed final sign-off May 2023 | 28 02nd St | Trainor Commercial Construction Inc. | 7th fl: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork, finishes. sprinklers and fire alarm under separate permit.Details
7th fl: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork, finishes. sprinklers and fire alarm under separate permit. | $250,000 |
| Jun 28, 2022 | Completed final sign-off Nov 2023 | 28 02nd St | San Francisco Fire Protection | 5th and 6th floors: add on to existing fire system due to t.i. install notification devices fore complete coverage, and monitor modules to shut down duct detectors (installed by others). ref pa 202201035269 and 202202248632Details
5th and 6th floors: add on to existing fire system due to t.i. install notification devices fore complete coverage, and monitor modules to shut down duct detectors (installed by others). ref pa 202201035269 and 202202248632 | $12,000 |
| Feb 24, 2022 | Completed final sign-off Dec 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 6th floor: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. this project is located on 6th floor. suite #600. sprinkler and fire alarm system designs will be submitted under seperate permits.Details
6th floor: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. this project is located on 6th floor. suite #600. sprinkler and fire alarm system designs will be submitted under seperate permits. | $250,000 |
| Feb 9, 2022 | Completed final sign-off Mar 2022 | 28 02nd St | San Francisco Fire Protection | as built to pa# 202201055409. remove 2 relay modules for door access control from 6th & 7th fl. not installed.Details
as built to pa# 202201055409. remove 2 relay modules for door access control from 6th & 7th fl. not installed. | |
| Jan 5, 2022 | Completed final sign-off Mar 2022 | 28 02nd St | San Francisco Fire Protection | floors 2-7: add on to (e) fire system. install new relay modules that will be releasing door access control system (installed by others) on every floor except 1/f and tie-in to (e) panel in the basement. ref. permit 201910043592.Details
floors 2-7: add on to (e) fire system. install new relay modules that will be releasing door access control system (installed by others) on every floor except 1/f and tie-in to (e) panel in the basement. ref. permit 201910043592. | $2,500 |
| Jan 3, 2022 | Completed final sign-off Dec 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 5/f: construction of interior partition , act ceiling, lighting, plumbing fixtures, millwork, and finishes. this project is located on 5/f, ste 500. sprinkler and fire alarm system design will be submitted under sep permits.Details
5/f: construction of interior partition , act ceiling, lighting, plumbing fixtures, millwork, and finishes. this project is located on 5/f, ste 500. sprinkler and fire alarm system design will be submitted under sep permits. | $250,000 |
| Oct 20, 2021 | Completed final sign-off Jan 2022 | 28 02nd St | San Francisco Fire Protection | 4/f: as-builts to pa 202108045772. add 3 new ceiling mount strobes in the bathroom and monitor module to monitor new duct detector installed by others.Details
4/f: as-builts to pa 202108045772. add 3 new ceiling mount strobes in the bathroom and monitor module to monitor new duct detector installed by others. | $3,000 |
| Aug 4, 2021 | Completed final sign-off Jan 2022 | 28 02nd St | San Francisco Fire Protection | add on (e) fire alarm system due to t.i. on 4th fl in full sprinkler bldg. install notification devices thru out for complete coverage. tie-in to exist power supply on 3ed fl refer to pa #2021 0225 5364 & 2019 1004 3595.Details
add on (e) fire alarm system due to t.i. on 4th fl in full sprinkler bldg. install notification devices thru out for complete coverage. tie-in to exist power supply on 3ed fl refer to pa #2021 0225 5364 & 2019 1004 3595. | $2,800 |
| Jul 13, 2021 | Completed final sign-off Sep 2021 | 28 02nd St | O'connor Plumbing & Fire Protection | install fire sprinker system throughout building per nfpa 13 3rd dl done under sep permitDetails
install fire sprinker system throughout building per nfpa 13 3rd dl done under sep permit | $85,000 |
| Mar 24, 2021 | Completed final sign-off Jun 2021 | 28 02nd St | O'connor Plumbing & Fire Protection | install (32) new sprinklers on 3rd floor only for tenant imrpovement. reference # 2020-1224-1716Details
install (32) new sprinklers on 3rd floor only for tenant imrpovement. reference # 2020-1224-1716 | $10,000 |
| Mar 16, 2021 | Completed final sign-off Jul 2021 | 28 02nd St | San Francisco Fire Protection | add on to existing system due to t.i. on 3rd floor. install new power supply panel, smoke detector above & control module to activate stand alone power supply panel. install notification devices thru-out floor area. new devices will be tie-in to exst panel. #2020-1224-1716.Details
add on to existing system due to t.i. on 3rd floor. install new power supply panel, smoke detector above & control module to activate stand alone power supply panel. install notification devices thru-out floor area. new devices will be tie-in to exst panel. #2020-1224-1716. | $5,500 |
| Feb 25, 2021 | Completed final sign-off Dec 2022 | 28 02nd St | Trainor Commercial Construction Inc. | 4th fl: interior tenant improvement only including new partitions, doors, floorings, and ceilings.Details
4th fl: interior tenant improvement only including new partitions, doors, floorings, and ceilings. | $250,000 |
| Dec 24, 2020 | Completed final sign-off Oct 2024 | 28 02nd St | Trainor Commercial Construction Inc. | 3rd fl tenant improvements. m.e.p.. included. life safety under separate permit.Details
3rd fl tenant improvements. m.e.p.. included. life safety under separate permit. | $250,000 |
| Dec 4, 2019 | Never finaled issued Feb 2020, no final | 28 02nd St | Schmitt Heating Co Inc | this permit is for mechanical only. demo (e) vav ac system serving 2nd through 7th floor. provide (n) vrf ac system for 2nd through 7th fl. ref pa 2018-0907-9479Details
this permit is for mechanical only. demo (e) vav ac system serving 2nd through 7th floor. provide (n) vrf ac system for 2nd through 7th fl. ref pa 2018-0907-9479 | $150,000 |
| Nov 25, 2019 | Never finaled issued Nov 2019, no final | 28 02nd St | add 28a-02nd st to 28-02nd st, 3707/002.Details
add 28a-02nd st to 28-02nd st, 3707/002. | ||
| Nov 22, 2019 | Never finaled issued Nov 2019, no final | 28 02nd St | streetspaceDetails
streetspace | ||
| Nov 22, 2019 | Never finaled issued Nov 2019, no final | 28 02nd St | Narrowback Construction Co. | street spaceDetails
street space | |
| Nov 18, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 7th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.Details
7th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing. | $150,000 | |
| Nov 18, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 6th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.Details
6th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing. | $150,000 | |
| Nov 18, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 4th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.Details
4th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing. | $150,000 | |
| Nov 18, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 5th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.Details
5th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing. | $100,000 | |
| Oct 16, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 3rd floor: t.i. of (e) office space. no exterior work. t.i. to include new floor, wall, and ceiling finishes; new non-bearing partitions and limited ceiling construction; new millwork and fixtures, new electrical and lighting fixtures; updated mechanical and plumbing layout.new restroom and fixturesDetails
3rd floor: t.i. of (e) office space. no exterior work. t.i. to include new floor, wall, and ceiling finishes; new non-bearing partitions and limited ceiling construction; new millwork and fixtures, new electrical and lighting fixtures; updated mechanical and plumbing layout.new restroom and fixtures | $200,000 | |
| Oct 15, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 2nd fl ti e office space. work includes new floor, wall and ceiling finshes, new non bearing partitions, limited ceiling construction new millwork and fixtures, updated mech and plumbing. new restroom and fixtures proposed. no exterior work. life safety under permitDetails
2nd fl ti e office space. work includes new floor, wall and ceiling finshes, new non bearing partitions, limited ceiling construction new millwork and fixtures, updated mech and plumbing. new restroom and fixtures proposed. no exterior work. life safety under permit | $250,000 | |
| Oct 4, 2019 | Completed final sign-off Dec 2020 | 28 02nd St | San Francisco Fire Protection | new control panel, radio comm smoke det in lobby and relay modules due to elev modernization. annunciator in main lobby and pull station near panel 201809079479Details
new control panel, radio comm smoke det in lobby and relay modules due to elev modernization. annunciator in main lobby and pull station near panel 201809079479 | $5,000 |
| Sep 26, 2019 | Never finaled issued Sep 2019, no final | 28 02nd St | street spaceDetails
street space | ||
| Sep 20, 2019 | Never finaled issued Sep 2019, no final | 28 02nd St | street spaceDetails
street space | ||
| Sep 12, 2019 | Never finaled issued Sep 2019, no final | 28 02nd St | street spaceDetails
street space | ||
| Jul 17, 2019 | Never finaled issued Jul 2019, no final | 28 02nd St | street spaceDetails
street space | ||
| Mar 14, 2019 | Completed final sign-off Jan 2021 | 28 02nd St | O'connor Plumbing & Fire Protection | fire: install 1 wsp w/zone control assembly & heads at front fire escape.Details
fire: install 1 wsp w/zone control assembly & heads at front fire escape. | $50,000 |
| Jan 15, 2019 | Expired or cancelled expired Nov 2023 | 28 02nd St | Narrowback Construction Co. | (n) 1st flr storfront design, awning & exterior lighting. remove rear fire escape. replace 1st fl office entry door & sidelights. remove finishes @ office lobby & restore ext cem plaster replace & relocate gas vent louversDetails
(n) 1st flr storfront design, awning & exterior lighting. remove rear fire escape. replace 1st fl office entry door & sidelights. remove finishes @ office lobby & restore ext cem plaster replace & relocate gas vent louvers | $79,000 |
| Jan 9, 2019 | Never finaled issued Jan 2019, no final | 28 02nd St | street spaceDetails
street space | ||
| Sep 7, 2018 | Completed final sign-off Apr 2025 | 28 02nd St | Narrowback Construction Co. | voluntary seismic strengthing @ all flrs. basement through roof. upgrade interior lobby finishes replace guard & hand rails @ int stairs. add stair enclosure to omt stair @ basement. accessible toilet room alteration @ 2nd flr . no exterior work.Details
voluntary seismic strengthing @ all flrs. basement through roof. upgrade interior lobby finishes replace guard & hand rails @ int stairs. add stair enclosure to omt stair @ basement. accessible toilet room alteration @ 2nd flr . no exterior work. | $1,063,326 |
| Apr 5, 2018 | Completed final sign-off Aug 2021 | 28 02nd St | Narrowback Construction Co. | 2,3,6 & 7/f -interior soft demolition only incl. finishes, suspended ceiling systems hvac ductork systems, int. non-bearing partitions, lighting, millwork plumbing fixtures, and surface mounted electrical distribution systemsDetails
2,3,6 & 7/f -interior soft demolition only incl. finishes, suspended ceiling systems hvac ductork systems, int. non-bearing partitions, lighting, millwork plumbing fixtures, and surface mounted electrical distribution systems | $23,350 |
| Apr 3, 2018 | Completed final sign-off May 2021 | 28 02nd St | Phoenix Electric Co. | pedestrian light pole support at sub sidewalk basement. n/a for maherDetails
pedestrian light pole support at sub sidewalk basement. n/a for maher | $10,000 |
| Dec 8, 2008 | Completed final sign-off Feb 2009 | 28 02nd St | Nielson Mechanical Inc. | install ansul fire suppression system light 1/2" and 3/8" conduit and sch 40 black pipe work, separate permit for connecting fire suppression into building fire alarm system and hoodDetails
install ansul fire suppression system light 1/2" and 3/8" conduit and sch 40 black pipe work, separate permit for connecting fire suppression into building fire alarm system and hood | $1,034 |
| Aug 26, 2008 | Completed final sign-off Dec 2008 | 28 02nd St | revision to pa #200805021213, provide structural supports to replace removed structural walls.Details
revision to pa #200805021213, provide structural supports to replace removed structural walls. | $8,000 | |
| Aug 13, 2008 | Never finaled issued Aug 2008, no final | 28 02nd St | street space permit only.Details
street space permit only. | ||
| Aug 7, 2008 | Never finaled issued Oct 2008, no final | 28 02nd St | Steve's Awning | to erect non-electrical, single faced sign.Details
to erect non-electrical, single faced sign. | $4,000 |
| Aug 7, 2008 | Never finaled issued Oct 2008, no final | 28 02nd St | Steve's Awning | to erect non electrical, double faced, projecting sign.Details
to erect non electrical, double faced, projecting sign. | $850 |
| May 27, 2008 | Never finaled issued May 2008, no final | 28 02nd St | remove non-bearing wall and counter and case works on ground floor. no exterior work to be performed. tenant improvement will be performed under a seperate permitDetails
remove non-bearing wall and counter and case works on ground floor. no exterior work to be performed. tenant improvement will be performed under a seperate permit | $5,000 | |
| May 15, 2008 | Completed final sign-off May 2008 | 28 02nd St | renew appl#9814951. all work done prior. this is for final inspection only.Details
renew appl#9814951. all work done prior. this is for final inspection only. | ||
| May 2, 2008 | Completed final sign-off Feb 2009 | 28 02nd St | All Bay Cities Construction | change of use from retail to restaurant on 1st floor - interior remodel for self serve, 2 new d.a. accessible restrooms, new corridor, new stair. replace glazing at existing storefront. occupant load verification.Details
change of use from retail to restaurant on 1st floor - interior remodel for self serve, 2 new d.a. accessible restrooms, new corridor, new stair. replace glazing at existing storefront. occupant load verification. | $195,000 |
| Nov 19, 2007 | Never finaled issued Nov 2007, no final | 28 02nd St | street space permit only.Details
street space permit only. | ||
| Jun 25, 2002 | Expired or cancelled expired Aug 2003 | 30 02nd St | erect two electric, double faced, wall signDetails
erect two electric, double faced, wall sign | ||
| Apr 4, 2002 | Completed final sign-off Jun 2002 | 30 02nd St | convert retail coffee shop to deli (sub-way)sandwichesDetails
convert retail coffee shop to deli (sub-way)sandwiches | $40,000 | |
| Apr 21, 2000 | Expired or cancelled expired Aug 2003 | 28 02nd St | basement renovation, add new stairDetails
basement renovation, add new stair | $70,000 | |
| Mar 27, 2000 | Completed final sign-off Apr 2000 | 28 02nd St | renew expired appl # 9818564Details
renew expired appl # 9818564 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- San Francisco Fire Protection (10), Trainor Commercial Construction Inc. (8), O'connor Plumbing & Fire Protection (6), Narrowback Construction Co. (4), Axel8 Construction (2), Steve's Awning (2), Aaa Restaurant Fire Control Llc, All Bay Cities Construction, All Systems Approved Inc, Infinium Air Inc, Nielson Mechanical Inc., Phoenix Electric Co., Schmitt Heating Co Inc
- Architects
- Ahmad Mohazab (7), John A. Chipman (5), Charles Blank (2), Louis Felthouse (2)
- Engineers
- Joshua Mcmahan (4), Madison Ryutaro Roberts (4), Amit Wadhwa (3), Levi G. Abarte (2), Chung Chi Ly, John C Sprinkle, Meng Hsiu Chen, Srdjan Rebraca
- Authorized agent-otherss
- John Holmberg
- Designers
- San Francisco Fire Protection
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.