Andrea Cochran
- License
- 2414
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- Firm
- Andrea Cochran Landscape Arch
- Based in
- San Francisco
- On San Francisco permits
- Feb 2012 to Jul 2026
10 permits since 2000 (architect on 10 permits): 4 completed, 5 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cahill Contractors Llc., Redhorse Constructors Inc., S J Amoroso Construction, Scott & Warner Builders Inc, Siteworks Landscape Inc., Truebeck Construction
- Architects
- Bartley Mcclellang, Federico Engel, Gregg Novicoff, Marsha Maytum, Paulett Taggart, Ryan Raskop
- Engineers
- Civil Engineer Angelo Obertello (2), Benjamin Noggle, David Kallmeyer, David Strandberg, Greg Wagner, Joseph Mccue, Kristina Martin, Marco Alves, Pak K Hui, Paul Littler, Ryan Beaton
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 2
- Commercial 2
- Other or unknown 4
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 1, 2026 | In progress filed Jul 2026, not yet issued | 1241 Delaware St | mayor dir ed13-01: block 9- prequel park- potrero power station development agreement- exterior work, landscape and architectural work to support temporary park use including (n) pathways, play equipment, railings, paving, planting areas and lighting (deferred).Details
mayor dir ed13-01: block 9- prequel park- potrero power station development agreement- exterior work, landscape and architectural work to support temporary park use including (n) pathways, play equipment, railings, paving, planting areas and lighting (deferred). | $4,000,000 | |
| Jul 1, 2026 | In progress filed Jul 2026, not yet issued | 1241 Delaware St | mayor dir ed13-01: unit 3-prequel park- potrero power station dev- temp park use & back of house maintenance space(not occupiable to public), under footprint of unit 3 structure. (n)pathways, railings, paving & lighting (deferred). misc, structural work for back on house raised platform on mat slab.Details
mayor dir ed13-01: unit 3-prequel park- potrero power station dev- temp park use & back of house maintenance space(not occupiable to public), under footprint of unit 3 structure. (n)pathways, railings, paving & lighting (deferred). misc, structural work for back on house raised platform on mat slab. | $1,500,000 | |
| Oct 23, 2025 | Completed final sign-off Oct 2026 | 255 California St | Siteworks Landscape Inc. | landscape improvements on existing level 2 exterior terrace which includes: new planting, new bench, and replace synthetic turf with planting and paving.Details
landscape improvements on existing level 2 exterior terrace which includes: new planting, new bench, and replace synthetic turf with planting and paving. | $429,000 |
| Jul 15, 2025 | In progress filed Jul 2025, not yet issued | 401 California Av | Cahill Contractors Llc. | to erect 6 stories, no basement, type i-a & ii-a, 150 units residential units with child development center (warmshell), (r-2, b,a-3,s-1,s-2,i-4)Details
to erect 6 stories, no basement, type i-a & ii-a, 150 units residential units with child development center (warmshell), (r-2, b,a-3,s-1,s-2,i-4) | $79,391,871 |
| Mar 14, 2024 | Expired or cancelled expired Apr 2026 | 2845 Fillmore St | Redhorse Constructors Inc. | revision to pa# 202312212916 (n) raised planer bed along (e) property line retaining wall. (n) grade beams & lagging at (e) tree. rear yard workDetails
revision to pa# 202312212916 (n) raised planer bed along (e) property line retaining wall. (n) grade beams & lagging at (e) tree. rear yard work | $10,000 |
| Nov 10, 2023 | In progress issued Feb 2024 | 1190 Gough St | 1190 gough st - install new 8' wrongout iron security fence (inside parking lot)Details
1190 gough st - install new 8' wrongout iron security fence (inside parking lot) | $75,000 | |
| Nov 10, 2023 | In progress issued Feb 2024 | 1001 Franklin St | remove old 3' fence and install new 8' fence. (frnce not at public right awwayDetails
remove old 3' fence and install new 8' fence. (frnce not at public right awway | $75,000 | |
| Mar 26, 2021 | Completed final sign-off Jun 2026 | 160 Hahn St | S J Amoroso Construction | to erect a one story, no dwelling, no basement, type v-b building. new recreation center and herz playground improvements. interior gymnasium and multipurpose room, supporting office space, storage, kitchen. exterior fitness plaza, outdoor recreation spaces. small maintenance shed/yard.Details
to erect a one story, no dwelling, no basement, type v-b building. new recreation center and herz playground improvements. interior gymnasium and multipurpose room, supporting office space, storage, kitchen. exterior fitness plaza, outdoor recreation spaces. small maintenance shed/yard. | $10,000,000 |
| Nov 27, 2019 | Completed final sign-off Jun 2022 | 3746 Jackson St | Scott & Warner Builders Inc | to replace existing wooden deck and stair with new translucent glass deck, stone stair and glass guardrail.Details
to replace existing wooden deck and stair with new translucent glass deck, stone stair and glass guardrail. | $30,000 |
| Feb 7, 2012 | Completed final sign-off Mar 2014 | 1355 Market St | Truebeck Construction | at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.)Details
at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.) | $785,000 |