Bartley Mcclelland
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Rmw Architecture & Interiors
- Based in
- Sf
- On San Francisco permits
- Jan 2001 to Oct 2020
38 permits since 2000 (architect on 33 permits, authorized agent-others on 3 permits, designer on 1 permit, engineer on 1 permit): 31 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2020 | Completed final sign-off Apr 2022 | 2 Henry Adams St | C C I Commercial Construction & Improv | revision to approved pa 201809139936 penthouse, roofdeck & elevators. revisions are for elevator # 3 only. mods to hoistway sfaft & structr support for (n) elevator cab. (elevat cab under separate permit). mods to elevator lobbies all flrs & mach rm improvments. mep, life safety under separate permiDetails
revision to approved pa 201809139936 penthouse, roofdeck & elevators. revisions are for elevator # 3 only. mods to hoistway sfaft & structr support for (n) elevator cab. (elevat cab under separate permit). mods to elevator lobbies all flrs & mach rm improvments. mep, life safety under separate permi | $85,000 |
| Jul 10, 2019 | Completed final sign-off Aug 2019 | 475 Sansome St | Novo Construction Inc | 18th flr. demo of non-structural partitions. demo all mep's, flooring and ceiling. ref pa 201907115677 sprinklerDetails
18th flr. demo of non-structural partitions. demo all mep's, flooring and ceiling. ref pa 201907115677 sprinkler | $125,000 |
| Jul 2, 2019 | Expired or cancelled cancelled Nov 2022 | 404 Montgomery St | Field Construction Inc. | barrier removal, new front entry door, new finishesDetails
barrier removal, new front entry door, new finishes | $70,000 |
| Jun 26, 2019 | Completed final sign-off May 2020 | 120 Kearny St | Sc Builders, Inc | revision to pa 201906113077. 8th flr, suite 800. clarifying reception desk da section, break room da section of counter and islandDetails
revision to pa 201906113077. 8th flr, suite 800. clarifying reception desk da section, break room da section of counter and island | |
| Jun 11, 2019 | Completed final sign-off Jun 2020 | 120 Kearny St | Sc Builders, Inc | 8th fl, ste 800 ti to consist of new non-structural partitions, finishes. mep & fire life safety under separate permit. demo under pa #201906113081.Details
8th fl, ste 800 ti to consist of new non-structural partitions, finishes. mep & fire life safety under separate permit. demo under pa #201906113081. | $700,000 |
| Mar 27, 2019 | Completed final sign-off Sep 2019 | 45 Fremont St | Richlen Construction | ti 3rd flr - demo (e) partitions/doors ceiling & light fixtures. new construction - partitions, doors, ceiling & light fixtures, millwork. plum, ele restreoom upgradeDetails
ti 3rd flr - demo (e) partitions/doors ceiling & light fixtures. new construction - partitions, doors, ceiling & light fixtures, millwork. plum, ele restreoom upgrade | $890,000 |
| Mar 12, 2019 | Completed final sign-off Dec 2019 | 525 Gough St | Maven Maintenance Inc | unit #104; remodel in kind. replace kitchen cabinets and counters. new bathroom tiles and fixtures in all three bathrooms. replace tub in master bath with shower stall only. replace light fixtures. replace sliding glass doors to rear deckDetails
unit #104; remodel in kind. replace kitchen cabinets and counters. new bathroom tiles and fixtures in all three bathrooms. replace tub in master bath with shower stall only. replace light fixtures. replace sliding glass doors to rear deck | $7,000 |
| Jan 3, 2018 | Never finaled issued Feb 2018, no final | 235 Montgomery St | R.M.R. Construction Company | 5th flr: demo of non structural partitions. suite to remain unoccupied until a ti is filed under ab-017// see sprinkler permit #201801199032 for referenceDetails
5th flr: demo of non structural partitions. suite to remain unoccupied until a ti is filed under ab-017// see sprinkler permit #201801199032 for reference | $94,000 |
| Jul 7, 2017 | Completed final sign-off Dec 2017 | 250 Montgomery St | Field Construction Inc. | 6th floor suite 610 - modify portion of exisitng ceiling & two light fixtures. remove flooring finishes. provide new ceiling system, light fixtures, gyp. board header, glazing, frames, door & finishes. mep/fire deferred submittal. n/a maher ordinanceDetails
6th floor suite 610 - modify portion of exisitng ceiling & two light fixtures. remove flooring finishes. provide new ceiling system, light fixtures, gyp. board header, glazing, frames, door & finishes. mep/fire deferred submittal. n/a maher ordinance | $80,000 |
| Sep 22, 2016 | Completed final sign-off Mar 2017 | 50 Beale St | Field Construction Inc. | 12/f- tenant improvement: remove (e) counter top, sink & flooring in (e) mother's room. create new all gender/unisex accessible rstroom. new finishes. light fixtures to remain. new gfi outlet. n/a ordinance #155-13Details
12/f- tenant improvement: remove (e) counter top, sink & flooring in (e) mother's room. create new all gender/unisex accessible rstroom. new finishes. light fixtures to remain. new gfi outlet. n/a ordinance #155-13 | $70,000 |
| Sep 22, 2016 | Never finaled issued Oct 2016, no final | 685 Market St | Truebeck Construction | ti suite 220 (e) finishes to remain. suite 290: demo finishes & partitions. new partitions, door/frames, sidelights, finishes, ceiling system/devices light fixtures and electricalDetails
ti suite 220 (e) finishes to remain. suite 290: demo finishes & partitions. new partitions, door/frames, sidelights, finishes, ceiling system/devices light fixtures and electrical | $1,075,000 |
| Sep 22, 2016 | Completed final sign-off Mar 2017 | 50 Beale St | Field Construction Inc. | 13/f- new all gender/unisex accessible restroom & mother's room. includes new plumbing, finishes & acceosries and electrical. ceiling system to remain & relocate (e) light fixtures. relocate millwork, sink & faucet from 12th floor to 13/f. n/a ordinance #155-13Details
13/f- new all gender/unisex accessible restroom & mother's room. includes new plumbing, finishes & acceosries and electrical. ceiling system to remain & relocate (e) light fixtures. relocate millwork, sink & faucet from 12th floor to 13/f. n/a ordinance #155-13 | $100,000 |
| Jun 3, 2016 | Completed final sign-off Feb 2021 | 555 Mission St | Gci, Inc | 32nd floor, suite 3200: interior tenant improvement. new non structural partitions, finishes to match (e). fire/life safety/sprinklers under sep permit. compliance with maher ordinance no 155-13.Details
32nd floor, suite 3200: interior tenant improvement. new non structural partitions, finishes to match (e). fire/life safety/sprinklers under sep permit. compliance with maher ordinance no 155-13. | $600,000 |
| Jul 29, 2015 | Completed final sign-off Jun 2017 | 1 Sutter St | Bevilacqua & Sons | demolition only, no new construction. demolition of non-structural partitions, millwork and light fixtures. suite to remain unoccupied until tenant improvement permit is filed, under ab-17. n/a for the maher.Details
demolition only, no new construction. demolition of non-structural partitions, millwork and light fixtures. suite to remain unoccupied until tenant improvement permit is filed, under ab-17. n/a for the maher. | $30,000 |
| Jul 29, 2014 | Completed final sign-off Jan 2015 | 444 De Haro St | Principal Builders Inc. | 1st floor: t.i. to construct new non-load bearing partitions, doors, millwork finishes, electrical/plumbing. fire sprinklers, fire alarm and structural details under seperate permit. n/a for the maher ordinance #155-13Details
1st floor: t.i. to construct new non-load bearing partitions, doors, millwork finishes, electrical/plumbing. fire sprinklers, fire alarm and structural details under seperate permit. n/a for the maher ordinance #155-13 | $2,500,000 |
| Jul 25, 2014 | Completed final sign-off Oct 2014 | 275 Battery St | Hathaway Dinwiddie Co. | suite #440 and 460: commercial t.i. inclu. demo of selective (e) int. partition(demising), demo of selective (e) ceiling. relocate (e) lighting & life safety, new 2x2 ceiling, new interior partition(demising), selective new finishes, relocate extg glazing, new furniture & workstations,sink (breakrmDetails
suite #440 and 460: commercial t.i. inclu. demo of selective (e) int. partition(demising), demo of selective (e) ceiling. relocate (e) lighting & life safety, new 2x2 ceiling, new interior partition(demising), selective new finishes, relocate extg glazing, new furniture & workstations,sink (breakrm | $60,000 |
| Nov 26, 2013 | Expired or cancelled cancelled Nov 2024 | 1355 Market St | Truebeck Construction | revision to exterior openings no structural work. new interior demising partition.revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space.Details
revision to exterior openings no structural work. new interior demising partition.revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space. | $30,000 |
| Nov 26, 2013 | Completed final sign-off Aug 2014 | 1355 Market St | Truebeck Construction | revision to exterior openings w/ structural work per a-3.1 & s-1. new exterior deck & ground floor. revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space. compliance with ordinance no. 155-13 not required.Details
revision to exterior openings w/ structural work per a-3.1 & s-1. new exterior deck & ground floor. revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space. compliance with ordinance no. 155-13 not required. | $50,000 |
| Jun 5, 2013 | Completed final sign-off Dec 2013 | 100 California St | Peacock Construction Inc | demolition of non structural partitions, new finishes, new restroom fixtures and finishes, mep life safety and sprinklers under separate permit. future ti under separate permit.Details
demolition of non structural partitions, new finishes, new restroom fixtures and finishes, mep life safety and sprinklers under separate permit. future ti under separate permit. | $178,500 |
| May 16, 2013 | Completed final sign-off Mar 2014 | 875 Stevenson St | Truebeck Construction | work in basement & 1st flr-includes exterior & interior demolition work, structural work in the indicated locations, zone 1 & 2. select areas of demolition including hole in 1st flr slab for new vehicle ramp, removal of (e) trash chute at basement & 1st flrs. (e) future trash enclosure & removal ofDetails
work in basement & 1st flr-includes exterior & interior demolition work, structural work in the indicated locations, zone 1 & 2. select areas of demolition including hole in 1st flr slab for new vehicle ramp, removal of (e) trash chute at basement & 1st flrs. (e) future trash enclosure & removal of | $50,000 |
| Mar 19, 2013 | Completed final sign-off Sep 2013 | 875 Stevenson St | Truebeck Construction | 1st thru 10th floors-interior demolition scope includes removal of all unoccupied tenant build-outs, mechanical, electrical, plumbing & other interior finishes throughout. no structural demolition is part of this scope of work. building to remain unoccupied per ab-017Details
1st thru 10th floors-interior demolition scope includes removal of all unoccupied tenant build-outs, mechanical, electrical, plumbing & other interior finishes throughout. no structural demolition is part of this scope of work. building to remain unoccupied per ab-017 | $75,000 |
| Nov 15, 2012 | Completed final sign-off Jan 2015 | 111 Sutter St | Peacock Construction Inc | interior demolition of existing tenant partitions, ceilings, finishes. removal of existing mezzanine & stair approx. 2,120 sq.ft. safing off, capping/ removal of electrical & plumbing complying with ab-17Details
interior demolition of existing tenant partitions, ceilings, finishes. removal of existing mezzanine & stair approx. 2,120 sq.ft. safing off, capping/ removal of electrical & plumbing complying with ab-17 | $27,600 |
| Sep 5, 2012 | Completed final sign-off Oct 2013 | 1355 Market St | demo portion of (e) south facade ground floor windows & window openings to finish floor. remove (e) boiler file at ground & 2nd floor. remove (e) slab at 2nd floor for future stair. remove (e) louvers in (e) window openings & remove (e) windows. 2nd flooor slab removal as per strucutral drawing.Details
demo portion of (e) south facade ground floor windows & window openings to finish floor. remove (e) boiler file at ground & 2nd floor. remove (e) slab at 2nd floor for future stair. remove (e) louvers in (e) window openings & remove (e) windows. 2nd flooor slab removal as per strucutral drawing. | $375,000 | |
| Sep 5, 2012 | Completed final sign-off Jan 2013 | 101 Montgomery St | Cahill Const Service Inc | suite 400 tenant improvement consisting of new non-load bearing walls, doors, lighting, new power, & new finishes. meps under separate permit.sprinkler and fire alarm seperate permitDetails
suite 400 tenant improvement consisting of new non-load bearing walls, doors, lighting, new power, & new finishes. meps under separate permit.sprinkler and fire alarm seperate permit | $300,000 |
| Jun 1, 2012 | Completed final sign-off Dec 2012 | 425 Market St | Turner Construction Co | revision to 201202164279. interior tenant improvement. revision includes construction of new doors.Details
revision to 201202164279. interior tenant improvement. revision includes construction of new doors. | $35,000 |
| May 31, 2012 | Completed final sign-off Feb 2013 | 868 Folsom St | Skyline Construction | selective demolition of interior partitoins, ceilings & floors. new interior ceilings, partitions & floors, additional bathrooms & shower to be built.Details
selective demolition of interior partitoins, ceilings & floors. new interior ceilings, partitions & floors, additional bathrooms & shower to be built. | $680,000 |
| May 2, 2012 | Completed final sign-off Feb 2013 | 1455 Market St | Swinerton Builders | lobby - relocate turnstiles & add new mailroom & offices, add new finishes. mep & life safety under separate permit.Details
lobby - relocate turnstiles & add new mailroom & offices, add new finishes. mep & life safety under separate permit. | $217,000 |
| Apr 17, 2012 | Never finaled issued Apr 2012, no final | 1355 Market St | Truebeck Construction | partial 2nd floor work includes new multi-tenant corridors, doors. scope of work is a revision to interior construction package pa #2011.07.05.9463 & #2011.11.22.9465. mep & life safety to be submitted under sepatare deferred permit. ab-017 & ab-56 are in effect as is currenty an unoccupied bldg.Details
partial 2nd floor work includes new multi-tenant corridors, doors. scope of work is a revision to interior construction package pa #2011.07.05.9463 & #2011.11.22.9465. mep & life safety to be submitted under sepatare deferred permit. ab-017 & ab-56 are in effect as is currenty an unoccupied bldg. | $60,000 |
| Mar 6, 2012 | Completed final sign-off Oct 2013 | 1355 Market St | Truebeck Construction | revision to interior construction package submitted 7/5/11 pa #201107059463-scope include revision to mail room, & addition of security rooms. ref pa #200809222258, ab-056 filed under separate pa #2011.10.14.6792. av-017 exception to req'd for d.a. to vacant spaces, ada upgrades will occur in futurDetails
revision to interior construction package submitted 7/5/11 pa #201107059463-scope include revision to mail room, & addition of security rooms. ref pa #200809222258, ab-056 filed under separate pa #2011.10.14.6792. av-017 exception to req'd for d.a. to vacant spaces, ada upgrades will occur in futur | $50,000 |
| Feb 27, 2012 | Completed final sign-off Oct 2012 | 235 Montgomery St | Principal Builders Inc. | 21st floor - demolition of existing tenant improvement. space to remain unoccupied until tenant improvement filed per ab-017.Details
21st floor - demolition of existing tenant improvement. space to remain unoccupied until tenant improvement filed per ab-017. | $15,000 |
| Feb 7, 2012 | Completed final sign-off Mar 2014 | 1355 Market St | Truebeck Construction | at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.)Details
at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.) | $785,000 |
| Oct 28, 2011 | Completed final sign-off Sep 2012 | 111 Sutter St | Peacock Construction Inc | remodel grd fl main entr to provide core compaint access entry. wk incl demo (e) storefront to install new accessible entrance door & corridor access to (e) accessible elevator lobby. assoc elec,lighting&power per scope.Details
remodel grd fl main entr to provide core compaint access entry. wk incl demo (e) storefront to install new accessible entrance door & corridor access to (e) accessible elevator lobby. assoc elec,lighting&power per scope. | $45,000 |
| Oct 28, 2011 | Completed final sign-off Oct 2013 | 1355 Market St | Truebeck Construction | addition new showers located on floor 8 for its tenant onlyDetails
addition new showers located on floor 8 for its tenant only | $75,000 |
| Oct 14, 2011 | Completed final sign-off Oct 2013 | 1355 Market St | Truebeck Construction | basement, 2nd thru 11th floors-revison to pa# 2011-09164894-new rated enclosure around (e) basement fire pump, new rated partitions at basement gas meter rooms. rated & non rated partitions at teledata rooms floors 2/11, revised door partitions to match partition ratingsDetails
basement, 2nd thru 11th floors-revison to pa# 2011-09164894-new rated enclosure around (e) basement fire pump, new rated partitions at basement gas meter rooms. rated & non rated partitions at teledata rooms floors 2/11, revised door partitions to match partition ratings | $20,000 |
| Oct 14, 2011 | Never finaled issued Jan 2014, no final | 1355 Market St | Truebeck Construction | file for ab-056, disabled access compliance status documentation.Details
file for ab-056, disabled access compliance status documentation. | |
| Jun 20, 2011 | Completed final sign-off Dec 2011 | 111 Sutter St | Bevilacqua & Sons | 15th floor - convert 1 large office to 2 small offices: new door, patcj, repair finishes, new floor core, recircuit (e) lighting.Details
15th floor - convert 1 large office to 2 small offices: new door, patcj, repair finishes, new floor core, recircuit (e) lighting. | $25,000 |
| Jun 2, 2011 | Completed final sign-off Jul 2011 | 111 Sutter St | Bevilacqua & Sons | suite #525-add small breakeroom, counter with sink & upper/lower cabinets, convert 2 small office to 1 larger office. relocate 1 lightDetails
suite #525-add small breakeroom, counter with sink & upper/lower cabinets, convert 2 small office to 1 larger office. relocate 1 light | $25,000 |
| Jan 4, 2001 | Expired or cancelled withdrawn May 2009 | 1369 Hyde St | replacement of existing roof screen. replacement in kind. comply w/ nov199928610 (hid)Details
replacement of existing roof screen. replacement in kind. comply w/ nov199928610 (hid) | $40,000 |