Block 0217, lot 025
1369 Hyde St
- City’s use
- Multi-Family Residential
- Built
- 1911
- Stories
- 8
- Units
- 82
- Rooms
- 85 bathrooms
- Building
- 99,126 sq ft
- Lot
- 27,156 sq ft
- Zoning
- RM3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
103 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1369 Hyde St | legalize existing efficiency kitchens in units 17a, 40a, 56a.Details
legalize existing efficiency kitchens in units 17a, 40a, 56a. | ||
| Apr 20, 2026 | In progress issued Jul 2026 | 1369 Hyde St | Brighter Bay Builders Inc | unit#27: rehabilitate existing kitvhn & bathroom; install washer & dryerDetails
unit#27: rehabilitate existing kitvhn & bathroom; install washer & dryer | $70,000 |
| Dec 11, 2025 | Completed final sign-off Jan 2026 | 1369 Hyde St | Hue & Cry Security System | as builts in reference to ppermit#2022-1117-6742. added low frequency sounders to bedrooms in units 17,18,29,47 & 66. updated location of water flow,temper at facp.Details
as builts in reference to ppermit#2022-1117-6742. added low frequency sounders to bedrooms in units 17,18,29,47 & 66. updated location of water flow,temper at facp. | $5,142 |
| Oct 8, 2025 | Completed final sign-off Dec 2025 | 1369 Hyde St | Brighter Bay Builders Inc | unit #29. 3rd floor: revision to pa# 202507020027 to change washer dyer from gas to electric ventless, change bathroom vent and provide penetration detial. no plumging fixture.Details
unit #29. 3rd floor: revision to pa# 202507020027 to change washer dyer from gas to electric ventless, change bathroom vent and provide penetration detial. no plumging fixture. | $100 |
| Jul 2, 2025 | Completed final sign-off Dec 2025 | 1369 Hyde St | Brighter Bay Builders Inc | unit 29: convert existing kitchen to study. relocate existing kitchen. rehabilitate existing bathroom. install washer and dryer.Details
unit 29: convert existing kitchen to study. relocate existing kitchen. rehabilitate existing bathroom. install washer and dryer. | $50,000 |
| Jun 2, 2025 | Completed final sign-off Dec 2025 | 1369 Hyde St | G T M Works Llc Dba Greentree Maint | unit #26: 1. rehab existing kitchen. 2. rehab existing bathroom. 3. install washer and dryer.Details
unit #26: 1. rehab existing kitchen. 2. rehab existing bathroom. 3. install washer and dryer. | $70,000 |
| Mar 11, 2025 | Completed final sign-off Dec 2025 | 1369 Hyde St | Doherty Restoration, Inc. | administrative revision to applicatoin #202409040045. the work in this permit complies with and addresses repairs itemized in ab110 report. by borne consulting dated 9/2/22 and approved by dbi 4/11/23Details
administrative revision to applicatoin #202409040045. the work in this permit complies with and addresses repairs itemized in ab110 report. by borne consulting dated 9/2/22 and approved by dbi 4/11/23 | |
| Sep 4, 2024 | In progress issued Sep 2024 | 1369 Hyde St | Doherty Restoration, Inc. | miscellaneous brick repointing and brick repair (approx. 300 bricks) at exteriorDetails
miscellaneous brick repointing and brick repair (approx. 300 bricks) at exterior | $50,000 |
| Jul 15, 2024 | Completed final sign-off Oct 2024 | 1369 Hyde St | Brighter Bay Builders Inc | unit #51: rehabilitate (e) kitchen. rehabilitate (e) bathroom. install washer and dryer. no removal of structural walls.Details
unit #51: rehabilitate (e) kitchen. rehabilitate (e) bathroom. install washer and dryer. no removal of structural walls. | $60,000 |
| Oct 3, 2023 | Never finaled filed Oct 2023, never issued | 1369 Hyde St | renovate existing second floors storage room into a commom area room for use by residential tenants only. accessory to residential use.Details
renovate existing second floors storage room into a commom area room for use by residential tenants only. accessory to residential use. | $20,000 | |
| Sep 27, 2023 | Completed final sign-off Dec 2023 | 1369 Hyde St | Brighter Bay Builders Inc | unit 48: install 1 new clothes washer/dryer. no wall demoDetails
unit 48: install 1 new clothes washer/dryer. no wall demo | $5,000 |
| Aug 23, 2023 | Completed final sign-off Oct 2023 | 1369 Hyde St | Brighter Bay Builders Inc | unit #63: install 1-clothes washer and dryer. no structural wall demo.Details
unit #63: install 1-clothes washer and dryer. no structural wall demo. | $5,000 |
| Jul 28, 2023 | Completed final sign-off Sep 2023 | 1369 Hyde St | Brighter Bay Builders Inc | unit #74. install 1- washer & dryer. no wall demo.Details
unit #74. install 1- washer & dryer. no wall demo. | $2,500 |
| Jul 27, 2023 | Completed final sign-off Oct 2023 | 1369 Hyde St | Brighter Bay Builders Inc | unit 49: revision to 202306150159. change locatoin for new clothes washer and dryer t install in e closet. build new closet for e bedroom. no structural wall demo.Details
unit 49: revision to 202306150159. change locatoin for new clothes washer and dryer t install in e closet. build new closet for e bedroom. no structural wall demo. | $6,000 |
| Jun 15, 2023 | Completed final sign-off Oct 2023 | 1369 Hyde St | Brighter Bay Builders Inc | unit 49: install 1 new clothes washer and dryer.no wall demoDetails
unit 49: install 1 new clothes washer and dryer.no wall demo | $5,000 |
| Apr 20, 2023 | Completed final sign-off Jul 2023 | 1369 Hyde St | Brighter Bay Builders Inc | unit 35 - install one (n) clothes washer & dryer; 1 dishwasher. no structural demoDetails
unit 35 - install one (n) clothes washer & dryer; 1 dishwasher. no structural demo | $2,500 |
| Jan 23, 2023 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | unit #43. convert (e) dining to living. convert (e) living to bedroom. rehabilitate (e) kitchen. rehabilitate (e) bathroom. install washer & dryer.Details
unit #43. convert (e) dining to living. convert (e) living to bedroom. rehabilitate (e) kitchen. rehabilitate (e) bathroom. install washer & dryer. | $45,000 | |
| Nov 29, 2022 | Completed final sign-off Dec 2022 | 1369 Hyde St | Fault Line Plumbing Inc | 1 new sprinler head in 7th fl. stairwayDetails
1 new sprinler head in 7th fl. stairway | $3,000 |
| Nov 17, 2022 | Completed final sign-off Jan 2026 | 1369 Hyde St | Hue & Cry Security System | replace system in kind to meet code 1103.7.6.1 to add low frequency sounders in all sleeping areas. additions of smokes & pulls in all common areas.Details
replace system in kind to meet code 1103.7.6.1 to add low frequency sounders in all sleeping areas. additions of smokes & pulls in all common areas. | $212,000 |
| Nov 17, 2022 | Completed final sign-off Mar 2023 | 1369 Hyde St | Brighter Bay Builders Inc | unit #57: install 1 new clothes washer/ dryer. no structural wall demo.Details
unit #57: install 1 new clothes washer/ dryer. no structural wall demo. | $4,000 |
| Nov 9, 2022 | Completed final sign-off Apr 2023 | 1369 Hyde St | Brighter Bay Builders Inc | #33. convert (e) living to bedroom. rehab (e) kitchen, rehab (e) bathroom, install washer/dryer.Details
#33. convert (e) living to bedroom. rehab (e) kitchen, rehab (e) bathroom, install washer/dryer. | $42,000 |
| Oct 19, 2022 | Completed final sign-off Apr 2023 | 1369 Hyde St | Brighter Bay Builders Inc | 4th fl # 31. rehab (e) kitchen & bathroom. install washer and dryer. no removal or structural walls.Details
4th fl # 31. rehab (e) kitchen & bathroom. install washer and dryer. no removal or structural walls. | $40,000 |
| Oct 11, 2022 | Never finaled issued Oct 2022, no final | 1369 Hyde St | Brighter Bay Builders Inc | apt 11: intstall 1 new clothes washer/dryer. replace bathroom sink in-kind. no structural wall demo.Details
apt 11: intstall 1 new clothes washer/dryer. replace bathroom sink in-kind. no structural wall demo. | $5,000 |
| Jul 11, 2022 | Completed final sign-off Oct 2022 | 1369 Hyde St | Brighter Bay Builders Inc | unit 46: install one new clothes washer and dryer. no structural wall demo.Details
unit 46: install one new clothes washer and dryer. no structural wall demo. | $5,000 |
| Jun 30, 2022 | Completed final sign-off Nov 2022 | 1369 Hyde St | Brighter Bay Builders Inc | #44: rehabilitate existing kitchen. rehabilitate existing kitchen. install second bathroom. install washer & dryer.Details
#44: rehabilitate existing kitchen. rehabilitate existing kitchen. install second bathroom. install washer & dryer. | $25,000 |
| May 10, 2022 | Completed final sign-off Oct 2022 | 1369 Hyde St | Brighter Bay Builders Inc | apt #32: revision to pa#202108307406. remove capture of corridor space from scope.Details
apt #32: revision to pa#202108307406. remove capture of corridor space from scope. | |
| May 10, 2022 | Completed final sign-off Nov 2022 | 1369 Hyde St | Brighter Bay Builders Inc | #2: convert extg dining to bedroom. rehab extg kitchen, rehab extg bathroom, install 2nd bathroom, and install washer/dryerDetails
#2: convert extg dining to bedroom. rehab extg kitchen, rehab extg bathroom, install 2nd bathroom, and install washer/dryer | $26,000 |
| Mar 16, 2022 | Completed final sign-off Jun 2022 | 1369 Hyde St | Brighter Bay Builders Inc | unit 36 - 4th flr - install 1 (n) clothes washer & elec dryer. note - no structural wall demo.Details
unit 36 - 4th flr - install 1 (n) clothes washer & elec dryer. note - no structural wall demo. | $2,500 |
| Mar 8, 2022 | Completed final sign-off Oct 2022 | 1369 Hyde St | Hon's Construction Inc. | revision to pa#202109228925. revise structural sheets to match extg field conditions. revise flue, location-revise 6th floor extg framing. wall sheeting at cross wall. show extg wall ledgers.Details
revision to pa#202109228925. revise structural sheets to match extg field conditions. revise flue, location-revise 6th floor extg framing. wall sheeting at cross wall. show extg wall ledgers. | |
| Mar 4, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | unit 67: convert existing dining to bedroom. install half bathroom.Details
unit 67: convert existing dining to bedroom. install half bathroom. | $15,000 | |
| Feb 25, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | install 2nd bath, relocate e washer dryerDetails
install 2nd bath, relocate e washer dryer | $23,000 | |
| Feb 25, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | unit #37: install half bath.Details
unit #37: install half bath. | $9,000 | |
| Feb 25, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | #55: 1) convert extg living to bedroom. 2) convert extg dining to living.Details
#55: 1) convert extg living to bedroom. 2) convert extg dining to living. | $6,000 | |
| Feb 25, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | #60: 1)install 2nd new bathroom. 2)install closetDetails
#60: 1)install 2nd new bathroom. 2)install closet | $20,000 | |
| Feb 25, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | #50: 1) install second new bathoom. 2) install closetsDetails
#50: 1) install second new bathoom. 2) install closets | $19,000 | |
| Feb 25, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | unit #45: convert (e) living to bedroom. convert (e) dining to living.Details
unit #45: convert (e) living to bedroom. convert (e) dining to living. | $7,000 | |
| Feb 16, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | install a half bathDetails
install a half bath | $11,000 | |
| Feb 16, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | unit 24: install second bathroom. relocate existing washer/dryer.Details
unit 24: install second bathroom. relocate existing washer/dryer. | $17,000 | |
| Feb 16, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | unit 30: install second new bathroom and closets.Details
unit 30: install second new bathroom and closets. | $17,000 | |
| Feb 16, 2022 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | install half bath at unit #17Details
install half bath at unit #17 | $11,000 | |
| Jan 13, 2022 | Completed final sign-off Oct 2022 | 1369 Hyde St | Brighter Bay Builders Inc | unit 65: convert (e) living room to bedroom, (e) dining to living room, rehab (e) bathroomDetails
unit 65: convert (e) living room to bedroom, (e) dining to living room, rehab (e) bathroom | $28,000 |
| Dec 20, 2021 | Completed final sign-off Jun 2022 | 1369 Hyde St | Brighter Bay Builders Inc | unit 69: convert (e) kitchen to bedroom. relocate (e) kitchen and bathroom. install washer/dryer.Details
unit 69: convert (e) kitchen to bedroom. relocate (e) kitchen and bathroom. install washer/dryer. | $33,000 |
| Nov 10, 2021 | Completed final sign-off Nov 2022 | 1369 Hyde St | Brighter Bay Builders Inc | apt 42: install second bathroom. rehab kitchen, rehab (e) bathroom. convert (e) dining to bedroom. install washer/dryer.Details
apt 42: install second bathroom. rehab kitchen, rehab (e) bathroom. convert (e) dining to bedroom. install washer/dryer. | $43,000 |
| Nov 2, 2021 | Completed final sign-off May 2022 | 1369 Hyde St | Brighter Bay Builders Inc | unit #19. convert (e) living room to bedroom. convert (e) dining to living room. relocate bathroom, install washer & dryer.Details
unit #19. convert (e) living room to bedroom. convert (e) dining to living room. relocate bathroom, install washer & dryer. | $38,000 |
| Oct 29, 2021 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | 1st flr - apt 1: convert (e) kitchen to second bathroom. relocate kitchen, rehab (e) bathroom. convert (e) dining to office. install washer/gas dryer.Details
1st flr - apt 1: convert (e) kitchen to second bathroom. relocate kitchen, rehab (e) bathroom. convert (e) dining to office. install washer/gas dryer. | $47,000 | |
| Oct 7, 2021 | Completed final sign-off Jan 2023 | 1369 Hyde St | Brighter Bay Builders Inc | #5: 1) rehabilitate extg kitchen.2) convert extg living room to study. 3)rehabilitate extg bathroom. 3)install washer and dryer.Details
#5: 1) rehabilitate extg kitchen.2) convert extg living room to study. 3)rehabilitate extg bathroom. 3)install washer and dryer. | $40,000 |
| Oct 7, 2021 | Completed final sign-off Mar 2022 | 1369 Hyde St | Brighter Bay Builders Inc | #4: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer.Details
#4: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. | $38,000 |
| Sep 30, 2021 | Never finaled issued Oct 2021, no final | 1369 Hyde St | Martin Sign Co Inc. | fabrication of evacuation maps for basement, mezzanine, and floors. 1-7 at 1369 hyde street.Details
fabrication of evacuation maps for basement, mezzanine, and floors. 1-7 at 1369 hyde street. | $4,600 |
| Sep 22, 2021 | Completed final sign-off Dec 2022 | 1369 Hyde St | Hon's Construction Inc. | construction (n) exit acess stairwell between levels 6:7 remodel units 72 and 65 to accomodate (n) stair unit 65 to receive remodeled ktichen and (n) washer/dryer.Details
construction (n) exit acess stairwell between levels 6:7 remodel units 72 and 65 to accomodate (n) stair unit 65 to receive remodeled ktichen and (n) washer/dryer. | $50,000 |
| Aug 30, 2021 | Completed final sign-off Oct 2022 | 1369 Hyde St | Brighter Bay Builders Inc | 4th flr - unit 32 - rehabilitate (e) kitchen & bathroom; install second bathroom; install washer & gas dryer; capture 118 sf gross corridor dead end space to enlarge bedroom/add closet.Details
4th flr - unit 32 - rehabilitate (e) kitchen & bathroom; install second bathroom; install washer & gas dryer; capture 118 sf gross corridor dead end space to enlarge bedroom/add closet. | $60,000 |
| Aug 26, 2021 | Completed final sign-off Dec 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit #30-a: bathroom remodel only. replace fixtures and tile. no walls to be removedDetails
unit #30-a: bathroom remodel only. replace fixtures and tile. no walls to be removed | $25,000 |
| Jul 23, 2021 | Never finaled filed Jul 2021, never issued | 1369 Hyde St | add 16 adus per ordinance 162-16 at first and second floor levels and storage areas within the existing bldg envelope. (e) bldg is (71) residential dwelling units (13) guest rooms and 5 unwarrented units. (e) unit a legalization under separate permit.Details
add 16 adus per ordinance 162-16 at first and second floor levels and storage areas within the existing bldg envelope. (e) bldg is (71) residential dwelling units (13) guest rooms and 5 unwarrented units. (e) unit a legalization under separate permit. | $950,000 | |
| Jul 2, 2021 | Completed final sign-off Aug 2021 | 1369 Hyde St | Ps2 Inc | unit 17a: revise permit: 202101223188: 202101223191: 202101223190: remove kitchen from permit scope.Details
unit 17a: revise permit: 202101223188: 202101223191: 202101223190: remove kitchen from permit scope. | |
| Jun 15, 2021 | Completed final sign-off Feb 2022 | 1369 Hyde St | Brighter Bay Builders Inc | apt 16: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a.Details
apt 16: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a. | $15,000 |
| Jun 15, 2021 | Completed final sign-off Jan 2022 | 1369 Hyde St | Brighter Bay Builders Inc | apt 66: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a.Details
apt 66: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a. | $15,000 |
| Jun 15, 2021 | Completed final sign-off Jan 2022 | 1369 Hyde St | Brighter Bay Builders Inc | apt 25: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a.Details
apt 25: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a. | $15,000 |
| Jun 14, 2021 | Completed final sign-off Feb 2022 | 1369 Hyde St | Brighter Bay Builders Inc | renovate (e) unit 6; relocate kitchen and bath, install washer/dryer, and expand unit into corridor, relocate unit entrance.Details
renovate (e) unit 6; relocate kitchen and bath, install washer/dryer, and expand unit into corridor, relocate unit entrance. | $15,000 |
| Jun 7, 2021 | Never finaled issued Jul 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit #15 - 1st flr: renovate (1) existing dwelling unit within an existing bldg at first fl. renovation scope includes remodeling (e) kitchen & bath, installing washer/dryer and converting (e) living to bedroom. must comply w/sffc 1103.7.6.1. fire alarm under sep permit.Details
unit #15 - 1st flr: renovate (1) existing dwelling unit within an existing bldg at first fl. renovation scope includes remodeling (e) kitchen & bath, installing washer/dryer and converting (e) living to bedroom. must comply w/sffc 1103.7.6.1. fire alarm under sep permit. | $60,000 |
| Apr 20, 2021 | Never finaled issued Apr 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit #65: rehabilitate existing 1 bath & 1 kitchen. no change to layout of walls & openings.Details
unit #65: rehabilitate existing 1 bath & 1 kitchen. no change to layout of walls & openings. | $35,000 |
| Apr 20, 2021 | Never finaled issued Apr 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit #60: rehabilitate existing 1 bath & 1 kitchen. no change to layout of walls & openings.Details
unit #60: rehabilitate existing 1 bath & 1 kitchen. no change to layout of walls & openings. | $35,000 |
| Apr 12, 2021 | Completed final sign-off Jun 2021 | 1369 Hyde St | Brighter Bay Builders Inc | install all electric ventless stackable washer and dryer at existing closet.Details
install all electric ventless stackable washer and dryer at existing closet. | $6,000 |
| Apr 8, 2021 | Completed final sign-off Nov 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit 17 - install new ventless washer and dryer at existing closetDetails
unit 17 - install new ventless washer and dryer at existing closet | $6,000 |
| Apr 8, 2021 | Never finaled issued May 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit 60 - rehabilitate existing kitchen (1) and bathroom (1) install new ventless stackable washer and dryer at existing closetDetails
unit 60 - rehabilitate existing kitchen (1) and bathroom (1) install new ventless stackable washer and dryer at existing closet | $35,000 |
| Apr 6, 2021 | Never finaled issued Apr 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit 73 - install electrical ventless washer/ dryer at existing closetDetails
unit 73 - install electrical ventless washer/ dryer at existing closet | $6,000 |
| Apr 6, 2021 | Never finaled issued Apr 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit 15 - install electrical ventless washer/ dryer at existing closetDetails
unit 15 - install electrical ventless washer/ dryer at existing closet | $6,000 |
| Apr 5, 2021 | Completed final sign-off Jun 2021 | 1369 Hyde St | Brighter Bay Builders Inc | #64: install ventless stackable washer and dryer at existing closet.Details
#64: install ventless stackable washer and dryer at existing closet. | $6,000 |
| Apr 5, 2021 | Never finaled issued Jun 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit 65: rehabilitate existing kitchen (1) & bathroom (1).install new ventless stackable washer dryer at e closetDetails
unit 65: rehabilitate existing kitchen (1) & bathroom (1).install new ventless stackable washer dryer at e closet | $35,000 |
| Mar 26, 2021 | Completed final sign-off Jun 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit 61: rehabilitate (1)(e) bathroom, (1) kitchen, no new wall, no (e) wall relocation, new plumbing fixtures remain @ same location, new lighting to comply w/cec150-0(1c)3 & (1c)5Details
unit 61: rehabilitate (1)(e) bathroom, (1) kitchen, no new wall, no (e) wall relocation, new plumbing fixtures remain @ same location, new lighting to comply w/cec150-0(1c)3 & (1c)5 | $35,000 |
| Mar 26, 2021 | Never finaled issued Mar 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit 15: rehabilitate (1)(e) bathroom, (1) kitchen, no new wall, no (e) wall relocation, new plumbing fixtures remain @ same location, new lighting to comply w/cec150-0(1c)3 & (1c)5Details
unit 15: rehabilitate (1)(e) bathroom, (1) kitchen, no new wall, no (e) wall relocation, new plumbing fixtures remain @ same location, new lighting to comply w/cec150-0(1c)3 & (1c)5 | $35,000 |
| Mar 22, 2021 | Completed final sign-off Nov 2021 | 1369 Hyde St | Brighter Bay Builders Inc | #17: rehabilitate existing bathroom & kitchen. (in kind)Details
#17: rehabilitate existing bathroom & kitchen. (in kind) | $35,000 |
| Mar 2, 2021 | Completed final sign-off Sep 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit #50:rehabilitate existing bath & kitchen.install washer & dryer into (e) kitchen pantry. no change to wall & opening layout.Details
unit #50:rehabilitate existing bath & kitchen.install washer & dryer into (e) kitchen pantry. no change to wall & opening layout. | $35,000 |
| Mar 2, 2021 | Completed final sign-off Oct 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit #28:rehabilitate existing bath & kitchen.install washer & dryer into (e) kitchen pantry. no change to wall & opening layout.Details
unit #28:rehabilitate existing bath & kitchen.install washer & dryer into (e) kitchen pantry. no change to wall & opening layout. | $35,000 |
| Mar 2, 2021 | Completed final sign-off Aug 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit #54:rehabilitate existing bath & kitchen.install washer & dryer into (e) kitchen pantry. no change to wall & opening layout.Details
unit #54:rehabilitate existing bath & kitchen.install washer & dryer into (e) kitchen pantry. no change to wall & opening layout. | $35,000 |
| Mar 2, 2021 | Never finaled issued Mar 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit #67:rehabilitate existing bath & kitchen.install washer & dryer into (e) kitchen pantry. no change to wall & opening layout.Details
unit #67:rehabilitate existing bath & kitchen.install washer & dryer into (e) kitchen pantry. no change to wall & opening layout. | $35,000 |
| Mar 2, 2021 | Completed final sign-off Nov 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit #55:rehabilitate existing bath & kitchen.install washer & dryer into (e) kitchen pantry. no change to wall & opening layout.Details
unit #55:rehabilitate existing bath & kitchen.install washer & dryer into (e) kitchen pantry. no change to wall & opening layout. | $35,000 |
| Feb 26, 2021 | Completed final sign-off Nov 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit #37: rehabilitate existing bath & kitchen. install washer & dryer (no moving walls)Details
unit #37: rehabilitate existing bath & kitchen. install washer & dryer (no moving walls) | $35,000 |
| Feb 26, 2021 | Completed final sign-off Sep 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit #30: rehabilitae existing bath & kitchen. install washer/dryer (no moving walls)Details
unit #30: rehabilitae existing bath & kitchen. install washer/dryer (no moving walls) | $35,000 |
| Feb 26, 2021 | Completed final sign-off Oct 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit 24: rehabilitate (e) one bathroom and one kitchen. install washer and dryer at same location. no new wal and no (e) wall relocation. all plumbing fixtures remain at same location. new lighting shall comply with oec unit 25: 150.0(k)3 and (k)5.Details
unit 24: rehabilitate (e) one bathroom and one kitchen. install washer and dryer at same location. no new wal and no (e) wall relocation. all plumbing fixtures remain at same location. new lighting shall comply with oec unit 25: 150.0(k)3 and (k)5. | $35,000 |
| Feb 26, 2021 | Never finaled issued Feb 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit 25: rehabilitate (e) one bathroom and one kitchen. install washer and dryer at same location. no new wal and no (e) wall relocation. all plumbing fixtures remain at same location. new lighting shall comply with oec unit 25: 150.0(k)3 and (k)5.Details
unit 25: rehabilitate (e) one bathroom and one kitchen. install washer and dryer at same location. no new wal and no (e) wall relocation. all plumbing fixtures remain at same location. new lighting shall comply with oec unit 25: 150.0(k)3 and (k)5. | $35,000 |
| Feb 26, 2021 | Never finaled issued Feb 2021, no final | 1369 Hyde St | Brighter Bay Builders Inc | unit 1: rehabilitate (e) one bathroom and one kitchen. install washer and dryer at same location. no new wal and no (e) wall relocation. all plumbing fixtures remain at same location. new lighting shall comply with oec unit 25: 150.0(k)3 and (k)5.Details
unit 1: rehabilitate (e) one bathroom and one kitchen. install washer and dryer at same location. no new wal and no (e) wall relocation. all plumbing fixtures remain at same location. new lighting shall comply with oec unit 25: 150.0(k)3 and (k)5. | $35,000 |
| Feb 26, 2021 | Completed final sign-off Sep 2021 | 1369 Hyde St | Brighter Bay Builders Inc | unit #45:rehabilitate existing bath & kitchen.install washer & dryer (no moving walls)Details
unit #45:rehabilitate existing bath & kitchen.install washer & dryer (no moving walls) | $35,000 |
| Feb 12, 2021 | Expired or cancelled cancelled Nov 2024 | 1369 Hyde St | Ps2 Inc | apt 56a: rev to pa202101223191: demolish (e) non-load bearing wall and ktichen cabinets. install (n) wood stud wall and compact combo kitchentte unit as shown on plans betwen kitchentt & bathroom.Details
apt 56a: rev to pa202101223191: demolish (e) non-load bearing wall and ktichen cabinets. install (n) wood stud wall and compact combo kitchentte unit as shown on plans betwen kitchentt & bathroom. | $1,000 |
| Feb 12, 2021 | Expired or cancelled cancelled Nov 2024 | 1369 Hyde St | Ps2 Inc | apt 17a: rev to pa202101223188: demolish (e) non-load bearing wall and ktichen cabinets. install (n) wood stud wall and compact combo kitchentte unit as shown on plans betwen kitchentt & bathroom.Details
apt 17a: rev to pa202101223188: demolish (e) non-load bearing wall and ktichen cabinets. install (n) wood stud wall and compact combo kitchentte unit as shown on plans betwen kitchentt & bathroom. | $1,000 |
| Jan 22, 2021 | Expired or cancelled suspend Apr 2021 | 1369 Hyde St | Ps2 Inc | apt 56a: install new combo one piece kitchen.remove/replace switches.receptacles and light fixtures (to be high efficency), run new plumbing sink drain, install (3) new receptacles,Details
apt 56a: install new combo one piece kitchen.remove/replace switches.receptacles and light fixtures (to be high efficency), run new plumbing sink drain, install (3) new receptacles, | $35,000 |
| Jan 22, 2021 | Completed final sign-off Mar 2021 | 1369 Hyde St | Ps2 Inc | apt 10a: install new combo one piece kitchen.remove/replace switches.receptacles and light fixtures (to be high efficency), run new plumbing sink drain, install (3) new receptacles,Details
apt 10a: install new combo one piece kitchen.remove/replace switches.receptacles and light fixtures (to be high efficency), run new plumbing sink drain, install (3) new receptacles, | $35,000 |
| Jan 22, 2021 | Expired or cancelled suspend Apr 2021 | 1369 Hyde St | Ps2 Inc | apt 40a: install new combo one piece kitchen.remove/replace switches.receptacles and light fixtures (to be high efficency), run new plumbing sink drain, install (3) new receptacles,Details
apt 40a: install new combo one piece kitchen.remove/replace switches.receptacles and light fixtures (to be high efficency), run new plumbing sink drain, install (3) new receptacles, | $35,000 |
| Jan 22, 2021 | Expired or cancelled suspend Apr 2021 | 1369 Hyde St | Ps2 Inc | apt 17a: install new combo one piece kitchen.remove/replace switches.receptacles and light fixtures (to be high efficency), run new plumbing sink drain, install (3) new receptacles,Details
apt 17a: install new combo one piece kitchen.remove/replace switches.receptacles and light fixtures (to be high efficency), run new plumbing sink drain, install (3) new receptacles, | $35,000 |
| Jan 22, 2021 | Completed final sign-off Mar 2021 | 1369 Hyde St | Ps2 Inc | apt 20a: install new combo one piece kitchen.remove/replace switches.receptacles and light fixtures (to be high efficency), run new plumbing sink drain, isntall (3) new receptacles,Details
apt 20a: install new combo one piece kitchen.remove/replace switches.receptacles and light fixtures (to be high efficency), run new plumbing sink drain, isntall (3) new receptacles, | $35,000 |
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 1369 Hyde St | street space onlyDetails
street space only | ||
| Jun 26, 2018 | Never finaled issued Jun 2018, no final | 1369 Hyde St | street spaceDetails
street space | ||
| Apr 25, 2018 | Never finaled issued Apr 2018, no final | 1369 Hyde St | street spaceDetails
street space | ||
| Mar 30, 2018 | Never finaled issued Mar 2018, no final | 1369 Hyde St | street spaceDetails
street space | ||
| Mar 21, 2018 | Completed final sign-off Aug 2018 | 1369 Hyde St | Tabernus Service Company | unit 64: revison to pa# 201801229173. bathroom remodel: tiled shower walls, medicine cabinets & vanity. sub contract electrical: gfi, occupancy sensor & can lights (2) sub contract plumbing: shower valve, toilet, sink, faucet & supply line and angle stops. maintain fire-rating on shower walls.Details
unit 64: revison to pa# 201801229173. bathroom remodel: tiled shower walls, medicine cabinets & vanity. sub contract electrical: gfi, occupancy sensor & can lights (2) sub contract plumbing: shower valve, toilet, sink, faucet & supply line and angle stops. maintain fire-rating on shower walls. | $10,000 |
| Jan 22, 2018 | Completed final sign-off Aug 2018 | 1369 Hyde St | Tabernus Service Company | unit 64: kitchen cabinets & countertops, subcontract light fixtures & vent fan & gfi/outlets subcontract sink faucet & angle stops.Details
unit 64: kitchen cabinets & countertops, subcontract light fixtures & vent fan & gfi/outlets subcontract sink faucet & angle stops. | $21,000 |
| Nov 8, 2017 | Never finaled issued Nov 2017, no final | 1369 Hyde St | Architectural Fenestration & Restoration | replace 42 windows on sw corner units with new wood dbl hung windows in orginal like and type, current windows are previously replaced aluminum. no change to orignal openings. non-street visible. max u-factor 0.32.Details
replace 42 windows on sw corner units with new wood dbl hung windows in orginal like and type, current windows are previously replaced aluminum. no change to orignal openings. non-street visible. max u-factor 0.32. | $27,500 |
| May 10, 2017 | Completed final sign-off Jan 2018 | 1369 Hyde St | Velox Construction | unit #71: upgrade plumbing and electrical. remodel 2 bathrooms and 1 kitchen. in kind.Details
unit #71: upgrade plumbing and electrical. remodel 2 bathrooms and 1 kitchen. in kind. | $62,000 |
| Feb 16, 2017 | Never finaled issued Feb 2017, no final | 1369 Hyde St | J E Builder General Contractor | apt 54: remove plaster at walls & ceiling in 2 bedrooms, 1 closet. replace with sheetrock 5/8in type x.Details
apt 54: remove plaster at walls & ceiling in 2 bedrooms, 1 closet. replace with sheetrock 5/8in type x. | $3,000 |
| Feb 15, 2017 | Expired or cancelled cancelled Jan 2026 | 1369 Hyde St | remove plaster walls & ceiling at bedroom, replace with sheetrock (2 bedrooms).Details
remove plaster walls & ceiling at bedroom, replace with sheetrock (2 bedrooms). | $3,000 | |
| Feb 9, 2015 | Never finaled issued Feb 2015, no final | 1369 Hyde St | Protection Roofing Co, | reroofingDetails
reroofing | $8,500 |
| Apr 5, 2006 | Completed final sign-off Dec 2006 | 1369 Hyde St | bath: replace all fixtures with new fixtures at (e) locations, new gfi outlet, new wall & floor coverings, kitchen: replace cabinets, new fixtures, in same location, new wall & floor covering, new gfi outlets.Details
bath: replace all fixtures with new fixtures at (e) locations, new gfi outlet, new wall & floor coverings, kitchen: replace cabinets, new fixtures, in same location, new wall & floor covering, new gfi outlets. | $14,500 | |
| May 22, 2003 | Completed final sign-off Jun 2003 | 1369 Hyde St | replacing & renewing a framed glass panel in doorway opening.Details
replacing & renewing a framed glass panel in doorway opening. | $4,000 | |
| Nov 13, 2002 | Never finaled issued Nov 2002, no final | 1369 Hyde St | sidewalk repairDetails
sidewalk repair | ||
| Jan 4, 2001 | Expired or cancelled withdrawn May 2009 | 1369 Hyde St | replacement of existing roof screen. replacement in kind. comply w/ nov199928610 (hid)Details
replacement of existing roof screen. replacement in kind. comply w/ nov199928610 (hid) | $40,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.