Block 3709, lot 017
425 Market St
- City’s use
- Commercial Office
- Built
- 1973
- Stories
- 38
- Rooms
- 74 bathrooms
- Building
- 996,760 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
138 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 3, 2026 | Completed final sign-off Feb 2026 | 425 Market St | Thomas Swan Sign Co Inc | install evacuation maps on 18th/fDetails
install evacuation maps on 18th/f | $2,000 |
| Aug 31, 2023 | Completed final sign-off Dec 2023 | 425 Market St | Anderson, Rowe & Buckley, Inc. | existing fire sprinlker system, tenant improvements. relocate 165 pendents, 42 pendents,relocate 4 uprights sprinlkersDetails
existing fire sprinlker system, tenant improvements. relocate 165 pendents, 42 pendents,relocate 4 uprights sprinlkers | $132,000 |
| Jan 29, 2020 | Expired or cancelled withdrawn Jun 2024 | 425 Market St | 2/f -interior demo of non structural elements including finishes, partitoins. new power data on e partitions, elec deferred submittal. no mech work no exterior building, site, landscape, use or parking changesDetails
2/f -interior demo of non structural elements including finishes, partitoins. new power data on e partitions, elec deferred submittal. no mech work no exterior building, site, landscape, use or parking changes | $650,000 | |
| Mar 10, 2016 | Completed final sign-off Jun 2016 | 425 Market St | Fisher Development Inc | revision to pa 2015-1209-4552 interior improvements of an (e) office space on the 19th floor. installation of new walls, finishes and mechanical, electrical, plumbing and accessibility upgrades. maher naDetails
revision to pa 2015-1209-4552 interior improvements of an (e) office space on the 19th floor. installation of new walls, finishes and mechanical, electrical, plumbing and accessibility upgrades. maher na | $30,000 |
| Nov 19, 2015 | Completed final sign-off Dec 2015 | 425 Market St | Fisher Development Inc | 19th flr: demolition and removal of existing offices including ceilings and partitions of the 19th flr; maher n/a. demolition complies with sfbc ab-017. full accessibility to building will be filed under future t.i. permit.Details
19th flr: demolition and removal of existing offices including ceilings and partitions of the 19th flr; maher n/a. demolition complies with sfbc ab-017. full accessibility to building will be filed under future t.i. permit. | $100,000 |
| Mar 30, 2015 | Never finaled issued Mar 2015, no final | 425 Market St | Bcci Construction Company | revision to app#201412234360 to provide 9 addtional duct smoke detector at fan coil units. n/a for the maher.Details
revision to app#201412234360 to provide 9 addtional duct smoke detector at fan coil units. n/a for the maher. | $14,500 |
| Mar 27, 2015 | Completed final sign-off Sep 2015 | 425 Market St | Ayoob & Peery Plumbing Co Inc | grnd flr: plug 4 sprinkler, add 5 sprinkler and relocate 14 sprinkler. referenced ti 2015.0126.6675 under 28 fremont.Details
grnd flr: plug 4 sprinkler, add 5 sprinkler and relocate 14 sprinkler. referenced ti 2015.0126.6675 under 28 fremont. | $9,766 |
| Mar 3, 2015 | Completed final sign-off Mar 2015 | 425 Market St | fire sprinkler relocate 188 pendents, add 12 pendents, delete 3 uprights; t.i. 201412234360; maher n/aDetails
fire sprinkler relocate 188 pendents, add 12 pendents, delete 3 uprights; t.i. 201412234360; maher n/a | $102,800 | |
| Feb 24, 2015 | Completed final sign-off Jan 2016 | 425 Market St | Novo Construction Inc | emergency evacuation signage 4 signs 17th floor. ref app#201502178477. n/a for maherDetails
emergency evacuation signage 4 signs 17th floor. ref app#201502178477. n/a for maher | $500 |
| Jan 28, 2015 | Completed final sign-off Feb 2015 | 425 Market St | Golden Gate Fire Protection Inc | relocate 6 pendent sprinkler heads on level b2, t.i. pa#201409226970. n/a ordinance #155-13Details
relocate 6 pendent sprinkler heads on level b2, t.i. pa#201409226970. n/a ordinance #155-13 | $3,090 |
| Dec 23, 2014 | Completed final sign-off Jul 2015 | 425 Market St | Bcci Construction Company | tenant improvement:demolish & install rated doors & frames,storefront offices,finishes @ floor,walls & ceiling.toilet room upgrades, mep.(13) vav boxes, (19) fan coil units, duct distribution added/modified.(4)transfer air fans,(1)new fsd @lobby-doors in recpt,fire alarm & sprinklers separate permitDetails
tenant improvement:demolish & install rated doors & frames,storefront offices,finishes @ floor,walls & ceiling.toilet room upgrades, mep.(13) vav boxes, (19) fan coil units, duct distribution added/modified.(4)transfer air fans,(1)new fsd @lobby-doors in recpt,fire alarm & sprinklers separate permit | $900,000 |
| Sep 4, 2014 | Never finaled issued Oct 2014, no final | 425 Market St | Source Planning And Construction Inc | #950- this project involves modification and expansion of existing tenant suite to include selective demolition of demising partition and construction of new office, doors & frames and new finishes. f/a & spinkler under separate permit. compliance with maher ordinance no 155-13 not required.Details
#950- this project involves modification and expansion of existing tenant suite to include selective demolition of demising partition and construction of new office, doors & frames and new finishes. f/a & spinkler under separate permit. compliance with maher ordinance no 155-13 not required. | $20,000 |
| Nov 21, 2013 | Completed final sign-off Jun 2015 | 425 Market St | Skanska Usa Building Inc | relocate existing water cooled crac unit from level 19 to 20. provide connection to existing condense water system and existing ductwork. relocate existing data racks to level 20. new power distribtion for racks and relocate hvac. extend existing epo to include relocated equipment.no lighting,partitDetails
relocate existing water cooled crac unit from level 19 to 20. provide connection to existing condense water system and existing ductwork. relocate existing data racks to level 20. new power distribtion for racks and relocate hvac. extend existing epo to include relocated equipment.no lighting,partit | $250,000 |
| Mar 27, 2013 | Completed final sign-off Dec 2013 | 425 Market St | Ayoob & Peery Plumbing Co Inc | add, relocate & remove fire sprinkler heads per t.i. 14th floor: 10 relo, 14 lowered, 3 removed, ref pa# 201212206603 15th fl: 2 add, 188 relo, 8 remove, ref pa# 201212206607Details
add, relocate & remove fire sprinkler heads per t.i. 14th floor: 10 relo, 14 lowered, 3 removed, ref pa# 201212206603 15th fl: 2 add, 188 relo, 8 remove, ref pa# 201212206607 | $102,800 |
| Dec 4, 2012 | Never finaled issued Dec 2012, no final | 425 Market St | Acco Engineered Systems Inc. Dba Acco En | 5th floor - install (1) water source heat pump & piping.Details
5th floor - install (1) water source heat pump & piping. | $60,000 |
| Jun 1, 2012 | Completed final sign-off Dec 2012 | 425 Market St | Turner Construction Co | revision to 201202164279. interior tenant improvement. revision includes construction of new doors.Details
revision to 201202164279. interior tenant improvement. revision includes construction of new doors. | $35,000 |
| May 31, 2012 | Completed final sign-off Dec 2012 | 425 Market St | Turner Construction Co | 11th floor. structural work for server room. equipment anchorage ref to pa#201202164279 and 201203015160 crack units on separate permit.Details
11th floor. structural work for server room. equipment anchorage ref to pa#201202164279 and 201203015160 crack units on separate permit. | $2,000 |
| Mar 1, 2012 | Completed final sign-off Dec 2012 | 425 Market St | Turner Construction Co | 11th floor-refer to arch pa# 2012-0216-4279-work is mechanical & electricalDetails
11th floor-refer to arch pa# 2012-0216-4279-work is mechanical & electrical | $1,150,000 |
| Feb 16, 2012 | Completed final sign-off Dec 2012 | 425 Market St | Turner Construction Co | 11th floor:interior tenant improvement. construction of new open office, offices, conferance rooms and break area. new finishes throughout 11th floor. mep and fire life safety under seperate permit.Details
11th floor:interior tenant improvement. construction of new open office, offices, conferance rooms and break area. new finishes throughout 11th floor. mep and fire life safety under seperate permit. | $2,200,000 |
| Jun 20, 2011 | Completed final sign-off Apr 2012 | 425 Market St | Ayoob & Peery Plumbing Co Inc | relocate extg butterfly valve one, and check valve one, fire sprinkler system.Details
relocate extg butterfly valve one, and check valve one, fire sprinkler system. | $8,455 |
| Jul 23, 2010 | Completed final sign-off Jul 2010 | 425 Market St | Paganini Electric Corp(See Signatories) | fire alarm system on the 16th floor. as built submission as part of pa# 2010.05.20.2905. 11 speakers, 9 strobes, 2 duct detectors and 1 relay deviceDetails
fire alarm system on the 16th floor. as built submission as part of pa# 2010.05.20.2905. 11 speakers, 9 strobes, 2 duct detectors and 1 relay device | |
| Sep 17, 2009 | Completed final sign-off Dec 2009 | 425 Market St | Lewis M Merlo Inc | repair craked topping slab on driveway. no work on actual building at fremont street.Details
repair craked topping slab on driveway. no work on actual building at fremont street. | $10,000 |
| Dec 8, 2006 | Completed final sign-off Sep 2007 | 425 Market St | business name: hq, oti-1, 22nd floor, el, ls, sp.Details
business name: hq, oti-1, 22nd floor, el, ls, sp. | $13,580 | |
| Jun 28, 2006 | Completed final sign-off May 2007 | 425 Market St | fire alarm on 25th floorDetails
fire alarm on 25th floor | $7,000 | |
| Jun 21, 2006 | Completed final sign-off Oct 2006 | 425 Market St | Western Roofing Service | reroofingDetails
reroofing | $430,000 |
| Apr 24, 2006 | Completed final sign-off May 2007 | 425 Market St | t.i. demolition - construction, electrical, plumbing (tenant improvement). asbestos abatement removal. restore fire proofing to structure.Details
t.i. demolition - construction, electrical, plumbing (tenant improvement). asbestos abatement removal. restore fire proofing to structure. | $500,000 | |
| Mar 14, 2006 | Completed final sign-off Jul 2006 | 425 Market St | Cb Bovenkamp Inc. | interior remodel of an (e) retail space on groundfloorDetails
interior remodel of an (e) retail space on groundfloor | $150,000 |
| Nov 30, 2005 | Never finaled issued Nov 2005, no final | 425 Market St | Bcci Construction Company | revise permit no 200507208585- delete from the special inspection & structural observation the following- fillet welds; metal dock; ndt; fire proofing; bolts in existing concrete; and pull/torque testingDetails
revise permit no 200507208585- delete from the special inspection & structural observation the following- fillet welds; metal dock; ndt; fire proofing; bolts in existing concrete; and pull/torque testing | |
| Nov 22, 2005 | Completed final sign-off Jun 2006 | 425 Market St | Cupertino Electric Inc. | add 1 fsd fire smoke damper one duct detectorDetails
add 1 fsd fire smoke damper one duct detector | $500 |
| Oct 7, 2005 | Completed final sign-off Apr 2006 | 425 Market St | Richlen Construction | oti-2 7th floor=el, me, sp medhanical, electrical & sprinklerDetails
oti-2 7th floor=el, me, sp medhanical, electrical & sprinkler | $75,000 |
| Sep 22, 2005 | Completed final sign-off Jan 2007 | 425 Market St | Bcci Construction Company | life safety work on floor 24 including 2 smoke detectors 1 duct smoke detector 40 speakers and 58Details
life safety work on floor 24 including 2 smoke detectors 1 duct smoke detector 40 speakers and 58 | $50,500 |
| Aug 29, 2005 | Completed final sign-off Dec 2005 | 425 Market St | Novo Construction Inc | card access system interface to fire safety system for drop out of evacuation rootes of 4th & 5th flDetails
card access system interface to fire safety system for drop out of evacuation rootes of 4th & 5th fl | $30,000 |
| Jul 27, 2005 | Completed final sign-off Sep 2006 | 425 Market St | Bcci Construction Company | oti-2, 24th fl el, me.Details
oti-2, 24th fl el, me. | $312,000 |
| Jul 27, 2005 | Completed final sign-off Jan 2007 | 425 Market St | Bcci Construction Company | oti2, 25th fl, el, me.Details
oti2, 25th fl, el, me. | $304,000 |
| Jul 18, 2005 | Completed final sign-off Sep 2006 | 425 Market St | Bcci Construction Company | oti -1 el,me, ls, sp (24th fl)Details
oti -1 el,me, ls, sp (24th fl) | $625,000 |
| Jul 8, 2005 | Completed final sign-off Oct 2005 | 425 Market St | Anderson, Rowe & Buckley, Inc. | existing spkr system buildout, 202 new spkrs, no increase, 20,200sfDetails
existing spkr system buildout, 202 new spkrs, no increase, 20,200sf | $40,000 |
| Apr 28, 2005 | Completed final sign-off Oct 2005 | 425 Market St | Hcbeck, Ltd. | oti 2 (21st fl) el, meDetails
oti 2 (21st fl) el, me | $1,078,124 |
| Apr 28, 2005 | Completed final sign-off Oct 2005 | 425 Market St | Hcbeck, Ltd. | oti-1 (21st fl.) el, me, ls, spDetails
oti-1 (21st fl.) el, me, ls, sp | $737,163 |
| Apr 22, 2005 | Completed final sign-off Jun 2005 | 425 Market St | Hcbeck, Ltd. | provide an additional 12 cabinets to the (e) recently constructed lan-room. provide additional powerDetails
provide an additional 12 cabinets to the (e) recently constructed lan-room. provide additional power | $200,000 |
| Mar 10, 2005 | Completed final sign-off Apr 2005 | 425 Market St | Skyline Construction | revision to 200404262277 to show as built conditionDetails
revision to 200404262277 to show as built condition | $12,000 |
| Mar 10, 2005 | Completed final sign-off Apr 2005 | 425 Market St | Skyline Construction | renewal of permit application 200404262277 for final inpsection onlyDetails
renewal of permit application 200404262277 for final inpsection only | |
| Mar 2, 2005 | Completed final sign-off Nov 2005 | 425 Market St | Dpw Inc. | install new branch line and sprinkler head coverage on 4th & 5th floors per approved plan. sprinklerDetails
install new branch line and sprinkler head coverage on 4th & 5th floors per approved plan. sprinkler | $75,000 |
| Mar 1, 2005 | Completed final sign-off Nov 2005 | 425 Market St | Metropolitan Electrical Construction | upgrade 4th & 5th floor to the new life safety system.Details
upgrade 4th & 5th floor to the new life safety system. | $73,578 |
| Feb 24, 2005 | Completed final sign-off Sep 2005 | 425 Market St | Hathaway Dinwiddie Co. | oti-3, 33rd floor, sp.Details
oti-3, 33rd floor, sp. | $2,000 |
| Dec 22, 2004 | Completed final sign-off Nov 2005 | 425 Market St | Novo Construction Inc | oti-1 5/f el me ls spDetails
oti-1 5/f el me ls sp | $200,000 |
| Dec 22, 2004 | Completed final sign-off Nov 2005 | 425 Market St | Novo Construction Inc | oti-1 4/f el me ls spDetails
oti-1 4/f el me ls sp | $200,000 |
| Dec 15, 2004 | Expired or cancelled expired Aug 2006 | 425 Market St | Anderson, Rowe & Buckley, Inc. | existing sprinkler system expansion 11 new sprinklers (stair, mech. room. & temporary storage)Details
existing sprinkler system expansion 11 new sprinklers (stair, mech. room. & temporary storage) | $4,500 |
| Dec 15, 2004 | Completed final sign-off Aug 2005 | 425 Market St | R.M.R. Construction Company | deomolition of all interior partitions/finishes and ceiling/add demolition at shafts and perimeterDetails
deomolition of all interior partitions/finishes and ceiling/add demolition at shafts and perimeter | $500,000 |
| Dec 6, 2004 | Completed final sign-off Sep 2005 | 425 Market St | Hathaway Dinwiddie Co. | oti-3, 34th floor, ls.Details
oti-3, 34th floor, ls. | $74,000 |
| Sep 8, 2004 | Completed final sign-off Jan 2005 | 425 Market St | Richlen Construction | rev#200403239355. to elimate plan check requirement to reverse door swing @ stair#2. firemains vestiDetails
rev#200403239355. to elimate plan check requirement to reverse door swing @ stair#2. firemains vesti | |
| Sep 2, 2004 | Completed final sign-off Dec 2004 | 425 Market St | Skyline Construction | life safety workDetails
life safety work | $5,000 |
| Aug 25, 2004 | Completed final sign-off Jan 2005 | 425 Market St | Skyline Construction | renew of app#200401154171 tio complet the work.Details
renew of app#200401154171 tio complet the work. | $8,000 |
| Aug 24, 2004 | Completed final sign-off Mar 2005 | 425 Market St | Metropolitan Electrical Construction | upgrade the 9th floor to the new life safety systemDetails
upgrade the 9th floor to the new life safety system | $53,400 |
| Aug 17, 2004 | Completed final sign-off May 2005 | 425 Market St | Hcbeck, Ltd. | oti-1 20/f el me ls spDetails
oti-1 20/f el me ls sp | $600,000 |
| Aug 17, 2004 | Completed final sign-off May 2005 | 425 Market St | Hcbeck, Ltd. | oti-2 20/f el meDetails
oti-2 20/f el me | $900,000 |
| Aug 12, 2004 | Completed final sign-off Dec 2004 | 425 Market St | Skyline Construction | 8 sprinkler heads to be relocated. no incresae in office space @ 27th floor only.Details
8 sprinkler heads to be relocated. no incresae in office space @ 27th floor only. | $2,000 |
| Aug 6, 2004 | Expired or cancelled expired Apr 2006 | 425 Market St | Hathaway Dinwiddie Co. | construction of tenant convenience stair between 33rd and 34/f 10 slab openings to accommodateDetails
construction of tenant convenience stair between 33rd and 34/f 10 slab openings to accommodate | $300,000 |
| Aug 4, 2004 | Completed final sign-off Mar 2005 | 425 Market St | oti-2 5th floor el, meDetails
oti-2 5th floor el, me | $123,000 | |
| Aug 4, 2004 | Completed final sign-off Mar 2005 | 425 Market St | oti-2, 4th floor, el, meDetails
oti-2, 4th floor, el, me | $133,000 | |
| Aug 4, 2004 | Completed final sign-off Jun 2005 | 425 Market St | oti-1, 4th floor, el, me, ls, spDetails
oti-1, 4th floor, el, me, ls, sp | $90,000 | |
| Jul 28, 2004 | Expired or cancelled expired Aug 2006 | 425 Market St | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work on 37th fl.Details
provide tenant fire protection work on 37th fl. | $65,000 |
| Jun 24, 2004 | Completed final sign-off Jan 2005 | 425 Market St | Richlen Construction | oti-3 at 20th fl, ls,spDetails
oti-3 at 20th fl, ls,sp | $113,000 |
| Jun 23, 2004 | Completed final sign-off Jan 2005 | 425 Market St | Skyline Construction | oti-1 rv ls sp 27/fDetails
oti-1 rv ls sp 27/f | $8,000 |
| Jun 22, 2004 | Completed final sign-off Sep 2005 | 425 Market St | Hathaway Dinwiddie Co. | oti-2, 34th floor, el, meDetails
oti-2, 34th floor, el, me | $920,000 |
| Jun 21, 2004 | Completed final sign-off Mar 2005 | 425 Market St | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work 9th floor 2 new, 1 relocateDetails
provide tenant fire protection work 9th floor 2 new, 1 relocate | $1,500 |
| Jun 8, 2004 | Completed final sign-off Jun 2005 | 425 Market St | R.M.R. Construction Company | oti-1 office tenant improvement/alterations and restroom upgrade per 20% requirtDetails
oti-1 office tenant improvement/alterations and restroom upgrade per 20% requirt | $48,000 |
| May 13, 2004 | Completed final sign-off Sep 2005 | 425 Market St | Hathaway Dinwiddie Co. | demo work on 34th floor. demo as per ab017-sfbc.Details
demo work on 34th floor. demo as per ab017-sfbc. | $100,000 |
| Apr 8, 2004 | Expired or cancelled expired Jun 2006 | 425 Market St | Hathaway Dinwiddie Co. | oti-1 revised 32/f el me ls sp | $500 |
| Apr 5, 2004 | Completed final sign-off Jan 2005 | 425 Market St | Richlen Construction | oti-2, el, me, 20th floorDetails
oti-2, el, me, 20th floor | $150,000 |
| Mar 29, 2004 | Expired or cancelled expired Jun 2006 | 425 Market St | Hathaway Dinwiddie Co. | relocate 6 srpinkler heads and associated pipework for 32nd floorDetails
relocate 6 srpinkler heads and associated pipework for 32nd floor | $1,250 |
| Mar 23, 2004 | Completed final sign-off Jan 2005 | 425 Market St | Richlen Construction | oti-1 20th floor el me ls spDetails
oti-1 20th floor el me ls sp | $692,560 |
| Dec 17, 2003 | Completed final sign-off Apr 2004 | 425 Market St | Skyline Construction | to correct description of location of work from 9th to 12th flr for permit app 200312011329-20020129Details
to correct description of location of work from 9th to 12th flr for permit app 200312011329-20020129 | |
| Dec 12, 2003 | Completed final sign-off Feb 2004 | 425 Market St | Skyline Construction | suite #960- relocate 1 sprinkler headDetails
suite #960- relocate 1 sprinkler head | $500 |
| Dec 4, 2003 | Completed final sign-off May 2004 | 425 Market St | Hcbeck, Ltd. | oti-1 17th l = el, me,ls, spDetails
oti-1 17th l = el, me,ls, sp | $620,000 |
| Dec 4, 2003 | Expired or cancelled expired Oct 2006 | 425 Market St | Hcbeck, Ltd. | oti-2 17th l - el me | $380,000 |
| Dec 1, 2003 | Expired or cancelled expired Apr 2004 | 425 Market St | Skyline Construction | renew pa 200201297908, 200201096583& 200111304256Details
renew pa 200201297908, 200201096583& 200111304256 | |
| Nov 3, 2003 | Completed final sign-off Dec 2003 | 425 Market St | to renew app#2003/02/19/7749 for final inspection.Details
to renew app#2003/02/19/7749 for final inspection. | ||
| Oct 27, 2003 | Completed final sign-off Jan 2005 | 425 Market St | Skyline Construction | oti-1 15th fl. el, me, ls, spDetails
oti-1 15th fl. el, me, ls, sp | $65,000 |
| Oct 27, 2003 | Completed final sign-off Aug 2004 | 425 Market St | Skyline Construction | oti-2 15th fl.me, spDetails
oti-2 15th fl.me, sp | $15,000 |
| Oct 27, 2003 | Completed final sign-off Dec 2004 | 425 Market St | Skyline Construction | oti-3 27th fl.meDetails
oti-3 27th fl.me | $45,000 |
| Oct 23, 2003 | Completed final sign-off Oct 2003 | 425 Market St | Hathaway Dinwiddie Co. | renew#9927205 for final onlyDetails
renew#9927205 for final only | |
| Oct 21, 2003 | Completed final sign-off Mar 2005 | 425 Market St | Metropolitan Electrical Construction | upgrade to the new life safety system on the 11/fDetails
upgrade to the new life safety system on the 11/f | $30,975 |
| Oct 21, 2003 | Completed final sign-off Jan 2005 | 425 Market St | Skyline Construction | oti-1 27th floor el me ls spDetails
oti-1 27th floor el me ls sp | $250,000 |
| Oct 21, 2003 | Completed final sign-off Dec 2004 | 425 Market St | Skyline Construction | oti-2 27th floor spDetails
oti-2 27th floor sp | $15,000 |
| Oct 21, 2003 | Completed final sign-off Aug 2004 | 425 Market St | Skyline Construction | oti-2 18th floor me spDetails
oti-2 18th floor me sp | $125,000 |
| Oct 21, 2003 | Completed final sign-off Dec 2004 | 425 Market St | Skyline Construction | oti-1 18th floor el me ls spDetails
oti-1 18th floor el me ls sp | $240,000 |
| Oct 9, 2003 | Completed final sign-off Feb 2004 | 425 Market St | oti-1 9th fl, no oti-2Details
oti-1 9th fl, no oti-2 | $8,000 | |
| Sep 17, 2003 | Completed final sign-off Oct 2003 | 425 Market St | Hathaway Dinwiddie Co. | renew expired appn 20000106367 and 200004036214Details
renew expired appn 20000106367 and 200004036214 | |
| Aug 11, 2003 | Completed final sign-off Mar 2004 | 425 Market St | Metropolitan Electrical Construction | upgrade to the new life safety system for the core area only on the 17/fDetails
upgrade to the new life safety system for the core area only on the 17/f | $21,000 |
| Feb 28, 2003 | Completed final sign-off Oct 2003 | 425 Market St | Metropolitan Electrical Construction | upgrade to new life safety systemDetails
upgrade to new life safety system | $65,000 |
| Feb 19, 2003 | Expired or cancelled expired Dec 2003 | 425 Market St | tenant improvement demolition of (1) partition on 22nd floorDetails
tenant improvement demolition of (1) partition on 22nd floor | $4,100 | |
| Jan 7, 2003 | Expired or cancelled expired Jun 2005 | 425 Market St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler per tenant improvements (8 total at 38th flr)Details
relocate fire sprinkler per tenant improvements (8 total at 38th flr) | $1,900 |
| Oct 9, 2002 | Completed final sign-off Oct 2003 | 425 Market St | Hcbeck, Ltd. | oti-2 28th fl,me,elDetails
oti-2 28th fl,me,el | $20,000 |
| Oct 9, 2002 | Completed final sign-off Oct 2003 | 425 Market St | Hcbeck, Ltd. | oti-1 25th flr,el,me,ls,spDetails
oti-1 25th flr,el,me,ls,sp | $80,000 |
| Jan 9, 2002 | Expired or cancelled expired Apr 2004 | 425 Market St | Skyline Construction | install 8 new hds & relocate 14 existing hds on the 9th flrDetails
install 8 new hds & relocate 14 existing hds on the 9th flr | $8,000 |
| Oct 31, 2001 | Expired or cancelled expired Nov 2003 | 425 Market St | Skyline Construction | 17th floor-non structural demolition of four interior partitions no increase in office spaceDetails
17th floor-non structural demolition of four interior partitions no increase in office space | $8,000 |
| Apr 24, 2001 | Completed final sign-off Aug 2001 | 425 Market St | Field Construction Inc. | oti-2, 13th floor, ltg, mech, sprDetails
oti-2, 13th floor, ltg, mech, spr | $15,500 |
| Mar 29, 2001 | Completed final sign-off Aug 2001 | 425 Market St | Field Construction Inc. | oti-1 13th fl lt mech ls sprDetails
oti-1 13th fl lt mech ls spr | $45,000 |
| Dec 28, 2000 | Expired or cancelled expired Jun 2005 | 425 Market St | Turner Construction**See 210639**** | oti-4, 34th floor-ls | $20,000 |
| Oct 3, 2000 | Expired or cancelled expired Jan 2003 | 425 Market St | addition to app #200009150624 | $20,000 | |
| Sep 21, 2000 | Expired or cancelled expired Aug 2003 | 425 Market St | Turner Construction**See 210639**** | oti-4 9/f meDetails
oti-4 9/f me | $5,000 |
| Sep 18, 2000 | Expired or cancelled expired Aug 2003 | 425 Market St | Cupertino Electric Inc. | modification to (e)f/a system @22nd flr onlyDetails
modification to (e)f/a system @22nd flr only | |
| Aug 24, 2000 | Completed final sign-off Jan 2001 | 425 Market St | Crk Construction | oti-2 10th floor, electrical, mechanical,sprinklerDetails
oti-2 10th floor, electrical, mechanical,sprinkler | $30,000 |
| Jul 25, 2000 | Expired or cancelled expired Nov 2003 | 425 Market St | Turner Construction**See 210639**** | oti-2 5th floor electrical | $16,917 |
| Jun 8, 2000 | Expired or cancelled expired Nov 2003 | 425 Market St | oti-1 10th/electrical/lifesaftyDetails
oti-1 10th/electrical/lifesafty | $50,000 | |
| May 2, 2000 | Completed final sign-off Sep 2000 | 425 Market St | Turner Construction**See 210639**** | oti-2 at 5th floorDetails
oti-2 at 5th floor | $21,840 |
| May 2, 2000 | Expired or cancelled cancelled Oct 2000 | 425 Market St | Turner Construction**See 210639**** | oti-3, at 9th floor | $78,890 |
| May 2, 2000 | Completed final sign-off Oct 2000 | 425 Market St | Turner Construction**See 210639**** | oti-2 at 9th floorDetails
oti-2 at 9th floor | $17,400 |
| May 2, 2000 | Completed final sign-off May 2001 | 425 Market St | Turner Construction**See 210639**** | oti-2 at 9th floor, el, me, l/s spDetails
oti-2 at 9th floor, el, me, l/s sp | $99,651 |
| Apr 18, 2000 | Completed final sign-off Sep 2000 | 425 Market St | oti-4 23rd floor electrical, mechanicalDetails
oti-4 23rd floor electrical, mechanical | $709,000 | |
| Apr 11, 2000 | Expired or cancelled cancelled Aug 2000 | 425 Market St | Hathaway Dinwiddie Co. | delete 3 sprinkler heads from approve pa#2000-03-03-3420Details
delete 3 sprinkler heads from approve pa#2000-03-03-3420 | |
| Apr 6, 2000 | Expired or cancelled expired Nov 2003 | 425 Market St | oti-1 5th floor el only | $35,000 | |
| Apr 5, 2000 | Completed final sign-off Dec 2000 | 425 Market St | Hathaway Dinwiddie Co. | oti-2 el 6th floorDetails
oti-2 el 6th floor | |
| Apr 5, 2000 | Completed final sign-off Dec 2000 | 425 Market St | Hathaway Dinwiddie Co. | oti-2 el, 7th floorDetails
oti-2 el, 7th floor | |
| Apr 3, 2000 | Expired or cancelled expired Jun 2003 | 425 Market St | Cupertino Electric Inc. | additonal fire alarm devices added to (e) l/s system for tenant build outDetails
additonal fire alarm devices added to (e) l/s system for tenant build out | $28,000 |
| Mar 30, 2000 | Expired or cancelled cancelled Aug 2003 | 425 Market St | oti-2, el, me, ls, sp 34th floor | $51,360 | |
| Mar 13, 2000 | Completed final sign-off Nov 2000 | 425 Market St | oti-2, el, sp, ground floorDetails
oti-2, el, sp, ground floor | $11,930 | |
| Mar 8, 2000 | Expired or cancelled expired Jun 2003 | 425 Market St | Hathaway Dinwiddie Co. | structural beam reinforcement at high density fuesDetails
structural beam reinforcement at high density fues | $5,000 |
| Mar 8, 2000 | Completed final sign-off May 2000 | 425 Market St | Turner Construction**See 210639**** | oti-1, 16th floor l/sDetails
oti-1, 16th floor l/s | $5,750 |
| Feb 24, 2000 | Completed final sign-off Dec 2000 | 425 Market St | Hathaway Dinwiddie Co. | oti-4 ls 16th floorDetails
oti-4 ls 16th floor | $20,000 |
| Feb 23, 2000 | Expired or cancelled expired Sep 2000 | 425 Market St | Turner Construction**See 210639**** | oti-2, 5th floor - addition & relocation of sprinkler headsDetails
oti-2, 5th floor - addition & relocation of sprinkler heads | $6,625 |
| Feb 16, 2000 | Completed final sign-off Dec 2000 | 425 Market St | Hathaway Dinwiddie Co. | oti 3 6th floor, elDetails
oti 3 6th floor, el | |
| Feb 16, 2000 | Completed final sign-off Dec 2000 | 425 Market St | Hathaway Dinwiddie Co. | oti 2 7th floor, elDetails
oti 2 7th floor, el | |
| Feb 16, 2000 | Completed final sign-off Dec 2000 | 425 Market St | Hathaway Dinwiddie Co. | oti 3 11th floor, lsDetails
oti 3 11th floor, ls | |
| Feb 3, 2000 | Expired or cancelled expired Aug 2003 | 425 Market St | Turner Construction**See 210639**** | oti-2 sp (mech on separate permit)Details
oti-2 sp (mech on separate permit) | $13,800 |
| Jan 31, 2000 | Completed final sign-off Dec 2000 | 425 Market St | oti-4: life safety, new strobes, speakers, smoke detectors (14th floor)Details
oti-4: life safety, new strobes, speakers, smoke detectors (14th floor) | $20,000 | |
| Jan 26, 2000 | Completed final sign-off Dec 2000 | 425 Market St | oti-3 11th floor l/sDetails
oti-3 11th floor l/s | $20,000 | |
| Jan 20, 2000 | Completed final sign-off Dec 2000 | 425 Market St | oti 3 14th floor, spDetails
oti 3 14th floor, sp | $30,000 | |
| Jan 18, 2000 | Expired or cancelled expired Aug 2003 | 425 Market St | Sabah International Incorporated | install one fm200 system | $19,120 |
| Jan 18, 2000 | Completed final sign-off Dec 2000 | 425 Market St | Hathaway Dinwiddie Co. | oti-2, 14th floor, el, me, spDetails
oti-2, 14th floor, el, me, sp | $50,000 |
| Jan 18, 2000 | Completed final sign-off Dec 2000 | 425 Market St | oti-1, 14th floor, el, me, spDetails
oti-1, 14th floor, el, me, sp | ||
| Jan 13, 2000 | Completed final sign-off Oct 2000 | 425 Market St | oti-1 el me l/s spDetails
oti-1 el me l/s sp | $100,000 | |
| Jan 13, 2000 | Expired or cancelled expired Jan 2003 | 425 Market St | oti-4 fire alarmDetails
oti-4 fire alarm | $18,000 | |
| Jan 12, 2000 | Expired or cancelled expired Aug 2003 | 425 Market St | oti-1: ms, l/s, spDetails
oti-1: ms, l/s, sp | $25,000 | |
| Jan 11, 2000 | Completed final sign-off Dec 2000 | 425 Market St | oti 1 16th floor, el, me, sp & lsDetails
oti 1 16th floor, el, me, sp & ls | $600,000 | |
| Jan 6, 2000 | Expired or cancelled expired Jun 2003 | 425 Market St | Hathaway Dinwiddie Co. | oti-2 28th floor el me l/s sp | $800,000 |
| Jan 4, 2000 | Expired or cancelled expired Oct 2003 | 425 Market St | Geo M Robinson & Co | modification to e f/a st stem | $30,000 |
| Jan 4, 2000 | Expired or cancelled expired Aug 2003 | 425 Market St | Geo M Robinson & Co | oti-4: l/s | $36,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hathaway Dinwiddie Co. (19), Skyline Construction (18), Turner Construction**See 210639**** (10), Hcbeck, Ltd. (9), Bcci Construction Company (7), Anderson, Rowe & Buckley, Inc. (5), Metropolitan Electrical Construction (5), Richlen Construction (5), Ayoob & Peery Plumbing Co Inc (4), Novo Construction Inc (4), Turner Construction Co (4), Cupertino Electric Inc. (3), Field Construction Inc. (2), Fisher Development Inc (2), Geo M Robinson & Co (2), R.M.R. Construction Company (2), Acco Engineered Systems Inc. Dba Acco En, Cb Bovenkamp Inc., Crk Construction, Dpw Inc., Golden Gate Fire Protection Inc, Lewis M Merlo Inc, Paganini Electric Corp(See Signatories), Sabah International Incorporated, Skanska Usa Building Inc, Source Planning And Construction Inc, Thomas Swan Sign Co Inc, Western Roofing Service
- Architects
- Doug Zucker (2), Michael Garcia (2), Bartley Mcclelland, Donald Dammen 20 Saddlebrook Ct, Matthew Fulvio
- Engineers
- Ajmani & Pamiidi, Amit Wadhwa, Craig Ristow, Donald D. Dammen, Gary Ho, Sebastian Asvaraksh, Siemens
- Authorized agents
- Adolfo Alano (2), Laszlo Vincze
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.