Block 3709, lot 017
425 Market St
138 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 3, 2026 | Completed | 425 Market St | Thomas Swan Sign Co Inc | install evacuation maps on 18th/f | $2,000 |
| Aug 31, 2023 | Completed | 425 Market St | Anderson, Rowe & Buckley, Inc. | existing fire sprinlker system, tenant improvements. relocate 165 pendents, 42 pendents,relocate 4 uprights sprinlkers | $132,000 |
| Jan 29, 2020 | Expired or cancelled | 425 Market St | 2/f -interior demo of non structural elements including finishes, partitoins. new power data on e partitions, elec deferred submittal. no mech work no exterior building, site, landscape, use or parking changes | $650,000 | |
| Mar 10, 2016 | Completed | 425 Market St | Fisher Development Inc | revision to pa 2015-1209-4552 interior improvements of an (e) office space on the 19th floor. installation of new walls, finishes and mechanical, electrical, plumbing and accessibility upgrades. maher na | $30,000 |
| Nov 19, 2015 | Completed | 425 Market St | Fisher Development Inc | 19th flr: demolition and removal of existing offices including ceilings and partitions of the 19th flr; maher n/a. demolition complies with sfbc ab-017. full accessibility to building will be filed under future t.i. permit. | $100,000 |
| Mar 30, 2015 | Never finaled | 425 Market St | Bcci Construction Company | revision to app#201412234360 to provide 9 addtional duct smoke detector at fan coil units. n/a for the maher. | $14,500 |
| Mar 27, 2015 | Completed | 425 Market St | Ayoob & Peery Plumbing Co Inc | grnd flr: plug 4 sprinkler, add 5 sprinkler and relocate 14 sprinkler. referenced ti 2015.0126.6675 under 28 fremont. | $9,766 |
| Mar 3, 2015 | Completed | 425 Market St | R L H Fire Protection Inc | fire sprinkler relocate 188 pendents, add 12 pendents, delete 3 uprights; t.i. 201412234360; maher n/a | $102,800 |
| Feb 24, 2015 | Completed | 425 Market St | Novo Construction Inc | emergency evacuation signage 4 signs 17th floor. ref app#201502178477. n/a for maher | $500 |
| Jan 28, 2015 | Completed | 425 Market St | Golden Gate Fire Protection Inc | relocate 6 pendent sprinkler heads on level b2, t.i. pa#201409226970. n/a ordinance #155-13 | $3,090 |
| Dec 23, 2014 | Completed | 425 Market St | Bcci Construction Company | tenant improvement:demolish & install rated doors & frames,storefront offices,finishes @ floor,walls & ceiling.toilet room upgrades, mep.(13) vav boxes, (19) fan coil units, duct distribution added/modified.(4)transfer air fans,(1)new fsd @lobby-doors in recpt,fire alarm & sprinklers separate permit | $900,000 |
| Sep 4, 2014 | Never finaled | 425 Market St | Source Planning And Construction Inc | #950- this project involves modification and expansion of existing tenant suite to include selective demolition of demising partition and construction of new office, doors & frames and new finishes. f/a & spinkler under separate permit. compliance with maher ordinance no 155-13 not required. | $20,000 |
| Nov 21, 2013 | Completed | 425 Market St | Skanska Usa Building Inc | relocate existing water cooled crac unit from level 19 to 20. provide connection to existing condense water system and existing ductwork. relocate existing data racks to level 20. new power distribtion for racks and relocate hvac. extend existing epo to include relocated equipment.no lighting,partit | $250,000 |
| Mar 27, 2013 | Completed | 425 Market St | Ayoob & Peery Plumbing Co Inc | add, relocate & remove fire sprinkler heads per t.i. 14th floor: 10 relo, 14 lowered, 3 removed, ref pa# 201212206603 15th fl: 2 add, 188 relo, 8 remove, ref pa# 201212206607 | $102,800 |
| Dec 4, 2012 | Never finaled | 425 Market St | Acco Engineered Systems Inc. Dba Acco En | 5th floor - install (1) water source heat pump & piping. | $60,000 |
| Jun 1, 2012 | Completed | 425 Market St | Turner Construction Co | revision to 201202164279. interior tenant improvement. revision includes construction of new doors. | $35,000 |
| May 31, 2012 | Completed | 425 Market St | Turner Construction Co | 11th floor. structural work for server room. equipment anchorage ref to pa#201202164279 and 201203015160 crack units on separate permit. | $2,000 |
| Mar 1, 2012 | Completed | 425 Market St | Turner Construction Co | 11th floor-refer to arch pa# 2012-0216-4279-work is mechanical & electrical | $1,150,000 |
| Feb 16, 2012 | Completed | 425 Market St | Turner Construction Co | 11th floor:interior tenant improvement. construction of new open office, offices, conferance rooms and break area. new finishes throughout 11th floor. mep and fire life safety under seperate permit. | $2,200,000 |
| Jun 20, 2011 | Completed | 425 Market St | Ayoob & Peery Plumbing Co Inc | relocate extg butterfly valve one, and check valve one, fire sprinkler system. | $8,455 |
| Jul 23, 2010 | Completed | 425 Market St | Paganini Electric Corp(See Signatories) | fire alarm system on the 16th floor. as built submission as part of pa# 2010.05.20.2905. 11 speakers, 9 strobes, 2 duct detectors and 1 relay device | |
| Sep 17, 2009 | Completed | 425 Market St | Lewis M Merlo Inc | repair craked topping slab on driveway. no work on actual building at fremont street. | $10,000 |
| Dec 8, 2006 | Completed | 425 Market St | business name: hq, oti-1, 22nd floor, el, ls, sp. | $13,580 | |
| Jun 28, 2006 | Completed | 425 Market St | fire alarm on 25th floor | $7,000 | |
| Jun 21, 2006 | Completed | 425 Market St | Western Roofing Service | reroofing | $430,000 |
| Apr 24, 2006 | Completed | 425 Market St | t.i. demolition - construction, electrical, plumbing (tenant improvement). asbestos abatement removal. restore fire proofing to structure. | $500,000 | |
| Mar 14, 2006 | Completed | 425 Market St | Cb Bovenkamp Inc. | interior remodel of an (e) retail space on groundfloor | $150,000 |
| Nov 30, 2005 | Never finaled | 425 Market St | Bcci Construction Company | revise permit no 200507208585- delete from the special inspection & structural observation the following- fillet welds; metal dock; ndt; fire proofing; bolts in existing concrete; and pull/torque testing | |
| Nov 22, 2005 | Completed | 425 Market St | Cupertino Electric Inc. | add 1 fsd fire smoke damper one duct detector | $500 |
| Oct 7, 2005 | Completed | 425 Market St | Richlen Construction | oti-2 7th floor=el, me, sp medhanical, electrical & sprinkler | $75,000 |
| Sep 22, 2005 | Completed | 425 Market St | Bcci Construction Company | life safety work on floor 24 including 2 smoke detectors 1 duct smoke detector 40 speakers and 58 | $50,500 |
| Aug 29, 2005 | Completed | 425 Market St | Novo Construction Inc | card access system interface to fire safety system for drop out of evacuation rootes of 4th & 5th fl | $30,000 |
| Jul 27, 2005 | Completed | 425 Market St | Bcci Construction Company | oti-2, 24th fl el, me. | $312,000 |
| Jul 27, 2005 | Completed | 425 Market St | Bcci Construction Company | oti2, 25th fl, el, me. | $304,000 |
| Jul 18, 2005 | Completed | 425 Market St | Bcci Construction Company | oti -1 el,me, ls, sp (24th fl) | $625,000 |
| Jul 8, 2005 | Completed | 425 Market St | Anderson, Rowe & Buckley, Inc. | existing spkr system buildout, 202 new spkrs, no increase, 20,200sf | $40,000 |
| Apr 28, 2005 | Completed | 425 Market St | Hcbeck, Ltd. | oti 2 (21st fl) el, me | $1,078,124 |
| Apr 28, 2005 | Completed | 425 Market St | Hcbeck, Ltd. | oti-1 (21st fl.) el, me, ls, sp | $737,163 |
| Apr 22, 2005 | Completed | 425 Market St | Hcbeck, Ltd. | provide an additional 12 cabinets to the (e) recently constructed lan-room. provide additional power | $200,000 |
| Mar 10, 2005 | Completed | 425 Market St | Skyline Construction | renewal of permit application 200404262277 for final inpsection only | |
| Mar 10, 2005 | Completed | 425 Market St | Skyline Construction | revision to 200404262277 to show as built condition | $12,000 |
| Mar 2, 2005 | Completed | 425 Market St | Dpw Inc. | install new branch line and sprinkler head coverage on 4th & 5th floors per approved plan. sprinkler | $75,000 |
| Mar 1, 2005 | Completed | 425 Market St | Metropolitan Electrical Construction | upgrade 4th & 5th floor to the new life safety system. | $73,578 |
| Feb 24, 2005 | Completed | 425 Market St | Hathaway Dinwiddie Co. | oti-3, 33rd floor, sp. | $2,000 |
| Dec 22, 2004 | Completed | 425 Market St | Novo Construction Inc | oti-1 5/f el me ls sp | $200,000 |
| Dec 22, 2004 | Completed | 425 Market St | Novo Construction Inc | oti-1 4/f el me ls sp | $200,000 |
| Dec 15, 2004 | Completed | 425 Market St | R.M.R. Construction Company | deomolition of all interior partitions/finishes and ceiling/add demolition at shafts and perimeter | $500,000 |
| Dec 15, 2004 | Expired or cancelled | 425 Market St | Anderson, Rowe & Buckley, Inc. | existing sprinkler system expansion 11 new sprinklers (stair, mech. room. & temporary storage) | $4,500 |
| Dec 6, 2004 | Completed | 425 Market St | Hathaway Dinwiddie Co. | oti-3, 34th floor, ls. | $74,000 |
| Sep 8, 2004 | Completed | 425 Market St | Richlen Construction | rev#200403239355. to elimate plan check requirement to reverse door swing @ stair#2. firemains vesti | |
| Sep 2, 2004 | Completed | 425 Market St | Skyline Construction | life safety work | $5,000 |
| Aug 25, 2004 | Completed | 425 Market St | Skyline Construction | renew of app#200401154171 tio complet the work. | $8,000 |
| Aug 24, 2004 | Completed | 425 Market St | Metropolitan Electrical Construction | upgrade the 9th floor to the new life safety system | $53,400 |
| Aug 17, 2004 | Completed | 425 Market St | Hcbeck, Ltd. | oti-1 20/f el me ls sp | $600,000 |
| Aug 17, 2004 | Completed | 425 Market St | Hcbeck, Ltd. | oti-2 20/f el me | $900,000 |
| Aug 12, 2004 | Completed | 425 Market St | Skyline Construction | 8 sprinkler heads to be relocated. no incresae in office space @ 27th floor only. | $2,000 |
| Aug 6, 2004 | Expired or cancelled | 425 Market St | Hathaway Dinwiddie Co. | construction of tenant convenience stair between 33rd and 34/f 10 slab openings to accommodate | $300,000 |
| Aug 4, 2004 | Completed | 425 Market St | oti-2, 4th floor, el, me | $133,000 | |
| Aug 4, 2004 | Completed | 425 Market St | oti-2 5th floor el, me | $123,000 | |
| Aug 4, 2004 | Completed | 425 Market St | oti-1, 4th floor, el, me, ls, sp | $90,000 | |
| Jul 28, 2004 | Expired or cancelled | 425 Market St | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work on 37th fl. | $65,000 |
| Jun 24, 2004 | Completed | 425 Market St | Richlen Construction | oti-3 at 20th fl, ls,sp | $113,000 |
| Jun 23, 2004 | Completed | 425 Market St | Skyline Construction | oti-1 rv ls sp 27/f | $8,000 |
| Jun 22, 2004 | Completed | 425 Market St | Hathaway Dinwiddie Co. | oti-2, 34th floor, el, me | $920,000 |
| Jun 21, 2004 | Completed | 425 Market St | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work 9th floor 2 new, 1 relocate | $1,500 |
| Jun 8, 2004 | Completed | 425 Market St | R.M.R. Construction Company | oti-1 office tenant improvement/alterations and restroom upgrade per 20% requirt | $48,000 |
| May 13, 2004 | Completed | 425 Market St | Hathaway Dinwiddie Co. | demo work on 34th floor. demo as per ab017-sfbc. | $100,000 |
| Apr 8, 2004 | Expired or cancelled | 425 Market St | Hathaway Dinwiddie Co. | oti-1 revised 32/f el me ls sp | $500 |
| Apr 5, 2004 | Completed | 425 Market St | Richlen Construction | oti-2, el, me, 20th floor | $150,000 |
| Mar 29, 2004 | Expired or cancelled | 425 Market St | Hathaway Dinwiddie Co. | relocate 6 srpinkler heads and associated pipework for 32nd floor | $1,250 |
| Mar 23, 2004 | Completed | 425 Market St | Richlen Construction | oti-1 20th floor el me ls sp | $692,560 |
| Dec 17, 2003 | Completed | 425 Market St | Skyline Construction | to correct description of location of work from 9th to 12th flr for permit app 200312011329-20020129 | |
| Dec 12, 2003 | Completed | 425 Market St | Skyline Construction | suite #960- relocate 1 sprinkler head | $500 |
| Dec 4, 2003 | Expired or cancelled | 425 Market St | Hcbeck, Ltd. | oti-2 17th l - el me | $380,000 |
| Dec 4, 2003 | Completed | 425 Market St | Hcbeck, Ltd. | oti-1 17th l = el, me,ls, sp | $620,000 |
| Dec 1, 2003 | Expired or cancelled | 425 Market St | Skyline Construction | renew pa 200201297908, 200201096583& 200111304256 | |
| Nov 3, 2003 | Completed | 425 Market St | to renew app#2003/02/19/7749 for final inspection. | ||
| Oct 27, 2003 | Completed | 425 Market St | Skyline Construction | oti-3 27th fl.me | $45,000 |
| Oct 27, 2003 | Completed | 425 Market St | Skyline Construction | oti-2 15th fl.me, sp | $15,000 |
| Oct 27, 2003 | Completed | 425 Market St | Skyline Construction | oti-1 15th fl. el, me, ls, sp | $65,000 |
| Oct 23, 2003 | Completed | 425 Market St | Hathaway Dinwiddie Co. | renew#9927205 for final only | |
| Oct 21, 2003 | Completed | 425 Market St | Skyline Construction | oti-1 18th floor el me ls sp | $240,000 |
| Oct 21, 2003 | Completed | 425 Market St | Skyline Construction | oti-2 27th floor sp | $15,000 |
| Oct 21, 2003 | Completed | 425 Market St | Metropolitan Electrical Construction | upgrade to the new life safety system on the 11/f | $30,975 |
| Oct 21, 2003 | Completed | 425 Market St | Skyline Construction | oti-2 18th floor me sp | $125,000 |
| Oct 21, 2003 | Completed | 425 Market St | Skyline Construction | oti-1 27th floor el me ls sp | $250,000 |
| Oct 9, 2003 | Completed | 425 Market St | oti-1 9th fl, no oti-2 | $8,000 | |
| Sep 17, 2003 | Completed | 425 Market St | Hathaway Dinwiddie Co. | renew expired appn 20000106367 and 200004036214 | |
| Aug 11, 2003 | Completed | 425 Market St | Metropolitan Electrical Construction | upgrade to the new life safety system for the core area only on the 17/f | $21,000 |
| Feb 28, 2003 | Completed | 425 Market St | Metropolitan Electrical Construction | upgrade to new life safety system | $65,000 |
| Feb 19, 2003 | Expired or cancelled | 425 Market St | tenant improvement demolition of (1) partition on 22nd floor | $4,100 | |
| Jan 7, 2003 | Expired or cancelled | 425 Market St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler per tenant improvements (8 total at 38th flr) | $1,900 |
| Oct 9, 2002 | Completed | 425 Market St | Hcbeck, Ltd. | oti-1 25th flr,el,me,ls,sp | $80,000 |
| Oct 9, 2002 | Completed | 425 Market St | Hcbeck, Ltd. | oti-2 28th fl,me,el | $20,000 |
| Jan 9, 2002 | Expired or cancelled | 425 Market St | Skyline Construction | install 8 new hds & relocate 14 existing hds on the 9th flr | $8,000 |
| Oct 31, 2001 | Expired or cancelled | 425 Market St | Skyline Construction | 17th floor-non structural demolition of four interior partitions no increase in office space | $8,000 |
| Apr 24, 2001 | Completed | 425 Market St | Field Construction Inc. | oti-2, 13th floor, ltg, mech, spr | $15,500 |
| Mar 29, 2001 | Completed | 425 Market St | Field Construction Inc. | oti-1 13th fl lt mech ls spr | $45,000 |
| Dec 28, 2000 | Expired or cancelled | 425 Market St | Turner Construction**See 210639**** | oti-4, 34th floor-ls | $20,000 |
| Oct 3, 2000 | Expired or cancelled | 425 Market St | addition to app #200009150624 | $20,000 | |
| Sep 21, 2000 | Expired or cancelled | 425 Market St | Turner Construction**See 210639**** | oti-4 9/f me | $5,000 |
| Sep 18, 2000 | Expired or cancelled | 425 Market St | Cupertino Electric Inc. | modification to (e)f/a system @22nd flr only | |
| Aug 24, 2000 | Completed | 425 Market St | Crk Construction | oti-2 10th floor, electrical, mechanical,sprinkler | $30,000 |
| Jul 25, 2000 | Expired or cancelled | 425 Market St | Turner Construction**See 210639**** | oti-2 5th floor electrical | $16,917 |
| Jun 8, 2000 | Expired or cancelled | 425 Market St | oti-1 10th/electrical/lifesafty | $50,000 | |
| May 2, 2000 | Completed | 425 Market St | Turner Construction**See 210639**** | oti-2 at 5th floor | $21,840 |
| May 2, 2000 | Completed | 425 Market St | Turner Construction**See 210639**** | oti-2 at 9th floor | $17,400 |
| May 2, 2000 | Completed | 425 Market St | Turner Construction**See 210639**** | oti-2 at 9th floor, el, me, l/s sp | $99,651 |
| May 2, 2000 | Expired or cancelled | 425 Market St | Turner Construction**See 210639**** | oti-3, at 9th floor | $78,890 |
| Apr 18, 2000 | Completed | 425 Market St | oti-4 23rd floor electrical, mechanical | $709,000 | |
| Apr 11, 2000 | Expired or cancelled | 425 Market St | Hathaway Dinwiddie Co. | delete 3 sprinkler heads from approve pa#2000-03-03-3420 | |
| Apr 6, 2000 | Expired or cancelled | 425 Market St | oti-1 5th floor el only | $35,000 | |
| Apr 5, 2000 | Completed | 425 Market St | Hathaway Dinwiddie Co. | oti-2 el 6th floor | |
| Apr 5, 2000 | Completed | 425 Market St | Hathaway Dinwiddie Co. | oti-2 el, 7th floor | |
| Apr 3, 2000 | Expired or cancelled | 425 Market St | Cupertino Electric Inc. | additonal fire alarm devices added to (e) l/s system for tenant build out | $28,000 |
| Mar 30, 2000 | Expired or cancelled | 425 Market St | oti-2, el, me, ls, sp 34th floor | $51,360 | |
| Mar 13, 2000 | Completed | 425 Market St | oti-2, el, sp, ground floor | $11,930 | |
| Mar 8, 2000 | Expired or cancelled | 425 Market St | Hathaway Dinwiddie Co. | structural beam reinforcement at high density fues | $5,000 |
| Mar 8, 2000 | Completed | 425 Market St | Turner Construction**See 210639**** | oti-1, 16th floor l/s | $5,750 |
| Feb 24, 2000 | Completed | 425 Market St | Hathaway Dinwiddie Co. | oti-4 ls 16th floor | $20,000 |
| Feb 23, 2000 | Expired or cancelled | 425 Market St | Turner Construction**See 210639**** | oti-2, 5th floor - addition & relocation of sprinkler heads | $6,625 |
| Feb 16, 2000 | Completed | 425 Market St | Hathaway Dinwiddie Co. | oti 3 6th floor, el | |
| Feb 16, 2000 | Completed | 425 Market St | Hathaway Dinwiddie Co. | oti 2 7th floor, el | |
| Feb 16, 2000 | Completed | 425 Market St | Hathaway Dinwiddie Co. | oti 3 11th floor, ls | |
| Feb 3, 2000 | Expired or cancelled | 425 Market St | Turner Construction**See 210639**** | oti-2 sp (mech on separate permit) | $13,800 |
| Jan 31, 2000 | Completed | 425 Market St | oti-4: life safety, new strobes, speakers, smoke detectors (14th floor) | $20,000 | |
| Jan 26, 2000 | Completed | 425 Market St | oti-3 11th floor l/s | $20,000 | |
| Jan 20, 2000 | Completed | 425 Market St | oti 3 14th floor, sp | $30,000 | |
| Jan 18, 2000 | Completed | 425 Market St | oti-1, 14th floor, el, me, sp | ||
| Jan 18, 2000 | Completed | 425 Market St | Hathaway Dinwiddie Co. | oti-2, 14th floor, el, me, sp | $50,000 |
| Jan 18, 2000 | Expired or cancelled | 425 Market St | Sabah International Incorporated | install one fm200 system | $19,120 |
| Jan 13, 2000 | Completed | 425 Market St | oti-1 el me l/s sp | $100,000 | |
| Jan 13, 2000 | Expired or cancelled | 425 Market St | oti-4 fire alarm | $18,000 | |
| Jan 12, 2000 | Expired or cancelled | 425 Market St | oti-1: ms, l/s, sp | $25,000 | |
| Jan 11, 2000 | Completed | 425 Market St | oti 1 16th floor, el, me, sp & ls | $600,000 | |
| Jan 6, 2000 | Expired or cancelled | 425 Market St | Hathaway Dinwiddie Co. | oti-2 28th floor el me l/s sp | $800,000 |
| Jan 4, 2000 | Expired or cancelled | 425 Market St | Geo M Robinson & Co | oti-4: l/s | $36,000 |
| Jan 4, 2000 | Expired or cancelled | 425 Market St | Geo M Robinson & Co | modification to e f/a st stem | $30,000 |