Pak Hui
- Listed as
- architect, engineer
- Firm
- Murphy Burr Curry, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to Mar 2018
55 permits since 2000 (engineer on 48 permits, architect on 7 permits): 35 completed, 10 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 23, 2018 | Completed final sign-off Dec 2022 | 901 Battery St | Richlen Construction | structural slab infill where (e) stair has been removed. no change in occupancy, use, or area. revision to 201702031863Details
structural slab infill where (e) stair has been removed. no change in occupancy, use, or area. revision to 201702031863 | $75,000 |
| Dec 18, 2017 | Completed final sign-off Apr 2018 | 127 Ellis St | Trainor Commercial Construction Inc. | 1st fl: demolition of existing wall & construction of cross wall.Details
1st fl: demolition of existing wall & construction of cross wall. | $20,000 |
| Dec 8, 2017 | Expired or cancelled cancelled Jan 2026 | 1155 Market St | Access Systems & Solutions Inc | 7th fl - install structural steel member to support window washing equipment. install dav it bases for window washing (interior)Details
7th fl - install structural steel member to support window washing equipment. install dav it bases for window washing (interior) | $50,000 |
| Dec 4, 2017 | Never finaled issued Feb 2019, no final | 180 Howard St | Team Commercial Construction Inc. | voluntary seismic improvments to the 11th fl diaphragm to core wall connections and wall stability of the north and south core walls. maher not reqDetails
voluntary seismic improvments to the 11th fl diaphragm to core wall connections and wall stability of the north and south core walls. maher not req | $150,000 |
| Oct 31, 2017 | Completed final sign-off Aug 2020 | 75 Francis St | Dome Construction Corp | improvements to (e) school bldg & property. no (n) sq footage. scope includes voluntary seismic upgrades, interior & exterior improvements and ada accessibility. mep and fire/life safety under separate permit. there will be 28.2 cy of (n) footing excavation.comply w/ private school sebc 3428.5.Details
improvements to (e) school bldg & property. no (n) sq footage. scope includes voluntary seismic upgrades, interior & exterior improvements and ada accessibility. mep and fire/life safety under separate permit. there will be 28.2 cy of (n) footing excavation.comply w/ private school sebc 3428.5. | $1,750,000 |
| Sep 27, 2017 | Completed final sign-off Apr 2018 | 1201 Bryant St | Skyline Construction | t.i. includes construction of new interior communicating stairs(not egress stairs) and added roof beam and sleepers for future mechanical equipment. n/a for maherDetails
t.i. includes construction of new interior communicating stairs(not egress stairs) and added roof beam and sleepers for future mechanical equipment. n/a for maher | $500,000 |
| Aug 22, 2017 | Never finaled issued Aug 2017, no final | 1201 Bryant St | Skyline Construction | revision to 2017-0530-7865 for revised wall opening designDetails
revision to 2017-0530-7865 for revised wall opening design | |
| Nov 1, 2016 | Completed final sign-off Jan 2018 | 1201 Bryant St | exterior renovations for barrier removal - new accessable entrance, removal of steel shed, lighting & exterior door & window repair & replacement. ** maher: n/a **Details
exterior renovations for barrier removal - new accessable entrance, removal of steel shed, lighting & exterior door & window repair & replacement. ** maher: n/a ** | $1,200,000 | |
| Feb 12, 2016 | Never finaled issued Oct 2016, no final | 100 California St | Swinerton Builders | renovate (e) 14th flr, including expansion onto mechanical roof wall, from a mechanical/maintenance space into a cold shell for leasing; move all mech/elec/plumbing systems from 14 to 15th/roof penthouse. plumbing & electrical are under separate permit. n/a for maher ordinance no 155-13.Details
renovate (e) 14th flr, including expansion onto mechanical roof wall, from a mechanical/maintenance space into a cold shell for leasing; move all mech/elec/plumbing systems from 14 to 15th/roof penthouse. plumbing & electrical are under separate permit. n/a for maher ordinance no 155-13. | $6,280,000 |
| Oct 22, 2015 | Never finaled issued Nov 2015, no final | 888 Brannan St | Herrero Builders Incorporated | ground floor: revision to pa 2015 0320 1442- new structural shear walls. n/a ordinance #155-13Details
ground floor: revision to pa 2015 0320 1442- new structural shear walls. n/a ordinance #155-13 | |
| Jul 2, 2015 | Completed final sign-off Aug 2017 | 1155 Market St | Dpr Construction | change of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, electrical, plumbing and fire alarm will be the in area of work.Details
change of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, electrical, plumbing and fire alarm will be the in area of work. | $2,395,639 |
| Feb 3, 2015 | Completed final sign-off Apr 2016 | 1355 Market St | Alliance Roofing Co Inc | reroofing; removal of copper roofing system (aaprox 1000sqft) installation of stainless steel hat channels to concrete deck. attachment of new copper roofing system. ** maher: compliance with ordinance no# 155-13 not required **Details
reroofing; removal of copper roofing system (aaprox 1000sqft) installation of stainless steel hat channels to concrete deck. attachment of new copper roofing system. ** maher: compliance with ordinance no# 155-13 not required ** | $20,000 |
| Jan 23, 2015 | Completed final sign-off Sep 2017 | 1100 Market St | Build Group Inc. | structural upgrade for sidewalk. no building demo under this permit. sidewalk upgrade along mcallister st. maher n/a.Details
structural upgrade for sidewalk. no building demo under this permit. sidewalk upgrade along mcallister st. maher n/a. | $80,000 |
| Jan 8, 2015 | Completed final sign-off Nov 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | 2nd flr: structural work associated with approved permit 201409307645, support for won doors, roll up doors, naaa doors.Details
2nd flr: structural work associated with approved permit 201409307645, support for won doors, roll up doors, naaa doors. | $15,000 |
| Dec 24, 2014 | Completed final sign-off Aug 2017 | 1400 16th St | Charles Pankow Builders Ltd | seismic strengthening of building and addition of new skylight.Details
seismic strengthening of building and addition of new skylight. | $1,100,000 |
| Sep 10, 2014 | Completed final sign-off Mar 2015 | 1600 Van Ness Av | Midstate Construction Corporation | installation of fire escape, replace in kind per reference pa201311252751Details
installation of fire escape, replace in kind per reference pa201311252751 | $47,000 |
| Aug 11, 2014 | Expired or cancelled cancelled Jan 2026 | 1333 Gough St | new room for emergency generator at ground floor maher not required-155-13Details
new room for emergency generator at ground floor maher not required-155-13 | $85,000 | |
| Jul 16, 2014 | Never finaled filed Jul 2014, never issued | 1355 Market St | Terra Nova Industries | revision to pa# 2012/11/08/3877. build mezzanine for office & storage space on ground floor. mep under separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to pa# 2012/11/08/3877. build mezzanine for office & storage space on ground floor. mep under separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $134,000 |
| Jun 27, 2014 | Completed final sign-off Jul 2015 | 160 Spear St | Skyline Construction | create interconnecting stair floors for 17th and 18th floors. ** maher: compliance with ordinance no# 155-13 not required **Details
create interconnecting stair floors for 17th and 18th floors. ** maher: compliance with ordinance no# 155-13 not required ** | $260,000 |
| Jun 4, 2014 | Expired or cancelled expired May 2022 | 1550 Bryant St | D A Pope Inc | t.i. includes demo of portion existing concrete slab for new communication stair between existing 8/f & 9/f tenant suites. permit for new stair and 9/f t.i. submitted seperately. ti on both floors separate permit. building fully sprinklers. n/a ordinance #155-13Details
t.i. includes demo of portion existing concrete slab for new communication stair between existing 8/f & 9/f tenant suites. permit for new stair and 9/f t.i. submitted seperately. ti on both floors separate permit. building fully sprinklers. n/a ordinance #155-13 | $1,000 |
| Feb 18, 2014 | Completed final sign-off Aug 2014 | 875 Stevenson St | Truebeck Construction | block 3508 lot 055. (n) entry gate to market square commons located directly off 10th st & accessibility deferred by ab-056.Details
block 3508 lot 055. (n) entry gate to market square commons located directly off 10th st & accessibility deferred by ab-056. | $200,000 |
| Nov 26, 2013 | Expired or cancelled cancelled Nov 2024 | 1355 Market St | Truebeck Construction | revision to exterior openings no structural work. new interior demising partition.revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space.Details
revision to exterior openings no structural work. new interior demising partition.revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space. | $30,000 |
| Nov 26, 2013 | Completed final sign-off Aug 2014 | 1355 Market St | Truebeck Construction | revision to exterior openings w/ structural work per a-3.1 & s-1. new exterior deck & ground floor. revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space. compliance with ordinance no. 155-13 not required.Details
revision to exterior openings w/ structural work per a-3.1 & s-1. new exterior deck & ground floor. revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space. compliance with ordinance no. 155-13 not required. | $50,000 |
| Nov 25, 2013 | Completed final sign-off Mar 2015 | 1600 Van Ness Av | Midstate Construction Corporation | ti @(e) bldg demolition of structure @1/f columns and addition of (n) long span beams; (n) elevator, update (e) toilets, (n) toilet rm, conference/breakrm, locker area, parts storage rm on 3rd; (n) flooring on 2nd, (n) light fixtures all floors; (n) pg & e service in basement and (n) fire escapeDetails
ti @(e) bldg demolition of structure @1/f columns and addition of (n) long span beams; (n) elevator, update (e) toilets, (n) toilet rm, conference/breakrm, locker area, parts storage rm on 3rd; (n) flooring on 2nd, (n) light fixtures all floors; (n) pg & e service in basement and (n) fire escape | $1,200,000 |
| Nov 6, 2013 | Completed final sign-off Feb 2020 | 580 Capp St | Cahill Contractors Inc | remodel (e) bsmnt and grnd flr.of (e) 8-story bldg. add 2 units on grd. flr. and 1 unit level 2. new floor & ground finishes floor 2-8. new fire sprkler syst. thru-out. fire alarm throughout.Details
remodel (e) bsmnt and grnd flr.of (e) 8-story bldg. add 2 units on grd. flr. and 1 unit level 2. new floor & ground finishes floor 2-8. new fire sprkler syst. thru-out. fire alarm throughout. | $200,000 |
| Oct 7, 2013 | Completed final sign-off Feb 2015 | 1411 Market St | Swinerton Builders | install 150 car lifts on b-2 and b3 under approved building permit application #200903234623s. anchorage of car lifts only under this permit. approved sp and arch 2009.0323.4623s4/s3.Details
install 150 car lifts on b-2 and b3 under approved building permit application #200903234623s. anchorage of car lifts only under this permit. approved sp and arch 2009.0323.4623s4/s3. | |
| Sep 27, 2013 | Completed final sign-off Nov 2013 | 3251 20th Av | Dickinson Cameron Construction Company I | structural revision to pa# 201303202673 & pa# 201305207407 changes to include removal of portion of structural steel transfer ginders, welding of new steel plates and minor furring out of the mall bulkhead fascia and column wrap.Details
structural revision to pa# 201303202673 & pa# 201305207407 changes to include removal of portion of structural steel transfer ginders, welding of new steel plates and minor furring out of the mall bulkhead fascia and column wrap. | $5,000 |
| Sep 18, 2013 | Never finaled filed Sep 2013, never issued | 1355 Market St | Truebeck Construction | ab-056 ineffect to defer access under future sep permit.minor permit to alter constr new storefrt sys to infill opening prev pking garage entry ramp entrance to be demo under sep permit.new storefrt located on 10th st side bet gridline i/j&21.pkg incl plns,elevation,detail&schedules.no excavation.Details
ab-056 ineffect to defer access under future sep permit.minor permit to alter constr new storefrt sys to infill opening prev pking garage entry ramp entrance to be demo under sep permit.new storefrt located on 10th st side bet gridline i/j&21.pkg incl plns,elevation,detail&schedules.no excavation. | $50,000 |
| Sep 18, 2013 | Completed final sign-off Aug 2014 | 1355 Market St | Truebeck Construction | ab-056 inplace to defer access to future submital.remove portn of ext wall&roll down drs,pking entry ramp.constr new g/fl concrete slab&bsmt slab.new storefrt sys along 10th st to infill e g/fl openg new renlita dr at stevenson st loading bay,new partn walls in entire tenant space.l/s&mep sep permitDetails
ab-056 inplace to defer access to future submital.remove portn of ext wall&roll down drs,pking entry ramp.constr new g/fl concrete slab&bsmt slab.new storefrt sys along 10th st to infill e g/fl openg new renlita dr at stevenson st loading bay,new partn walls in entire tenant space.l/s&mep sep permit | $375,000 |
| Aug 2, 2013 | Completed final sign-off Dec 2013 | 1550 Bryant St | Rainbow Waterproofing & Restor | brace interior hollow clay tile in chimneyDetails
brace interior hollow clay tile in chimney | $8,000 |
| Jun 18, 2013 | Completed final sign-off Mar 2014 | 875 Stevenson St | Truebeck Construction | basemt & 1/f select area as indicated in loc. zone 1. new const, new vehicle ramp,new mail rm & new basemt storage rm. mep & life safety will be designed/build under separate permit. ada accessibility will be deferred under ab-056Details
basemt & 1/f select area as indicated in loc. zone 1. new const, new vehicle ramp,new mail rm & new basemt storage rm. mep & life safety will be designed/build under separate permit. ada accessibility will be deferred under ab-056 | $250,000 |
| May 16, 2013 | Completed final sign-off Mar 2014 | 875 Stevenson St | Truebeck Construction | work in basement & 1st flr-includes exterior & interior demolition work, structural work in the indicated locations, zone 1 & 2. select areas of demolition including hole in 1st flr slab for new vehicle ramp, removal of (e) trash chute at basement & 1st flrs. (e) future trash enclosure & removal ofDetails
work in basement & 1st flr-includes exterior & interior demolition work, structural work in the indicated locations, zone 1 & 2. select areas of demolition including hole in 1st flr slab for new vehicle ramp, removal of (e) trash chute at basement & 1st flrs. (e) future trash enclosure & removal of | $50,000 |
| May 15, 2013 | Never finaled issued May 2013, no final | 1355 Market St | Skyline Construction | 2nd floor suite 220 - revision to appl #2013.04.15.4506 - structural work for fold partition.Details
2nd floor suite 220 - revision to appl #2013.04.15.4506 - structural work for fold partition. | $25,000 |
| Apr 11, 2013 | Expired or cancelled cancelled Jan 2020 | 130 08th St | Source Planning And Construction Inc | basement & floors 1, 2, & 3 - demolition of int walls, partial floor structure, plumbing fixtures, millwork & finishes, construction of new toilet rooms, stairs, new elevator, hvac & elec systems & lighting. all upgrades are base bldg only including front door & mech equipment on roof.Details
basement & floors 1, 2, & 3 - demolition of int walls, partial floor structure, plumbing fixtures, millwork & finishes, construction of new toilet rooms, stairs, new elevator, hvac & elec systems & lighting. all upgrades are base bldg only including front door & mech equipment on roof. | $1,000,000 |
| Jan 22, 2013 | Completed final sign-off Mar 2013 | 900 Potrero Av | Grand Industries Inc | car damage near corner of bldg - install temp shoring, repair stem wall w/new re-enforced concrets doweled into existing. replace posts & 2x6 studs. replace necessary siding. comply w/nov #201384921Details
car damage near corner of bldg - install temp shoring, repair stem wall w/new re-enforced concrets doweled into existing. replace posts & 2x6 studs. replace necessary siding. comply w/nov #201384921 | $14,000 |
| Nov 28, 2012 | Completed final sign-off Jun 2014 | 888 Brannan St | Richlen Construction | revision to pa #201203146059. for interior only.Details
revision to pa #201203146059. for interior only. | $499,000 |
| Sep 5, 2012 | Completed final sign-off May 2014 | 875 Stevenson St | Truebeck Construction | interior demo (e) tenant build outs, base building core-shell upgrades & new finishes. exterior envelope renovation of floors 3-10 including. removal of (e) precast concrete panels and replaced with a new glass curtain wall skin.Details
interior demo (e) tenant build outs, base building core-shell upgrades & new finishes. exterior envelope renovation of floors 3-10 including. removal of (e) precast concrete panels and replaced with a new glass curtain wall skin. | $17,000,000 |
| Sep 5, 2012 | Completed final sign-off Oct 2013 | 1355 Market St | demo portion of (e) south facade ground floor windows & window openings to finish floor. remove (e) boiler file at ground & 2nd floor. remove (e) slab at 2nd floor for future stair. remove (e) louvers in (e) window openings & remove (e) windows. 2nd flooor slab removal as per strucutral drawing.Details
demo portion of (e) south facade ground floor windows & window openings to finish floor. remove (e) boiler file at ground & 2nd floor. remove (e) slab at 2nd floor for future stair. remove (e) louvers in (e) window openings & remove (e) windows. 2nd flooor slab removal as per strucutral drawing. | $375,000 | |
| Jun 15, 2012 | Never finaled issued Jul 2012, no final | 1060 Key Av | Grand Industries Inc | replace concrete retaining wall with reinforced concrete masonry retaining wall along 3rd st and key ave, total length of 143 feet, new retaining wall will be same height as existing retaining wall.Details
replace concrete retaining wall with reinforced concrete masonry retaining wall along 3rd st and key ave, total length of 143 feet, new retaining wall will be same height as existing retaining wall. | $57,006 |
| Apr 23, 2012 | Expired or cancelled cancelled Nov 2024 | 1355 Market St | Truebeck Construction | interior demolition of portion of 2nd fl concrete slab diaphragm. addition of frp strips around the openings perimeter & at columns will be added to strengthen the floor. minor hss tube is to be added to act as a chord tie. the bldg has been seismically rehabilitated under separate permit.Details
interior demolition of portion of 2nd fl concrete slab diaphragm. addition of frp strips around the openings perimeter & at columns will be added to strengthen the floor. minor hss tube is to be added to act as a chord tie. the bldg has been seismically rehabilitated under separate permit. | $250,000 |
| Apr 2, 2012 | Completed final sign-off Oct 2013 | 60 Spear St | Skyline Construction | building wide structural system upgrades (seismic) only. all work will be voluntary seismic improvement. the work is not intended to meet with the 2010 sfbc, section 3401.8Details
building wide structural system upgrades (seismic) only. all work will be voluntary seismic improvement. the work is not intended to meet with the 2010 sfbc, section 3401.8 | $322,382 |
| Jan 19, 2012 | Completed final sign-off Jun 2012 | 166 Geary St | Build Group Inc. | build out of (n) canopy, re-cladding of (e) storefront and replacing of existing entry doors . entry doors to be replaced in-kind. canopy will not block any fire escape, rescue window, or exit. additional permits to be submitted for interior work.Details
build out of (n) canopy, re-cladding of (e) storefront and replacing of existing entry doors . entry doors to be replaced in-kind. canopy will not block any fire escape, rescue window, or exit. additional permits to be submitted for interior work. | $50,000 |
| Aug 31, 2011 | Never finaled issued Oct 2011, no final | 386 Geary St | Marchetti Construction Inc. | voluntary seismic/structural strengthening, new concrete shear walls on interior face of (e) walls from basement to 8th floor.Details
voluntary seismic/structural strengthening, new concrete shear walls on interior face of (e) walls from basement to 8th floor. | $2,000,000 |
| Jul 19, 2011 | Completed final sign-off Oct 2013 | 1355 Market St | Truebeck Construction | revision to pa# 2009/02/26/2951/r2. voluntary seismic rehabilitation & superstructure collapse prevention per bse-2. construction of new concrete shear core surrounding elevators. new shear walls to supply supplemental strength from basement to roof.Details
revision to pa# 2009/02/26/2951/r2. voluntary seismic rehabilitation & superstructure collapse prevention per bse-2. construction of new concrete shear core surrounding elevators. new shear walls to supply supplemental strength from basement to roof. | $450,000 |
| Jul 19, 2011 | Completed final sign-off Oct 2013 | 1355 Market St | Truebeck Construction | foundation revision to pa# 2008/09/29/2954. voluntary seismic rehabilitation & collapse prevention per bse-2. new spread footings at shearwall locations. new mat foundation to support new elevator core. no underpinning or shoring required.Details
foundation revision to pa# 2008/09/29/2954. voluntary seismic rehabilitation & collapse prevention per bse-2. new spread footings at shearwall locations. new mat foundation to support new elevator core. no underpinning or shoring required. | $125,000 |
| May 11, 2010 | Completed final sign-off Jul 2010 | 3166 23rd St | Dawson - Clinton Gen Contr Corp | voluntary structural upgrade. new wall anchorages at roof level of existing 1 story cmu block wall builing. reinforce existing skylights. note: there is nov 200672189 requiring 1-hr separation between garage and offices. garage is no longer part of building.Details
voluntary structural upgrade. new wall anchorages at roof level of existing 1 story cmu block wall builing. reinforce existing skylights. note: there is nov 200672189 requiring 1-hr separation between garage and offices. garage is no longer part of building. | $3,500 |
| Nov 7, 2008 | Never finaled issued Dec 2008, no final | 660 Market St | structural strengthening. ground fl. addition of steel braced frams with friction dampers east/west direction. gr. fl. addition of shotcrete wall panels at east perimeter wall (improve north/south direction).Details
structural strengthening. ground fl. addition of steel braced frams with friction dampers east/west direction. gr. fl. addition of shotcrete wall panels at east perimeter wall (improve north/south direction). | $50,000 | |
| Sep 29, 2008 | Completed final sign-off Oct 2013 | 1355 Market St | Plant Construction Company Lp | construction of new spread footings and mat foundation only, for new concrete shearwalls. a new pilelap & micropile foundation system will be received at one location, all above work is for voluntary strengthening of (e) bldg. superstructure to be submitted as a separate permit.Details
construction of new spread footings and mat foundation only, for new concrete shearwalls. a new pilelap & micropile foundation system will be received at one location, all above work is for voluntary strengthening of (e) bldg. superstructure to be submitted as a separate permit. | $670,000 |
| Jan 30, 2008 | Completed final sign-off Aug 2008 | 1520 Taylor St | voluntary seismic upgrade involving strenghtening of 2 columns on 2 floors and 1 shear wall on three floors.Details
voluntary seismic upgrade involving strenghtening of 2 columns on 2 floors and 1 shear wall on three floors. | $111,113 | |
| Jan 24, 2008 | Expired or cancelled expired Aug 2008 | 127 Ellis St | revision to application 200708170189 r-3, add concrete moment frames at 1st floor, revise out-of-plane wall bracing at 5th floor.Details
revision to application 200708170189 r-3, add concrete moment frames at 1st floor, revise out-of-plane wall bracing at 5th floor. | $15,000 | |
| Oct 11, 2007 | Completed final sign-off May 2008 | 1550 Bryant St | voluntary seismic improvement of existing concrete chimney stack and containment of the hollow clay tile. infill wall surrounding the stack. purpose of this permit is to decrease the probable maxi.loss value of bldg. by improving seismic. strengthening of existing concrete c.s. 10th floor and up.Details
voluntary seismic improvement of existing concrete chimney stack and containment of the hollow clay tile. infill wall surrounding the stack. purpose of this permit is to decrease the probable maxi.loss value of bldg. by improving seismic. strengthening of existing concrete c.s. 10th floor and up. | $475,000 | |
| Mar 29, 2007 | Completed final sign-off Jun 2009 | 49 Geary St | provide voluntary seismic upgrade. not in full compliance with sec. 3403.6, sfbc, 2001.Details
provide voluntary seismic upgrade. not in full compliance with sec. 3403.6, sfbc, 2001. | $5,000,000 | |
| Mar 22, 2007 | Expired or cancelled expired May 2009 | 888 Brannan St | voluntary seismic repair, work at 1st floor below street level. 2nd floor street level, 3rd & 4th floor which will strengthening existing concrete columns with fiber wrap and infilling new sheerwall panels.Details
voluntary seismic repair, work at 1st floor below street level. 2nd floor street level, 3rd & 4th floor which will strengthening existing concrete columns with fiber wrap and infilling new sheerwall panels. | $100,000 | |
| Feb 2, 2007 | Expired or cancelled expired Mar 2009 | 900 Minnesota St | excavation and shoring of (e) west building. reference site pa# 200512029382s.Details
excavation and shoring of (e) west building. reference site pa# 200512029382s. | $170,000 | |
| Feb 2, 2007 | Expired or cancelled expired Mar 2009 | 900 Minnesota St | excavation and shoring for (e) east building. reference site pa# 200512029382s.Details
excavation and shoring for (e) east building. reference site pa# 200512029382s. | $170,000 |