Geoffrey Butler
- Listed as
- architect, designer
- Firm
- Geoffrey Butler Arch & Plan
- Based in
- Sausalito
- On San Francisco permits
- Aug 2007 to Jan 2026
6 permits since 2000 (architect on 5 permits, designer on 1 permit): 4 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 22, 2026 | In progress issued Feb 2026 | 119 26th Av | Forma Construction | repl (e) windows, add(n) prop line fire windows at n elev. repl (e) cedar shingles w/(n), repl and expand(e) deck/patio, expand m. bath, creat(n) bath, reloc laundry, raise m. bedroom clg. remodel kitch, add laundry & mod room off garage, repl(e) lower floor1/2bath...ref/rev to 202509105017.Details
repl (e) windows, add(n) prop line fire windows at n elev. repl (e) cedar shingles w/(n), repl and expand(e) deck/patio, expand m. bath, creat(n) bath, reloc laundry, raise m. bedroom clg. remodel kitch, add laundry & mod room off garage, repl(e) lower floor1/2bath...ref/rev to 202509105017. | $275,000 |
| May 27, 2025 | Completed final sign-off Sep 2025 | 340 San Jose Av | J..H. Construction Co./John A Huerta Co | frame wall with electrical and drywall. install new door to create new bedroom. (e) windowDetails
frame wall with electrical and drywall. install new door to create new bedroom. (e) window | $7,000 |
| Nov 25, 2013 | Completed final sign-off Mar 2015 | 1600 Van Ness Av | Midstate Construction Corporation | ti @(e) bldg demolition of structure @1/f columns and addition of (n) long span beams; (n) elevator, update (e) toilets, (n) toilet rm, conference/breakrm, locker area, parts storage rm on 3rd; (n) flooring on 2nd, (n) light fixtures all floors; (n) pg & e service in basement and (n) fire escapeDetails
ti @(e) bldg demolition of structure @1/f columns and addition of (n) long span beams; (n) elevator, update (e) toilets, (n) toilet rm, conference/breakrm, locker area, parts storage rm on 3rd; (n) flooring on 2nd, (n) light fixtures all floors; (n) pg & e service in basement and (n) fire escape | $1,200,000 |
| Sep 17, 2010 | Completed final sign-off Nov 2012 | 3800 Geary Bl | Midstate Construction Corporation | voluntary seismic strengthening. demo of interior and exterior finishes, replace all int and ext finishes, plus mech, elec, plbg, windows and doors. new roof, new urinal and toilet and seeking leed platinum certificationDetails
voluntary seismic strengthening. demo of interior and exterior finishes, replace all int and ext finishes, plus mech, elec, plbg, windows and doors. new roof, new urinal and toilet and seeking leed platinum certification | $925,000 |
| Oct 14, 2008 | Expired or cancelled expired Aug 2011 | 3246 Scott St | revision to pa# 2008/01/07/1945, revise layout of 2nd floor rear unit, provide new windows @ bedrooms, provide new skylights @ bathrooms, install washer/dryer. add kitchen and bath remodels. infill opening at 2nd floor.Details
revision to pa# 2008/01/07/1945, revise layout of 2nd floor rear unit, provide new windows @ bedrooms, provide new skylights @ bathrooms, install washer/dryer. add kitchen and bath remodels. infill opening at 2nd floor. | $22,200 | |
| Aug 8, 2007 | Completed final sign-off Jul 2008 | 4041 Geary Bl | to erect electric, wall single faced sign.Details
to erect electric, wall single faced sign. | $7,500 |