Esmeralda Marquez
- Listed as
- architect
- Firm
- Esmeralda Marquez, Aia
- On San Francisco permits
- Aug 2004 to Jun 2016
8 permits since 2000 (architect on 8 permits): 8 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 21, 2016 | Completed final sign-off Jan 2018 | 1701 Van Ness Av | remove extg plywood bulkhead, decorative band along exterior at first floor only. replace with new aluminum composite panels. remove extg store front, replace with new double glazed storefront, remove extg entry door with new entry door.Details
remove extg plywood bulkhead, decorative band along exterior at first floor only. replace with new aluminum composite panels. remove extg store front, replace with new double glazed storefront, remove extg entry door with new entry door. | $143,000 | |
| May 13, 2015 | Completed final sign-off Oct 2015 | 1600 Van Ness Av | Midstate Construction Corporation | (n) hydrogen service repair bay, upgrade (e) repair maintenance bay. 550 sf space will include 1-hr wall, 60 min doors, (n) dedicated ventilation & fire suppression for hydrogen detection. adding roof exhaust unit. fire suppression system (high pressure and monitoring system under separate applDetails
(n) hydrogen service repair bay, upgrade (e) repair maintenance bay. 550 sf space will include 1-hr wall, 60 min doors, (n) dedicated ventilation & fire suppression for hydrogen detection. adding roof exhaust unit. fire suppression system (high pressure and monitoring system under separate appl | $41,000 |
| Feb 19, 2015 | Completed final sign-off Oct 2015 | 1600 Van Ness Av | Midstate Construction Corporation | removal of (e) beams, replace with glu-lam beamsDetails
removal of (e) beams, replace with glu-lam beams | $25,000 |
| Jan 16, 2015 | Completed final sign-off Mar 2015 | 1600 Van Ness Av | evacuation plans for bldg. @ existing stairs & elevator, entrance and fire escape, on all floors.Details
evacuation plans for bldg. @ existing stairs & elevator, entrance and fire escape, on all floors. | $900 | |
| Dec 16, 2014 | Completed final sign-off Mar 2015 | 1600 Van Ness Av | Midstate Construction Corporation | revision to 201311252751. revisions to finishes, millwork, change in interior storefront unit to window, electrical power to elevator, smoke guard door, smoke detector, power to millwork coffee station, car warning light. electrical work under pa#e201408061712Details
revision to 201311252751. revisions to finishes, millwork, change in interior storefront unit to window, electrical power to elevator, smoke guard door, smoke detector, power to millwork coffee station, car warning light. electrical work under pa#e201408061712 | $9,500 |
| Sep 10, 2014 | Completed final sign-off Mar 2015 | 1600 Van Ness Av | Midstate Construction Corporation | installation of fire escape, replace in kind per reference pa201311252751Details
installation of fire escape, replace in kind per reference pa201311252751 | $47,000 |
| May 12, 2014 | Completed final sign-off Mar 2015 | 1600 Van Ness Av | Air & Lube Systems Inc. | automative service equipment only. the equipment includes- auto lifts, oil storage tanks and a tailpipe exhaust system. ref bldg permit 2013-11-25-2751.Details
automative service equipment only. the equipment includes- auto lifts, oil storage tanks and a tailpipe exhaust system. ref bldg permit 2013-11-25-2751. | $400,000 |
| Aug 3, 2004 | Completed final sign-off Jan 2007 | 1288 Stanyan St | new 2 story horizontal addition in rear yard with complete interior renovation.Details
new 2 story horizontal addition in rear yard with complete interior renovation. | $250,000 |