- 0 permits filed
6 permits since 2000: 5 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2024 | Completed final sign-off Dec 2024 | 420 23rd St | revision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control roomDetails
revision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control room | $7,000 |
| Nov 16, 2023 | In progress filed Nov 2023, not yet issued | 420 23rd St | added demo scope to pa# 202308305599Details
added demo scope to pa# 202308305599 | $80,000 |
| Aug 30, 2023 | Completed final sign-off Oct 2024 | 420 23rd St | select demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform.Details
select demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform. | $200,000 |
| May 5, 2023 | Completed final sign-off May 2024 | 420 23rd St | mayoral ed-17-02 removal of existing concrete encased partial steel control room building to slab on grade. 2. floating concrete slab connecting control room back to turbine platform. per ab-017.Details
mayoral ed-17-02 removal of existing concrete encased partial steel control room building to slab on grade. 2. floating concrete slab connecting control room back to turbine platform. per ab-017. | $30,000 |
| May 5, 2023 | Completed final sign-off May 2024 | 420 23rd St | unit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017Details
unit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017 | $600,000 |
| May 4, 2023 | Completed final sign-off Jun 2024 | 420 23rd St | mayoral ed-17-02: removal of cutout demo of (e) office building only non-structurl demo to remove partitions within building, removal of rooftop locker wash house room located on top of office building roofDetails
mayoral ed-17-02: removal of cutout demo of (e) office building only non-structurl demo to remove partitions within building, removal of rooftop locker wash house room located on top of office building roof | $40,000 |