Hui Li
- Listed as
- engineer
- Firm
- Haley & Aldrich Inc.
- On San Francisco permits
- Jan 2015 to Mar 2017
3 permits since 2000 (engineer on 3 permits): 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 10, 2017 | Never finaled issued Jun 2017, no final | 1201 Illinois St | American Integrated Services Inc, Haley & Aldrich Construction Services | soil remediation: remove(e)utilities&buried struc excavte soil to 5-8' below grd surface.in site solidification of soil,jet grouting,replc(e)bulkhead w/new sheetpile bulkhead,backfill w/clean imported fill& instl/repair durable covers gravel,or asphalt pavement,demo,elec&plumb obtain seated/complianDetails
soil remediation: remove(e)utilities&buried struc excavte soil to 5-8' below grd surface.in site solidification of soil,jet grouting,replc(e)bulkhead w/new sheetpile bulkhead,backfill w/clean imported fill& instl/repair durable covers gravel,or asphalt pavement,demo,elec&plumb obtain seated/complian | $5,448,339 |
| Mar 10, 2017 | Never finaled issued Jun 2017, no final | 1301 Illinois St | American Integrated Services Inc, Haley & Aldrich Construction Services | soil remediation:remove (e)utilities&buried strucs,excavate soil to 5-8' below grd surface,in-site soil solidification,remove&cap a sec of abandoned undergrd concrete intake pipe,backfill w/clean imported fill,&instl&/or repair durable covers crushed stone,or asphalt pavement.elec&plum sep.Details
soil remediation:remove (e)utilities&buried strucs,excavate soil to 5-8' below grd surface,in-site soil solidification,remove&cap a sec of abandoned undergrd concrete intake pipe,backfill w/clean imported fill,&instl&/or repair durable covers crushed stone,or asphalt pavement.elec&plum sep. | $5,448,339 |
| Jan 13, 2015 | Never finaled issued Jan 2015, no final | 1201 Illinois St | Haley & Aldrich Construction Services | removal and disposal of degraded cover materials and shallow soils. installation of durable cover per plan.Details
removal and disposal of degraded cover materials and shallow soils. installation of durable cover per plan. | $250,000 |