12 permits since 2000: 6 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2018 | Never finaled issued Sep 2018, no final | 1201 Illinois St | revision to pa 2017-0310-1167 to remove fire suppression line replacement at northeast area of decomissioned power plant site. n/a for maher.Details
revision to pa 2017-0310-1167 to remove fire suppression line replacement at northeast area of decomissioned power plant site. n/a for maher. | |
| Mar 7, 2018 | Never finaled issued Aug 2018, no final | 1201 Illinois St | to demolish a 1-story storage oDetails
to demolish a 1-story storage o | $20,000 |
| Jan 25, 2018 | Expired or cancelled cancelled Nov 2022 | 1300 Evans Av | removal (e) 30,000 gallon diesel tank. install (n) 30,000 gallon fuel tank, piping, electrical, shoring.Details
removal (e) 30,000 gallon diesel tank. install (n) 30,000 gallon fuel tank, piping, electrical, shoring. | $500,000 |
| Mar 10, 2017 | Never finaled issued Jun 2017, no final | 1301 Illinois St | soil remediation:remove (e)utilities&buried strucs,excavate soil to 5-8' below grd surface,in-site soil solidification,remove&cap a sec of abandoned undergrd concrete intake pipe,backfill w/clean imported fill,&instl&/or repair durable covers crushed stone,or asphalt pavement.elec&plum sep.Details
soil remediation:remove (e)utilities&buried strucs,excavate soil to 5-8' below grd surface,in-site soil solidification,remove&cap a sec of abandoned undergrd concrete intake pipe,backfill w/clean imported fill,&instl&/or repair durable covers crushed stone,or asphalt pavement.elec&plum sep. | $5,448,339 |
| Mar 10, 2017 | Never finaled issued Jun 2017, no final | 1201 Illinois St | soil remediation: remove(e)utilities&buried struc excavte soil to 5-8' below grd surface.in site solidification of soil,jet grouting,replc(e)bulkhead w/new sheetpile bulkhead,backfill w/clean imported fill& instl/repair durable covers gravel,or asphalt pavement,demo,elec&plumb obtain seated/complianDetails
soil remediation: remove(e)utilities&buried struc excavte soil to 5-8' below grd surface.in site solidification of soil,jet grouting,replc(e)bulkhead w/new sheetpile bulkhead,backfill w/clean imported fill& instl/repair durable covers gravel,or asphalt pavement,demo,elec&plumb obtain seated/complian | $5,448,339 |
| Apr 21, 2014 | Completed final sign-off Sep 2014 | 1529 Beach St | remedial excavation of backyard supported by cdf slots. compliance with ord 155 13 exemptedDetails
remedial excavation of backyard supported by cdf slots. compliance with ord 155 13 exempted | $50,000 |
| Apr 21, 2014 | Completed final sign-off Sep 2014 | 1525 Beach St | remedial excavaton of backyard supported by cdf slots. compliance with ord no 15-13 expemptedDetails
remedial excavaton of backyard supported by cdf slots. compliance with ord no 15-13 expempted | $50,000 |
| Aug 27, 2013 | Completed final sign-off Oct 2013 | 1401 19th Av | remove 9x9x6" thick concrete slab & chain link fence surrounding concrete slab-chain link fence approx 6' tall. patch 9x9 area with ashphalt.Details
remove 9x9x6" thick concrete slab & chain link fence surrounding concrete slab-chain link fence approx 6' tall. patch 9x9 area with ashphalt. | $9,000 |
| Sep 14, 2012 | Never finaled issued Sep 2012, no final | 133 Steuart St | revision to pa# 2012-0119-2518-prepare trenches for plumbing work covered under pa# 2012-0119-2518, work to include concrete demo & new concrete placement.Details
revision to pa# 2012-0119-2518-prepare trenches for plumbing work covered under pa# 2012-0119-2518, work to include concrete demo & new concrete placement. | $15,000 |
| May 31, 2012 | Completed final sign-off Oct 2012 | 1549 Beach St | demo(e)hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior; backfill to(e)grade; rough grading; sloping used to excavate arouDetails
demo(e)hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior; backfill to(e)grade; rough grading; sloping used to excavate arou | $250,000 |
| May 31, 2012 | Completed final sign-off Oct 2012 | 1555 Beach St | demo (e) hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches is 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior, backfill to (e) grade; rough grading; sloping used to excavaDetails
demo (e) hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches is 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior, backfill to (e) grade; rough grading; sloping used to excava | $250,000 |
| May 31, 2012 | Completed final sign-off Oct 2012 | 1545 Beach St | demo (e) hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches is 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior; backfill to (e) grade; rough grading; sloping used to excavaDetails
demo (e) hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches is 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior; backfill to (e) grade; rough grading; sloping used to excava | $250,000 |