J. Flores Construction Company Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Oct 2025
- Last 24 months
- 2 permits filed
41 permits since 2000: 31 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2025 | In progress issued Oct 2025 | 100 Columbus Av | revision to pa 202503172345 relocate services to avoid architectural designDetails
revision to pa 202503172345 relocate services to avoid architectural design | |
| Mar 17, 2025 | In progress issued Apr 2025 | 100 Columbus Av | install 21 linear feet of 6" fire water ductile iron pipe cl53 before bfpv, 116 near feet of 6" cl53 after bfpv and 1 ea of 6" fire water backflow preventer (bfpv) wikins 35d astda w/ oslv valves. with underground.Details
install 21 linear feet of 6" fire water ductile iron pipe cl53 before bfpv, 116 near feet of 6" cl53 after bfpv and 1 ea of 6" fire water backflow preventer (bfpv) wikins 35d astda w/ oslv valves. with underground. | $87,062 |
| Mar 21, 2023 | Completed final sign-off Jun 2023 | 55 Cravath St | install approximtely 20 linear feet of 6" ductile iron pipe from point of connection at curb to fire sprinkler lateral at 5 feet from face of building, installed by others also installing 6' flextendDetails
install approximtely 20 linear feet of 6" ductile iron pipe from point of connection at curb to fire sprinkler lateral at 5 feet from face of building, installed by others also installing 6' flextend | $238,425 |
| Mar 9, 2023 | Completed final sign-off Dec 2023 | 552 Capp St | install 47 linear ft of 6" fire water cl53 pipe, lea 6" fire water wilkins 350 backflow preventer, 2-way fire department connection and 6" outside bldg fire riser.Details
install 47 linear ft of 6" fire water cl53 pipe, lea 6" fire water wilkins 350 backflow preventer, 2-way fire department connection and 6" outside bldg fire riser. | $189,186 |
| Feb 10, 2020 | Completed final sign-off Nov 2020 | 2230 Jerrold Av | install approximately 50 feet of 8" fire water pipe (underground) 6x4 way fdc, 8x4 8" wilking 450 backflow preventer, transition coupling, also 6" fire water pipe, 13ftDetails
install approximately 50 feet of 8" fire water pipe (underground) 6x4 way fdc, 8x4 8" wilking 450 backflow preventer, transition coupling, also 6" fire water pipe, 13ft | $65,000 |
| Dec 3, 2019 | Completed final sign-off Feb 2021 | 490 West Portal Av | we will install 90 linear feet of 8"dip and 8" ddcDetails
we will install 90 linear feet of 8"dip and 8" ddc | $160,000 |
| Sep 4, 2019 | Completed final sign-off Sep 2019 | 29 Kirkwood Av | to obtain final inspection for work approved under pa #201705176900. all work is complete.Details
to obtain final inspection for work approved under pa #201705176900. all work is complete. | |
| Sep 4, 2019 | Completed final sign-off Feb 2020 | 580 Hudson Av | to obtain final inspection for work approved under pa #201705176902. all work is complete.Details
to obtain final inspection for work approved under pa #201705176902. all work is complete. | |
| Sep 4, 2019 | Completed final sign-off Sep 2019 | 3 Kirkwood Av | to obtain final inspection for work approved under pa #201705176901. all work is complete.Details
to obtain final inspection for work approved under pa #201705176901. all work is complete. | |
| Aug 28, 2018 | Never finaled issued Aug 2018, no final | 651 08th Ti St | install new fire water service undergrounf including 1 back floe preventer and fire riser. no inside bld work sprinkler permit # 201806050966.Details
install new fire water service undergrounf including 1 back floe preventer and fire riser. no inside bld work sprinkler permit # 201806050966. | $39,900 |
| Aug 1, 2017 | Completed final sign-off Nov 2018 | 2451 Sacramento St | install underground fire water utility piping from back of curb to and including double detector check valve assembly with fdc and on site piping to just outside bldg at which point others will attach and complete upgrading existing city rad residential facility. ref sp permit 201611213191.Details
install underground fire water utility piping from back of curb to and including double detector check valve assembly with fdc and on site piping to just outside bldg at which point others will attach and complete upgrading existing city rad residential facility. ref sp permit 201611213191. | $41,400 |
| May 17, 2017 | Completed final sign-off Jan 2019 | 77 Kirkwood Av | install underground fire water on site. n/a for maher ordinance.Details
install underground fire water on site. n/a for maher ordinance. | $43,300 |
| May 17, 2017 | Completed final sign-off Nov 2019 | 3 Kirkwood Av | install underground fire water on site. n/a for maher ordinance.Details
install underground fire water on site. n/a for maher ordinance. | $68,100 |
| May 17, 2017 | Completed final sign-off Jan 2020 | 580 Hudson Av | install underground fire water on site. n/a for maher ordinance.Details
install underground fire water on site. n/a for maher ordinance. | $37,200 |
| May 17, 2017 | Never finaled issued May 2017, no final | 540 Hudson Av | install underground fire water on site. n/a for maher ordinance.Details
install underground fire water on site. n/a for maher ordinance. | $68,100 |
| May 17, 2017 | Completed final sign-off Sep 2018 | 500 Hudson Av | install underground fire water on site. n/a for maher ordinance.Details
install underground fire water on site. n/a for maher ordinance. | $43,300 |
| May 17, 2017 | Completed final sign-off Jan 2019 | 53 Kirkwood Av | install underground fire water on site. n/a for maher ordinance.Details
install underground fire water on site. n/a for maher ordinance. | $68,100 |
| May 17, 2017 | Completed final sign-off Jan 2020 | 29 Kirkwood Av | install underground fire water on site. n/a for maher ordinance.Details
install underground fire water on site. n/a for maher ordinance. | $61,900 |
| May 14, 2015 | Completed final sign-off Aug 2016 | 2155 Webster St | install ~225 ft of ductile iron pipe for 6-inch and 4-inch fire service to townhouses from main bldg.(1) 4" bor stub up; (2) 6" bor stub-ups, (1) 6" supply stub-in and (1) fire hydrant.aboveground sprinkler system under separate appl 2014-06-05-7550-s3,2014-06-05-7555-s3 and 2014-06-05-7554-s3Details
install ~225 ft of ductile iron pipe for 6-inch and 4-inch fire service to townhouses from main bldg.(1) 4" bor stub up; (2) 6" bor stub-ups, (1) 6" supply stub-in and (1) fire hydrant.aboveground sprinkler system under separate appl 2014-06-05-7550-s3,2014-06-05-7555-s3 and 2014-06-05-7554-s3 | $70,000 |
| Feb 11, 2015 | Never finaled issued Feb 2015, no final | 501 Donahue St | a change of addressto application #201411262582 to correct address from 201 friedell st at block 4591c, lot 094 to 501 donahue st at block 4591c, lot 093.Details
a change of addressto application #201411262582 to correct address from 201 friedell st at block 4591c, lot 094 to 501 donahue st at block 4591c, lot 093. | |
| Nov 26, 2014 | Never finaled issued Dec 2014, no final | 201 Friedell St | install 4" and 6" underground pipe, 12"x6" concentric reducer to 6" 90 degree ell, 6" 45 degree ell, fdc and 6 " flange. ref. appl. to extend existing fire service to new location of building riser and install supply piping between two buildings ref 2009.1222.3677. maher n/a.Details
install 4" and 6" underground pipe, 12"x6" concentric reducer to 6" 90 degree ell, 6" 45 degree ell, fdc and 6 " flange. ref. appl. to extend existing fire service to new location of building riser and install supply piping between two buildings ref 2009.1222.3677. maher n/a. | $13,500 |
| Feb 10, 2014 | Completed final sign-off Dec 2015 | 1600 Owens St | install 8" fire service from e 8" fire service @ property line to within 5 ft of building. this involves installing 139 lf of 8" d.i.p., 1, 3 8" flex tends an 8"check detectors assembly with tamper switches and conduit. also, 20 lf of 16" steel sleeve. ref 200711097802. n/a maher ordinance #155-13Details
install 8" fire service from e 8" fire service @ property line to within 5 ft of building. this involves installing 139 lf of 8" d.i.p., 1, 3 8" flex tends an 8"check detectors assembly with tamper switches and conduit. also, 20 lf of 16" steel sleeve. ref 200711097802. n/a maher ordinance #155-13 | $139,432 |
| Aug 29, 2012 | Completed final sign-off Jul 2014 | 185 Channel St | new underground 6" fire service off of 12" main on 4th st. ref 201104224606Details
new underground 6" fire service off of 12" main on 4th st. ref 201104224606 | $100,000 |
| May 3, 2012 | Expired or cancelled cancelled Jan 2026 | 1595 Pacific Av | installation of fire servcie underground. approved oh sprinkler under pa # 2012-0228-5003Details
installation of fire servcie underground. approved oh sprinkler under pa # 2012-0228-5003 | |
| Nov 4, 2009 | Expired or cancelled expired Mar 2013 | 1520 Oakdale Av | install 22 linear feet of 6" ductile iron pipe, 3 linear feet of 6" pvc c900 class 200 pipe, 11 linear feet of 4" ductile iron pipe, 1 ea 6 " ddcv, 1 ea 6 " asr, 2 each 4" fdc, 1 ea tie in for fire serviceDetails
install 22 linear feet of 6" ductile iron pipe, 3 linear feet of 6" pvc c900 class 200 pipe, 11 linear feet of 4" ductile iron pipe, 1 ea 6 " ddcv, 1 ea 6 " asr, 2 each 4" fdc, 1 ea tie in for fire service | $33,000 |
| Dec 12, 2008 | Never finaled issued Dec 2008, no final | 5600 03rd St | install 10 linear feet of 6" fire line d.i.p and a riser on bancroft avenue. refer to detail "a" on plansDetails
install 10 linear feet of 6" fire line d.i.p and a riser on bancroft avenue. refer to detail "a" on plans | $2,500 |
| Sep 14, 2007 | Completed final sign-off Oct 2007 | 420 Berry St | renew pa# 200603136353, 200506165290 for final inspectionDetails
renew pa# 200603136353, 200506165290 for final inspection | |
| Sep 14, 2007 | Completed final sign-off Oct 2007 | 420 Berry St | renew pa# 200608018190, 200508039400 for final inspectionDetails
renew pa# 200608018190, 200508039400 for final inspection | |
| Mar 13, 2006 | Completed final sign-off Oct 2007 | 420 Berry St | installing underground piping and adding 2 onsite fire hydrants for residential development.Details
installing underground piping and adding 2 onsite fire hydrants for residential development. | $110,000 |
| Jul 9, 2005 | Completed final sign-off Feb 2006 | 2920 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Jul 9, 2005 | Completed final sign-off Feb 2006 | 2968 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Jul 9, 2005 | Completed final sign-off Mar 2006 | 2980 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Jul 9, 2005 | Completed final sign-off Feb 2006 | 2900 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Jul 9, 2005 | Completed final sign-off Feb 2006 | 2992 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Jul 9, 2005 | Completed final sign-off Feb 2006 | 2914 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Jul 9, 2005 | Completed final sign-off Feb 2006 | 2926 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Jul 9, 2005 | Completed final sign-off Feb 2006 | 2942 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Jul 9, 2005 | Completed final sign-off Feb 2006 | 2936 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Jul 9, 2005 | Completed final sign-off Feb 2006 | 2984 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Jul 9, 2005 | Completed final sign-off Mar 2006 | 2956 Arelious Walker Dr | excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service perDetails
excavate, trench + install 2" & 2 1/2" copper piping for domestic water service +fire service per | $4,000 |
| Aug 6, 2002 | Never finaled issued Aug 2002, no final | 11 Harding Rd | installing new undeground fire sprinkler piping in field areaDetails
installing new undeground fire sprinkler piping in field area | $310,000 |