Block 0636, lot 038
2451 Sacramento St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Lot
- 23,667 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 5, 2024 | Completed final sign-off Apr 2024 | 2451 Sacramento St | B B J Electric, Inc | to verify existing sound levels in sleeping areas, complying with sffc section 1109.7.6.1Details
to verify existing sound levels in sleeping areas, complying with sffc section 1109.7.6.1 | |
| Nov 27, 2019 | Never finaled issued Nov 2019, no final | 2451 Sacramento St | Nibbi Bros Assoc Inc. | street spaceDetails
street space | |
| Sep 12, 2018 | Never finaled issued Sep 2018, no final | 2451 Sacramento St | street spaceDetails
street space | ||
| Sep 5, 2018 | Completed final sign-off Nov 2018 | 2451 Sacramento St | Alcal Specialty Contracting Inc. | reroofing.Details
reroofing. | $95,000 |
| Aug 8, 2018 | Never finaled issued Aug 2018, no final | 2451 Sacramento St | street spaceDetails
street space | ||
| Aug 8, 2018 | Never finaled filed Aug 2018, never issued | 2451 Sacramento St | street space/mta metersDetails
street space/mta meters | ||
| Jul 11, 2018 | Never finaled issued Nov 2018, no final | 2451 Sacramento St | Nibbi Bros Assoc Inc. | improvements to (e) emergency generator, replace fuel oil tank. ** maher: n/a **Details
improvements to (e) emergency generator, replace fuel oil tank. ** maher: n/a ** | $25,000 |
| Jun 20, 2018 | Completed final sign-off Nov 2018 | 2451 Sacramento St | B B J Electric, Inc | ref app#201703141381. add 8 monitor modules to monitor. 2 way communcation system (2). water flow (1) and tampers (3) and os and y (2). t.i. ref app#201509025917. **maher n/a**Details
ref app#201703141381. add 8 monitor modules to monitor. 2 way communcation system (2). water flow (1) and tampers (3) and os and y (2). t.i. ref app#201509025917. **maher n/a** | $4,100 |
| Jun 20, 2018 | Completed final sign-off Oct 2018 | 2451 Sacramento St | B B J Electric, Inc | provide and install an elevator landing 2 way communication system. t.i. ref app#201509025917. ** maher n/a**Details
provide and install an elevator landing 2 way communication system. t.i. ref app#201509025917. ** maher n/a** | $55,200 |
| Jun 12, 2018 | Never finaled issued Jun 2018, no final | 2451 Sacramento St | streetspaceDetails
streetspace | ||
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 2451 Sacramento St | street space permit and mta permit - renewal of permit # 1444437Details
street space permit and mta permit - renewal of permit # 1444437 | ||
| Dec 20, 2017 | Completed final sign-off Nov 2018 | 2451 Sacramento St | Nibbi Bros Inc. | revision to app#201509025917. upgrade of 5 apartments to mobility/ada accessibility including reconfigured kitchens and bathrooms. also to resolve n.o.v. 201700491(fire damaged repiar in kind), in units 908 & 909 (plans not included in drawing set)Details
revision to app#201509025917. upgrade of 5 apartments to mobility/ada accessibility including reconfigured kitchens and bathrooms. also to resolve n.o.v. 201700491(fire damaged repiar in kind), in units 908 & 909 (plans not included in drawing set) | $75,000 |
| Oct 24, 2017 | Never finaled issued Nov 2017, no final | 2451 Sacramento St | street space w/mtaDetails
street space w/mta | ||
| Aug 1, 2017 | Completed final sign-off Nov 2018 | 2451 Sacramento St | J. Flores Construction Company Inc | install underground fire water utility piping from back of curb to and including double detector check valve assembly with fdc and on site piping to just outside bldg at which point others will attach and complete upgrading existing city rad residential facility. ref sp permit 201611213191.Details
install underground fire water utility piping from back of curb to and including double detector check valve assembly with fdc and on site piping to just outside bldg at which point others will attach and complete upgrading existing city rad residential facility. ref sp permit 201611213191. | $41,400 |
| Jul 31, 2017 | Never finaled issued Jul 2017, no final | 2451 Sacramento St | street spaceDetails
street space | ||
| Jun 20, 2017 | Never finaled issued Jun 2017, no final | 2451 Sacramento St | street spaceDetails
street space | ||
| Jun 1, 2017 | Completed final sign-off Oct 2018 | 2451 Sacramento St | Priority Architectural Graphics Dba Prio | 11 evac maps - floors 1 thru 11. maher naDetails
11 evac maps - floors 1 thru 11. maher na | $4,400 |
| May 16, 2017 | Never finaled filed May 2017, never issued | 2451 Sacramento St | street space permitDetails
street space permit | ||
| Mar 14, 2017 | Completed final sign-off Oct 2018 | 2451 Sacramento St | B B J Electric, Inc | replace (e) facu, install 4 10 amp power supply, 7 manual pull station, 27 smokes, 17 heats, 51 monitor modules, 18 strobes, 116 low frequency horns, 5 low frequency horn/strobe. ref app#201509025917Details
replace (e) facu, install 4 10 amp power supply, 7 manual pull station, 27 smokes, 17 heats, 51 monitor modules, 18 strobes, 116 low frequency horns, 5 low frequency horn/strobe. ref app#201509025917 | $48,760 |
| Jan 11, 2017 | Never finaled issued Jan 2017, no final | 2451 Sacramento St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Nov 21, 2016 | Completed final sign-off Oct 2018 | 2451 Sacramento St | Westates Mechanical Corporation Inc | install new sprinkler system on ground floor and in trash chute from 1st flr to 12th flr at every other level. maher na. underground and alarm by others. ref ti 2015-0902-5917.Details
install new sprinkler system on ground floor and in trash chute from 1st flr to 12th flr at every other level. maher na. underground and alarm by others. ref ti 2015-0902-5917. | $25,000 |
| Oct 21, 2016 | Never finaled issued Oct 2016, no final | 2451 Sacramento St | street space/mta parking metersDetails
street space/mta parking meters | ||
| Sep 2, 2015 | Completed final sign-off Dec 2018 | 2451 Sacramento St | Nibbi Bros Assoc Inc. | rad project. accessibility upgrades. ground floor addition, office/common area, lobby renovation, replacement of all storefront, elevator modernization, energy & envelope improvements, unit accessibility upgrades, casework, appliance, fixtures, finishes & lighting upgrades.Details
rad project. accessibility upgrades. ground floor addition, office/common area, lobby renovation, replacement of all storefront, elevator modernization, energy & envelope improvements, unit accessibility upgrades, casework, appliance, fixtures, finishes & lighting upgrades. | $11,000,000 |
| Apr 21, 2014 | Never finaled issued Apr 2014, no final | 2451 Sacramento St | street space and mta parkingDetails
street space and mta parking |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- B B J Electric, Inc (4), Nibbi Bros Assoc Inc. (3), Alcal Specialty Contracting Inc., J. Flores Construction Company Inc, Nibbi Bros Inc., Priority Architectural Graphics Dba Prio, Westates Mechanical Corporation Inc
- Architects
- Eric Robinson (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.