Block 8711, lot 023
1101 04th St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
43 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2019 | Never finaled issued Nov 2019, no final | 1101 04th St | street space | ||
| May 9, 2019 | Never finaled issued May 2019, no final | 185 Channel St | Catmex | install 4 backflow cages to (e) backflow at exterior property per ocii request. maher n/a. inspectors: backflow located on n/e of longbridge at 4th street in front of "the market hall."Details
install 4 backflow cages to (e) backflow at exterior property per ocii request. maher n/a. inspectors: backflow located on n/e of longbridge at 4th street in front of "the market hall." | $20,000 |
| Mar 26, 2019 | Never finaled issued Mar 2019, no final | 185 Channel St | Red Hawk Fire & Security Ca Llc | relocate 1 (e) strobe in garage levelDetails
relocate 1 (e) strobe in garage level | $600 |
| Jan 22, 2019 | Completed final sign-off Oct 2019 | 185 Channel St | Union Rolling Door Company | on 1st floor - alter egress, install garage door on 2nd fl0or garage and relocate or install new exit signs in parking garage. n/a for maherDetails
on 1st floor - alter egress, install garage door on 2nd fl0or garage and relocate or install new exit signs in parking garage. n/a for maher | $11,650 |
| Dec 21, 2018 | Never finaled issued Jan 2019, no final | 1101 04th St | Durkin Signs & Graphics Inc | to erect electric, single faced sign. install one illuminated single-face sign.Details
to erect electric, single faced sign. install one illuminated single-face sign. | $3,675 |
| Dec 21, 2018 | Never finaled issued Jan 2019, no final | 1101 04th St | Durkin Signs & Graphics Inc | to erect electric, single gaced sign. install one illuminated single-face sign.Details
to erect electric, single gaced sign. install one illuminated single-face sign. | $3,675 |
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 1101 04th St | street space | ||
| Nov 16, 2018 | Never finaled issued Dec 2018, no final | 1101 04th St | Durkin Signs & Graphics Inc | electric sign dbl faced | $7,250 |
| Nov 16, 2018 | Never finaled issued Dec 2018, no final | 1101 04th St | Durkin Signs & Graphics Inc | "gus's community market" sign electric signDetails
"gus's community market" sign electric sign | $10,250 |
| Nov 8, 2018 | Never finaled issued Nov 2018, no final | 1101 04th St | Commercial Fire Protection Inc | 1 horn strobe relocated, 1 strobe only add to existing vac. 3 horn strobes added to e power supplyDetails
1 horn strobe relocated, 1 strobe only add to existing vac. 3 horn strobes added to e power supply | $15,000 |
| Oct 30, 2018 | Completed final sign-off Dec 2018 | 1101 04th St | Commercial Fire Protection Inc | 1st flr fire sprinkler. t.i for market modification of (e) sprinkler system as per new layoutDetails
1st flr fire sprinkler. t.i for market modification of (e) sprinkler system as per new layout | $26,000 |
| Sep 5, 2018 | Completed final sign-off Dec 2018 | 1101 04th St | California Fire And Safety | re purpose (e) ansul suystem to protect new appliance line up. relocate (e) ul300 ansul system. n/a for maher.Details
re purpose (e) ansul suystem to protect new appliance line up. relocate (e) ul300 ansul system. n/a for maher. | $3,400 |
| Aug 7, 2018 | Completed final sign-off Jan 2019 | 1101 04th St | John Sutti & Associates, Inc. | ti to (e) market. (n) entrance. (n) ada ramp from (e) parking. (n) partitions at meat department. remodel coffee/bar area. replace refrigerated display cases. relocate lights & fixtures. modifications to (e) salesfloor shelving, checkstands & bulk fixtures. (n) coolers. maher naDetails
ti to (e) market. (n) entrance. (n) ada ramp from (e) parking. (n) partitions at meat department. remodel coffee/bar area. replace refrigerated display cases. relocate lights & fixtures. modifications to (e) salesfloor shelving, checkstands & bulk fixtures. (n) coolers. maher na | $190,000 |
| Dec 6, 2016 | Expired or cancelled cancelled Jan 2026 | 185 Channel St | Stanford Sign & Awning Dba Western Sign | to erect electric, single faced sign. ** maher: n/a ** | $4,000 |
| Dec 6, 2016 | Expired or cancelled cancelled Jan 2026 | 185 Channel St | Stanford Sign & Awning Dba Western Sign | to erect electric, double faced sign. ** maher: n/a ** | $4,000 |
| Dec 6, 2016 | Expired or cancelled cancelled Jan 2026 | 185 Channel St | Stanford Sign & Awning Dba Western Sign | to erect electric, single faced sign. ** maher: n/a ** | $4,000 |
| Jun 13, 2016 | Expired or cancelled cancelled Jan 2026 | 1101 04th St | Stanford Sign & Awning Dba Western Sign | install 2 illuminated projecting signs attached to extg canopy. n/a for maherDetails
install 2 illuminated projecting signs attached to extg canopy. n/a for maher | $4,000 |
| Jun 13, 2016 | Expired or cancelled cancelled Jan 2026 | 1101 04th St | Stanford Sign & Awning Dba Western Sign | install (1) illuminated single faced sign. maher na | $2,000 |
| Jun 13, 2016 | Expired or cancelled cancelled Jan 2026 | 1101 04th St | Stanford Sign & Awning Dba Western Sign | install (1) illuminated single faced sign on existing canopy. maher naDetails
install (1) illuminated single faced sign on existing canopy. maher na | $2,000 |
| Mar 2, 2016 | Completed final sign-off Mar 2016 | 1101 04th St | Firemaster | install a ul300 ansul kitchen suppression system maher naDetails
install a ul300 ansul kitchen suppression system maher na | $6,000 |
| Nov 13, 2015 | Completed final sign-off Mar 2016 | 1101 04th St | Siemens Industry, Inc. | fire alarm work for the "market hall". ti remodel on floor 1; additions are 9 duct detectors, 6 modules, 1 horn/strobe power supply, 12 horn/strobes, and 6 strobes. ref pa 2014-0624-9270Details
fire alarm work for the "market hall". ti remodel on floor 1; additions are 9 duct detectors, 6 modules, 1 horn/strobe power supply, 12 horn/strobes, and 6 strobes. ref pa 2014-0624-9270 | $19,400 |
| Sep 10, 2015 | Never finaled issued Sep 2015, no final | 1101 04th St | street space | ||
| Mar 12, 2015 | Completed final sign-off Jan 2019 | 1101 04th St | Jaime Partners Inc. | revision to 201406249270. removal of lift to mezzanine and replace with stairs mezzanine for storage. no office use. sprinkler and fire alarm on sep permitDetails
revision to 201406249270. removal of lift to mezzanine and replace with stairs mezzanine for storage. no office use. sprinkler and fire alarm on sep permit | $2,000 |
| Jun 24, 2014 | Completed final sign-off Mar 2016 | 1101 04th St | Jaime Partners Inc. | new interior partitions, mep and new finishes. sprinkler and fire alarm on separate permit. ref pa# 2013/10/15/9237. ** maher: compliance with ordinance no# 155-13 not required **Details
new interior partitions, mep and new finishes. sprinkler and fire alarm on separate permit. ref pa# 2013/10/15/9237. ** maher: compliance with ordinance no# 155-13 not required ** | $220,000 |
| Apr 28, 2014 | Completed final sign-off Jul 2014 | 185 Channel St | Decker Electric Co Inc Electrical Contra | installation of elevator landing 2-way communications system in a residential building.Details
installation of elevator landing 2-way communications system in a residential building. | $27,000 |
| Feb 3, 2014 | Never finaled issued Mar 2014, no final | 185 Channel St | Maguire Inc Dba Lahue And Associates | to erect new electrical channel bilding identification sign. n/a for the maher ordinance #155-13Details
to erect new electrical channel bilding identification sign. n/a for the maher ordinance #155-13 | $3,500 |
| Feb 3, 2014 | Never finaled issued Mar 2014, no final | 185 Channel St | Maguire Inc Dba Lahue And Associates | to erect new electrical channel building identification sign. n/a for the maher ordinance #155-13Details
to erect new electrical channel building identification sign. n/a for the maher ordinance #155-13 | $4,500 |
| Dec 31, 2013 | Completed final sign-off Feb 2014 | 1101 04th St | R 3 Builders Inc. | revision to pa201310159237; change in finish floor slabDetails
revision to pa201310159237; change in finish floor slab | $5,000 |
| Oct 17, 2013 | Completed final sign-off Jul 2014 | 185 Channel St | Maguire Inc Dba Lahue And Associates | 1st thru 8th floors-evacuation signs-64 totalDetails
1st thru 8th floors-evacuation signs-64 total | $19,200 |
| Oct 15, 2013 | Completed final sign-off Feb 2014 | 1101 04th St | R 3 Builders Inc. | interior core and shell. (new building pa 201104224606 is not complete todate) to include new makeup auir and exhaust, space conditioning for future retail space and finish floor slabDetails
interior core and shell. (new building pa 201104224606 is not complete todate) to include new makeup auir and exhaust, space conditioning for future retail space and finish floor slab | $450,000 |
| Aug 16, 2013 | Never finaled issued Aug 2013, no final | 185 Channel St | street space | ||
| May 24, 2013 | Completed final sign-off May 2014 | 185 Channel St | Bay City Mechanical Inc | install 80' 16ga grease duct in two hour shaft or wrapped in 3 m product from 1st floor to roof for future use. 2 hour with 90 minute rated doors provided on each floor. exhaust hood under seperate permitDetails
install 80' 16ga grease duct in two hour shaft or wrapped in 3 m product from 1st floor to roof for future use. 2 hour with 90 minute rated doors provided on each floor. exhaust hood under seperate permit | $10,000 |
| Jan 23, 2013 | Never finaled issued Jan 2013, no final | 185 Channel St | street space | ||
| Aug 31, 2012 | Expired or cancelled withdrawn Dec 2012 | 185 Channel St | Edward W. Scott | complete fire alarm system to be installed for new multi -unit. residential building- sprinkler monitoring, duct detectors and elevator recall.Details
complete fire alarm system to be installed for new multi -unit. residential building- sprinkler monitoring, duct detectors and elevator recall. | $70,000 |
| Aug 29, 2012 | Completed final sign-off Jul 2014 | 185 Channel St | J. Flores Construction Company Inc | new underground 6" fire service off of 12" main on 4th st. ref 201104224606Details
new underground 6" fire service off of 12" main on 4th st. ref 201104224606 | $100,000 |
| Jul 23, 2012 | Never finaled issued Jul 2012, no final | 185 Channel St | street space permit | ||
| Jan 3, 2012 | Never finaled issued Jan 2012, no final | 185 Channel St | street space | ||
| Dec 29, 2011 | Completed final sign-off May 2014 | 185 Channel St | Nibbi Bros Assoc Inc. | erection & operation of tower crane located on job site. site pa# 201104224606. for two cranes on same job site.Details
erection & operation of tower crane located on job site. site pa# 201104224606. for two cranes on same job site. | $56,250 |
| Aug 9, 2011 | Completed final sign-off May 2014 | 185 Channel St | Nibbi Bros Assoc Inc. | remove asphalt parking surface and compact soil to prepare lot for pile drivingDetails
remove asphalt parking surface and compact soil to prepare lot for pile driving | $72,000 |
| Jun 20, 2011 | Completed final sign-off May 2014 | 185 Channel St | Nibbi Bros Assoc Inc. | drive 29 indicator test piles on vacant lotDetails
drive 29 indicator test piles on vacant lot | $200,000 |
| Apr 22, 2011 | Completed final sign-off Jul 2014 | 185 Channel St | Nibbi Bros Assoc Inc. | to erect 8 stories, 315 units residential, retail, parking building.Details
to erect 8 stories, 315 units residential, retail, parking building. | $71,000,000 |
| Mar 8, 2011 | Never finaled issued Mar 2011, no final | 1101 04th St | add address for new proposed structure.Details
add address for new proposed structure. | ||
| Mar 8, 2011 | Never finaled issued Mar 2011, no final | 105 Channel St | add address for new building. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Stanford Sign & Awning Dba Western Sign (6), Durkin Signs & Graphics Inc (4), Nibbi Bros Assoc Inc. (4), Maguire Inc Dba Lahue And Associates (3), Commercial Fire Protection Inc (2), Jaime Partners Inc. (2), R 3 Builders Inc. (2), Bay City Mechanical Inc, California Fire And Safety, Catmex, Decker Electric Co Inc Electrical Contra, Edward W. Scott, Firemaster, J. Flores Construction Company Inc, John Sutti & Associates, Inc., Red Hawk Fire & Security Ca Llc, Siemens Industry, Inc., Union Rolling Door Company
- Architects
- David Buck, Louis Felthouse
- Engineers
- Brett Saners (3), Marc Press, Richard Laureta
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.