Block 3733, lot 093
266 04th St
- City’s use
- Multi-Family Residential
- Built
- 1962
- Stories
- 1
- Rooms
- 2 bathrooms
- Lot
- 14,797 sq ft
- Zoning
- M1
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 7, 2022 | Never finaled issued Mar 2023, no final | 266 04th St | Sabah International Incorporated | revised as built bpa #201701177260.sequence of operations matrix for addition of the traction power emergency power off(epo)control.add(2)addressable input modules for epo status monitoring,(1)addressable output module for epo trigger.Details
revised as built bpa #201701177260.sequence of operations matrix for addition of the traction power emergency power off(epo)control.add(2)addressable input modules for epo status monitoring,(1)addressable output module for epo trigger. | |
| Jan 27, 2022 | Never finaled issued Apr 2022, no final | 266 04th St | Tutor Perini Corporation | modify permit for central subway yerba buena moscone station to accommodate anchor bolts in foundation for future public art sculpture. foundation for sculpture added as an extension to stuctural beams under pa# 202106102139Details
modify permit for central subway yerba buena moscone station to accommodate anchor bolts in foundation for future public art sculpture. foundation for sculpture added as an extension to stuctural beams under pa# 202106102139 | $25,000 |
| Jun 10, 2021 | Never finaled issued Jun 2021, no final | 266 04th St | Tutor Perini Corporation | modify permit for central subway yerba buena moscone station to accommodate future public art sculpture. foundation for sculpture added as an extension to structural beams. waterproofing amended to be located unerneath concrete topping slab. ref pa 201209190112.Details
modify permit for central subway yerba buena moscone station to accommodate future public art sculpture. foundation for sculpture added as an extension to structural beams. waterproofing amended to be located unerneath concrete topping slab. ref pa 201209190112. | $125,000 |
| Nov 12, 2020 | Never finaled issued Apr 2021, no final | 266 04th St | Tutor Perini Corporation | install new fire department connection that connects to (e) central subway 6" standpipe system. location of street level fdc is near 460 04th st. sffd phone system under f/a permit.Details
install new fire department connection that connects to (e) central subway 6" standpipe system. location of street level fdc is near 460 04th st. sffd phone system under f/a permit. | |
| Jul 23, 2019 | Expired or cancelled withdrawn Oct 2025 | 266 04th St | mayor dir 17-02: 100% affordable transit-oriented(tod) mixed-used. to erect 8 stories, no basement, type i-a & i-b, 70 units multi family residential with mix used building. (r-2, a-3, m) ** maher: n/a **Details
mayor dir 17-02: 100% affordable transit-oriented(tod) mixed-used. to erect 8 stories, no basement, type i-a & i-b, 70 units multi family residential with mix used building. (r-2, a-3, m) ** maher: n/a ** | $33,750,000 | |
| Nov 30, 2018 | Completed final sign-off Feb 2022 | 266 04th St | Tutor Perini Corporation | fire line service (underground) from street to buildingDetails
fire line service (underground) from street to building | $1,000 |
| Jun 29, 2017 | Completed final sign-off Nov 2022 | 266 04th St | Sabah International Incorporated | provide a new fire alarm system at the new yerba buena/moscone light rail station 1255. site bldg p/a#2012-0919-0112.Details
provide a new fire alarm system at the new yerba buena/moscone light rail station 1255. site bldg p/a#2012-0919-0112. | $192,950 |
| Jun 13, 2017 | Completed final sign-off Mar 2023 | 266 04th St | Sabah International Incorporated | ref #2012-0919-0112 (general contractor permit #) provide 92) customer build deluge panels. maher n/a.Details
ref #2012-0919-0112 (general contractor permit #) provide 92) customer build deluge panels. maher n/a. | $72,000 |
| Mar 30, 2017 | Completed final sign-off Oct 2022 | 266 04th St | Cosco Fire Protection Inc. | install wet fire sprinkler systems, 5 preaction systems, and track deluge systems for new subway station. total 690 sprinklers covering ~100,000 sq ft, requiring 620 gpm @ 48 psi. ref #201209190112.Details
install wet fire sprinkler systems, 5 preaction systems, and track deluge systems for new subway station. total 690 sprinklers covering ~100,000 sq ft, requiring 620 gpm @ 48 psi. ref #201209190112. | $1,200,000 |
| Jan 17, 2017 | Completed final sign-off Mar 2023 | 266 04th St | Sabah International Incorporated | install new fm-200 fire suppression system to protect 4 areas - comm room, tcs/tcu room, main electrical, traction power, total 26 cylinders. ref #201209190112, sprinkler ref 201703302767, fa ref pa 201706290717 (maher ordinance - extended no.155-13 n/a)Details
install new fm-200 fire suppression system to protect 4 areas - comm room, tcs/tcu room, main electrical, traction power, total 26 cylinders. ref #201209190112, sprinkler ref 201703302767, fa ref pa 201706290717 (maher ordinance - extended no.155-13 n/a) | $596,289 |
| Nov 4, 2013 | Never finaled issued Nov 2013, no final | 800 Folsom St | Golden Gatetank Removal,Inc | underground tank removal. perform excavation for removal of 3 underground fuel storage tanks. backfill w/ stockpiling soil to 4 feet below grade.Details
underground tank removal. perform excavation for removal of 3 underground fuel storage tanks. backfill w/ stockpiling soil to 4 feet below grade. | $100,000 |
| Sep 19, 2012 | Completed final sign-off May 2023 | 266 04th St | Tutor Perini Corporation | demolish 1 story, type 5 gas station.Details
demolish 1 story, type 5 gas station. | $200,000 |
| Sep 19, 2012 | Completed final sign-off Jun 2025 | 266 04th St | Tutor Perini Corporation | erect central transit subway station.Details
erect central transit subway station. | $38,314,494 |
| Nov 20, 2008 | Expired or cancelled expired Jan 2010 | 800 Folsom St | Tait Environmental Services Inc | install veeder root "in station diagnostics" (isd) at existing fuel dispenser & monitoring panel. all low voltage wiring.Details
install veeder root "in station diagnostics" (isd) at existing fuel dispenser & monitoring panel. all low voltage wiring. | $5,000 |
| Jun 18, 2008 | Completed final sign-off Nov 2008 | 800 Folsom St | Tait Environmental Services Inc | install enhanced vapor recovery system as per california state mandate.Details
install enhanced vapor recovery system as per california state mandate. | $17,000 |
| Jan 27, 2005 | Expired or cancelled expired May 2007 | 800 Folsom St | Jeff Hortick Construction Co. | erect a double faced electric ground signDetails
erect a double faced electric ground sign | |
| Jan 27, 2005 | Never finaled issued Jun 2005, no final | 800 Folsom St | Jeff Hortick Construction Co. | erect a single faced electric wall signDetails
erect a single faced electric wall sign | |
| Jan 27, 2005 | Never finaled issued Jun 2005, no final | 800 Folsom St | Jeff Hortick Construction Co. | erect a single faced, non-electric signDetails
erect a single faced, non-electric sign | |
| Sep 8, 2003 | Completed final sign-off Nov 2003 | 800 Folsom St | dyno no meter & pit installation in a gas station auto repair garage contact peter:777-1818Details
dyno no meter & pit installation in a gas station auto repair garage contact peter:777-1818 | $4,000 | |
| Feb 13, 2002 | Expired or cancelled expired Aug 2002 | 800 Folsom St | street space and sidewalk repairDetails
street space and sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tutor Perini Corporation (6), Sabah International Incorporated (4), Jeff Hortick Construction Co. (3), Tait Environmental Services Inc (2), Cosco Fire Protection Inc., Golden Gatetank Removal,Inc
- Architects
- Roy Pedro (2), Denis Henmi, Michael Willis, Paul Mcelwee, Stantec Architecture, Inc.
- Engineers
- Chris Hawkins -Emerg Ventilation, Dolle Yung -Electrical Pe, Fdi Walieddine -Electrical, Kenneth Johnson -Geotechnical, Lang Huey, Marco Sgknu, Paul O'neill, Timothy Chung Tai Lee, Wuthea Seng
- Authorized agent-otherss
- Gary Elgenson, Peter Lam
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.