Block 3749, lot 058
390 01st St
- City’s use
- Multi-Family Residential
- Lot
- 18,748 sq ft
- Zoning
- RC4
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
32 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 12, 2022 | Expired or cancelled cancelled Jan 2026 | 390 01st St | Insign Electric | install (1) illumianted single faced interior window sign "open"Details
install (1) illumianted single faced interior window sign "open" | $1,500 |
| Apr 12, 2022 | Never finaled issued Sep 2022, no final | 390 01st St | Insign Electric | install (1) illumianted single faced interior window sign "u up?"Details
install (1) illumianted single faced interior window sign "u up?" | $750 |
| Apr 12, 2022 | Never finaled issued Sep 2022, no final | 390 01st St | Insign Electric | install (1) illumianted single faced interior window sign "we deliver"Details
install (1) illumianted single faced interior window sign "we deliver" | $750 |
| Feb 23, 2022 | Completed final sign-off Feb 2022 | 500 Harrison St | Horizon Retail Construction Inc | change address: 390 1st st, sf ca 94105 (202109098100) to 500 harrison st, sf, ca, 94105Details
change address: 390 1st st, sf ca 94105 (202109098100) to 500 harrison st, sf, ca, 94105 | |
| Dec 30, 2021 | Completed final sign-off Feb 2022 | 390 01st St | Convergint Technologies Llc | fire alarm for t.i. 202109098100. (2) new notification devices to be tied into (e) system. (3) new addressable devices to be tied into (e) system. fan control and music shutdownDetails
fire alarm for t.i. 202109098100. (2) new notification devices to be tied into (e) system. (3) new addressable devices to be tied into (e) system. fan control and music shutdown | $5,000 |
| Dec 29, 2021 | Completed final sign-off Jan 2023 | 390 01st St | Pribuss Engineering Inc | 1/f: modify sprinkler head locations to accommodate new ceiling and partition layout for new bakery retails space. ref ti permit 202109098100Details
1/f: modify sprinkler head locations to accommodate new ceiling and partition layout for new bakery retails space. ref ti permit 202109098100 | $4,384 |
| Sep 9, 2021 | Completed final sign-off Mar 2022 | 390 01st St | Horizon Retail Construction Inc | t.i.finish out space to a cookie shop with new equipment,restroom,finishes and utilities.Details
t.i.finish out space to a cookie shop with new equipment,restroom,finishes and utilities. | $150,000 |
| Jul 27, 2021 | Never finaled issued Sep 2022, no final | 390 01st St | Instant Neon | install sign a, one non-illuminated hanging sign "insominia cookies" - projection signDetails
install sign a, one non-illuminated hanging sign "insominia cookies" - projection sign | $6,000 |
| Jul 27, 2021 | Never finaled issued Sep 2022, no final | 390 01st St | Instant Neon | install sign f, one non-illuminated wall sign "insominia cookies" wall signDetails
install sign f, one non-illuminated wall sign "insominia cookies" wall sign | $2,000 |
| Jul 27, 2021 | Never finaled issued Sep 2022, no final | 390 01st St | Instant Neon | install 2 window vinyl signs (sign c & d) for insomnia cookies.Details
install 2 window vinyl signs (sign c & d) for insomnia cookies. | $1,500 |
| Apr 30, 2021 | Expired or cancelled withdrawn Sep 2021 | 390 01st St | tenant finish out to include new equipment, restroom, finishes, and utilitiesDetails
tenant finish out to include new equipment, restroom, finishes, and utilities | $150,000 | |
| Dec 19, 2019 | Never finaled issued Dec 2019, no final | 500 Harrison St | new address for pa #201601278125s, 500 harrison st at block 3749, lot 058Details
new address for pa #201601278125s, 500 harrison st at block 3749, lot 058 | ||
| Oct 8, 2019 | Completed final sign-off Feb 2021 | 390 01st St | Swinerton Builders | revision to pa# 2016/01/27/8125-s3 (arch / mep). mechanical - smoke control. ** maher: n/a **Details
revision to pa# 2016/01/27/8125-s3 (arch / mep). mechanical - smoke control. ** maher: n/a ** | |
| Sep 24, 2019 | Never finaled issued Oct 2019, no final | 390 01st St | street spaceDetails
street space | ||
| Dec 28, 2018 | Never finaled issued Jan 2019, no final | 390 01st St | street space onlyDetails
street space only | ||
| Sep 19, 2018 | Completed final sign-off Feb 2021 | 390 01st St | Pribuss Engineering Inc | install two new 8" underground fire services. poc to city main to be done by other. new overhead sprinkler system and fire pump under separate permit. referenced architectural 2016.0127.8125. n/a for maher.Details
install two new 8" underground fire services. poc to city main to be done by other. new overhead sprinkler system and fire pump under separate permit. referenced architectural 2016.0127.8125. n/a for maher. | $8,000 |
| Jul 26, 2018 | Completed final sign-off Feb 2021 | 390 01st St | Swinerton Builders | tower crane, erection & dismantleDetails
tower crane, erection & dismantle | $78,000 |
| Apr 21, 2017 | Completed final sign-off Jan 2020 | 390 01st St | Granite Excavation & Demolition Inc, Swinerton Builders | ref pa #2016-0127-8125s. install soil shoring walls on (3) sides of the project (lansing, 1st & harrison st) & excavate down to allow the foundation to be installed during the excavation underground fuel tanks will be removed (under seperate permit) ** maher: yes, route to dph **Details
ref pa #2016-0127-8125s. install soil shoring walls on (3) sides of the project (lansing, 1st & harrison st) & excavate down to allow the foundation to be installed during the excavation underground fuel tanks will be removed (under seperate permit) ** maher: yes, route to dph ** | $1,739,679 |
| Apr 21, 2017 | Completed final sign-off Feb 2021 | 390 01st St | Drill Tech Drilling & Shoring Inc, Swinerton Builders | shoring for new construction. ref pa #2016-0127-8125s. ** maher: disturbance of at least 50 cu.yd of soil. route to dph **Details
shoring for new construction. ref pa #2016-0127-8125s. ** maher: disturbance of at least 50 cu.yd of soil. route to dph ** | $912,165 |
| Oct 14, 2016 | Completed final sign-off Jan 2021 | 390 01st St | Swinerton Builders | soft demo interior of mini mart - no structuralDetails
soft demo interior of mini mart - no structural | $5,000 |
| Sep 30, 2016 | Completed final sign-off Jan 2021 | 390 01st St | Swinerton Builders | canopy 2 - demolish 1-story, type 2, automative service station (union 76).removal canopy only. removal of tanks under separate application. ** maher: n/a **Details
canopy 2 - demolish 1-story, type 2, automative service station (union 76).removal canopy only. removal of tanks under separate application. ** maher: n/a ** | $18,000 |
| Sep 30, 2016 | Completed final sign-off Jan 2021 | 390 01st St | Swinerton Builders | canopy 1 - demolish 1-story, type 2, automative service station (union 76).removal canopy only. removal of tanks under separate application. ** maher: n/a **Details
canopy 1 - demolish 1-story, type 2, automative service station (union 76).removal canopy only. removal of tanks under separate application. ** maher: n/a ** | $20,000 |
| Sep 30, 2016 | Completed final sign-off Jan 2021 | 390 01st St | Swinerton Builders | demolish 1-story, type 1, automative service station (union 76).(main structure). removal bldg only. removal of tanks under separate application. ** maher: n/a **Details
demolish 1-story, type 1, automative service station (union 76).(main structure). removal bldg only. removal of tanks under separate application. ** maher: n/a ** | $40,000 |
| Jan 27, 2016 | Completed final sign-off Feb 2021 | 390 01st St | Swinerton Builders | to erect 14 stories, 3 basements, type i-a, 180 multi-family units, mixed use building. (r-2,b,s) ** maher: n/a **Details
to erect 14 stories, 3 basements, type i-a, 180 multi-family units, mixed use building. (r-2,b,s) ** maher: n/a ** | $65,000,000 |
| Aug 27, 2013 | Completed final sign-off Jun 2016 | 386 01st St | Build Group Inc. | replace loose ground material not suitable for permeation grouting with lean mix concrete. this work is in tandem with work on approved pa# 2013/04/15/4585 & project site approved pa# 2010/09/14/0800.Details
replace loose ground material not suitable for permeation grouting with lean mix concrete. this work is in tandem with work on approved pa# 2013/04/15/4585 & project site approved pa# 2010/09/14/0800. | $15,000 |
| Apr 15, 2013 | Completed final sign-off Jun 2016 | 386 01st St | Build Group Inc. | tiebacks as a result of adjacent new construction 45 lansing street project. (ref approved pa# 2010/09/14/0800)Details
tiebacks as a result of adjacent new construction 45 lansing street project. (ref approved pa# 2010/09/14/0800) | $100,000 |
| Sep 16, 2008 | Completed final sign-off Apr 2009 | 390 01st St | Tait Environmental Services Inc | install enhanced vapor recovery system as per california state mandate with instore diagnostic system.Details
install enhanced vapor recovery system as per california state mandate with instore diagnostic system. | $17,000 |
| Aug 24, 2007 | Expired or cancelled withdrawn May 2009 | 390 01st St | Cannon Constructors North Inc | underpinning as a result of adjacent, new construction @ 45 lansing appl#200508311745/s.Details
underpinning as a result of adjacent, new construction @ 45 lansing appl#200508311745/s. | $175,000 |
| Mar 24, 2006 | Never finaled issued Mar 2006, no final | 390 01st St | proposed handicapped parking space, upgrade restroom (public) to meet ada complianceDetails
proposed handicapped parking space, upgrade restroom (public) to meet ada compliance | $15,000 | |
| Dec 15, 2004 | Never finaled issued Feb 2005, no final | 390 01st St | to erect a single faced electrical wall signDetails
to erect a single faced electrical wall sign | $5,000 | |
| Dec 15, 2004 | Expired or cancelled expired Jun 2008 | 390 01st St | to erect sign - a non-electric single faced sign on (e) canopyDetails
to erect sign - a non-electric single faced sign on (e) canopy | $5,000 | |
| Aug 19, 2004 | Never finaled issued Feb 2005, no final | 390 01st St | to erect a double faced electrical ground signDetails
to erect a double faced electrical ground sign | $40,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Swinerton Builders (9), Insign Electric (3), Instant Neon (3), Build Group Inc. (2), Horizon Retail Construction Inc (2), Pribuss Engineering Inc (2), Cannon Constructors North Inc, Convergint Technologies Llc, Drill Tech Drilling & Shoring Inc, Granite Excavation & Demolition Inc, Tait Environmental Services Inc
- Architects
- Thomas P Cox (4), Frederick Goglia, Roy Pedro, Theodore G. Garcia
- Engineers
- Stephen Mccullough (2), Chris Wolschlag, Kevin O'connel, Robert Queathem, Salvatore Italiano
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.