Permit GraphShortlistSan Francisco building permits since 2000

Stephen Mccullough

License
C66618
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C66618 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Drill Tech
Based in
Antioch
On San Francisco permits
Aug 2016 to May 2024

10 permits since 2000 (engineer on 8 permits, architect on 2 permits): 10 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Swinerton Builders (9), Drill Tech Drilling & Shoring Inc, Granite Excavation & Demolition Inc
Engineers
Lori Simpson

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 7, 2024Completed
final sign-off Jul 2025
200 Folsom StSwinerton Builderspriority process mayoral dir 17-02: deferred permit for 2022-0801-9628, for a 151 unit, 84'-10" tall building, 100% affordable. shoring for cistern installation about 9ft deep, with 28 ft long steel soldier piles with wood lagging. ch fatty clay at 14ft to 20ft, in liquefaction.
Details
Permit
202405071550
Permit issued
Jun 4, 2024
Final sign-off
Jul 17, 2025

priority process mayoral dir 17-02: deferred permit for 2022-0801-9628, for a 151 unit, 84'-10" tall building, 100% affordable. shoring for cistern installation about 9ft deep, with 28 ft long steel soldier piles with wood lagging. ch fatty clay at 14ft to 20ft, in liquefaction.

Open the permit page

$148,467
Feb 24, 2023Completed
final sign-off Oct 2024
900 Innes AvSwinerton Builderspriority process - 1. the existing cottage is to be jacked up and temporarily supported. 2. temporary shoring under and adjacent to the cottage is to be installed. this work is to take place at the cottage which already has an existing permit, pa # 202103237136.
Details
Permit
202302242559
Permit issued
Jun 18, 2024
Final sign-off
Oct 29, 2024

priority process - 1. the existing cottage is to be jacked up and temporarily supported. 2. temporary shoring under and adjacent to the cottage is to be installed. this work is to take place at the cottage which already has an existing permit, pa # 202103237136.

Open the permit page

$590,000
Jan 19, 2018Completed
final sign-off Jun 2021
720 Powell StSwinerton Builderstieback encroachment form work at 750 powell (pa # 201712136383) temp shoring and excavation to accomodate for new construction at 770 powell/875 california. maher na
Details
Permit
201801199096
Permit issued
Feb 26, 2018
Final sign-off
Jun 2, 2021

tieback encroachment form work at 750 powell (pa # 201712136383) temp shoring and excavation to accomodate for new construction at 770 powell/875 california. maher na

Open the permit page

$1,000
Dec 13, 2017Completed
final sign-off Jun 2021
875 California StSwinerton Builderstemporary shoring and excavation to prepare site for new construction under 201603091627
Details
Permit
201712136394
Permit issued
Feb 26, 2018
Final sign-off
Jun 2, 2021

temporary shoring and excavation to prepare site for new construction under 201603091627

Open the permit page

$50,000
Dec 13, 2017Completed
final sign-off May 2020
720 Powell StSwinerton Builderstemporary shoring and excavation to accomodate new construction at 770 powell/875 california
Details
Permit
201712136382
Permit issued
Feb 26, 2018
Final sign-off
May 18, 2020

temporary shoring and excavation to accomodate new construction at 770 powell/875 california

Open the permit page

$50,000
Dec 13, 2017Completed
final sign-off Jun 2021
770 Powell StSwinerton Builderstemporary shoring and excavation to accomodate new construction at 770 powell/875 california maher req; bpa#201603091627
Details
Permit
201712136393
Permit issued
Feb 26, 2018
Final sign-off
Jun 2, 2021

temporary shoring and excavation to accomodate new construction at 770 powell/875 california maher req; bpa#201603091627

Open the permit page

$50,000
Apr 21, 2017Completed
final sign-off Feb 2021
390 01st StDrill Tech Drilling & Shoring Inc, Swinerton Buildersshoring for new construction. ref pa #2016-0127-8125s. ** maher: disturbance of at least 50 cu.yd of soil. route to dph **
Details
Permit
201704214576
Permit issued
May 25, 2018
Final sign-off
Feb 9, 2021

shoring for new construction. ref pa #2016-0127-8125s. ** maher: disturbance of at least 50 cu.yd of soil. route to dph **

Open the permit page

$912,165
Apr 21, 2017Completed
final sign-off Jan 2020
390 01st StGranite Excavation & Demolition Inc, Swinerton Buildersref pa #2016-0127-8125s. install soil shoring walls on (3) sides of the project (lansing, 1st & harrison st) & excavate down to allow the foundation to be installed during the excavation underground fuel tanks will be removed (under seperate permit) ** maher: yes, route to dph **
Details
Permit
201704214580
Permit issued
May 25, 2018
Final sign-off
Jan 15, 2020

ref pa #2016-0127-8125s. install soil shoring walls on (3) sides of the project (lansing, 1st & harrison st) & excavate down to allow the foundation to be installed during the excavation underground fuel tanks will be removed (under seperate permit) ** maher: yes, route to dph **

Open the permit page

$1,739,679
Dec 14, 2016Completed
final sign-off Mar 2018
240 Pacific AvSwinerton Builderstemporary shoring and excavation
Details
Permit
201612144923
Permit issued
Jan 4, 2017
Final sign-off
Mar 23, 2018

temporary shoring and excavation

Open the permit page

$250,000
Aug 10, 2016Completed
final sign-off Dec 2016
1201 Bryant Stdeferred micropile submittal, refrence structural drawing, application #2016-05-12-7270. scope of work: install 12 micropiles. maher ordinance 155-13 not required.
Details
Permit
201608104687
Permit issued
Aug 11, 2016
Final sign-off
Dec 1, 2016

deferred micropile submittal, refrence structural drawing, application #2016-05-12-7270. scope of work: install 12 micropiles. maher ordinance 155-13 not required.

Open the permit page

$220,000