- 0 permits filed
15 permits since 2000: 11 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2024 | Completed final sign-off Nov 2024 | 1635 Divisadero St | revision to 202212229020. correct and clarify incorrect hazardous classified information at med gas room shown on elec sheet note 2. medical gas stored at med gas room (oxygent and nitrous oxide is not identified as flammable anesthtics per code definition and not listed on explosion control req perDetails
revision to 202212229020. correct and clarify incorrect hazardous classified information at med gas room shown on elec sheet note 2. medical gas stored at med gas room (oxygent and nitrous oxide is not identified as flammable anesthtics per code definition and not listed on explosion control req per | |
| Jun 12, 2024 | Completed final sign-off Nov 2024 | 1635 Divisadero St | revision to bpa# 202212229020. reroute fuel oil line from exterior facade to run through interior of garage. ref delta 13Details
revision to bpa# 202212229020. reroute fuel oil line from exterior facade to run through interior of garage. ref delta 13 | |
| May 23, 2024 | Completed final sign-off Nov 2024 | 1635 Divisadero St | revision to bpa#202212229020. structural revision, revise concrete mix table, revise details for low concrete strength at housekeeping pads. revise anchorage details. ref delta 12Details
revision to bpa#202212229020. structural revision, revise concrete mix table, revise details for low concrete strength at housekeeping pads. revise anchorage details. ref delta 12 | |
| Apr 19, 2024 | Completed final sign-off Nov 2024 | 1635 Divisadero St | revision to 202212229020. work on 2nd fl reduced to vacuum room only. on 5th fl, revision includes: signage, card readers, adding speakers, changing occupied patio to non-occupied roof. revised occupant load. electrical revision to lighting & other relevant revisionsDetails
revision to 202212229020. work on 2nd fl reduced to vacuum room only. on 5th fl, revision includes: signage, card readers, adding speakers, changing occupied patio to non-occupied roof. revised occupant load. electrical revision to lighting & other relevant revisions | |
| Nov 1, 2023 | Completed final sign-off Nov 2024 | 1635 Divisadero St | revision to pa# 202212229020 r3, revise single line diagram to reflect removal of ground floor temporary generator connection point per ca elec code exemption from scope.Details
revision to pa# 202212229020 r3, revise single line diagram to reflect removal of ground floor temporary generator connection point per ca elec code exemption from scope. | |
| Dec 22, 2022 | Completed final sign-off Nov 2024 | 1635 Divisadero St | 5th fl ti scope is approx 7500 sf. includes 2 operating rooms, sterile processing dept and support spaces that include perioperative and recovery bays as well as adminstrative support. upgrade utilitys include replace emergency generator, air handling unit, med gas holding, replace vac pump 2nd flDetails
5th fl ti scope is approx 7500 sf. includes 2 operating rooms, sterile processing dept and support spaces that include perioperative and recovery bays as well as adminstrative support. upgrade utilitys include replace emergency generator, air handling unit, med gas holding, replace vac pump 2nd fl | $8,928,330 |
| Nov 10, 2022 | Completed final sign-off Feb 2025 | 1635 Divisadero St | demo only per ab-017 minor demo work 2nd floor, demo 5th floorDetails
demo only per ab-017 minor demo work 2nd floor, demo 5th floor | $15,000 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 360 Spear St | re-route existing chilled water piping from 5th fl to 1st fl. move & or relocate electrical cabeling & generator annuciators. work include disconnect of several electrical panels. maher naDetails
re-route existing chilled water piping from 5th fl to 1st fl. move & or relocate electrical cabeling & generator annuciators. work include disconnect of several electrical panels. maher na | $199,000 |
| Dec 7, 2016 | Completed final sign-off Apr 2017 | 333 Market St | 3/f- demo and remove acoustical celing, floor tile and misc equipment from the 3rd fl of 333 market st. demo will be out of verizon tenant suite only. sprinklers and fire alarm under separate. n/a ordinance #155-13Details
3/f- demo and remove acoustical celing, floor tile and misc equipment from the 3rd fl of 333 market st. demo will be out of verizon tenant suite only. sprinklers and fire alarm under separate. n/a ordinance #155-13 | $80,000 |
| Jun 16, 2015 | Completed final sign-off Sep 2015 | 360 Spear St | rev. to 201503312335 - install new door at 5th floor, add elevated platforms, adjust elevator stops at 3rd & 4th floor. fire alarm separte permit to move devices n/a for maher.Details
rev. to 201503312335 - install new door at 5th floor, add elevated platforms, adjust elevator stops at 3rd & 4th floor. fire alarm separte permit to move devices n/a for maher. | $80,000 |
| Mar 31, 2015 | Completed final sign-off Sep 2015 | 360 Spear St | this is a permit for demo of t.i.space only.360 spear street is currently a verizon wireless office and server storage facility.unger will be safeoff bldg power, removing lighting,walls,raised floors,mech.units on the 3rd and 4th floors.provide new elec conduit on 3&4 flr. remain vacancy under ab017Details
this is a permit for demo of t.i.space only.360 spear street is currently a verizon wireless office and server storage facility.unger will be safeoff bldg power, removing lighting,walls,raised floors,mech.units on the 3rd and 4th floors.provide new elec conduit on 3&4 flr. remain vacancy under ab017 | $495,000 |
| Nov 10, 2009 | Never finaled issued Nov 2009, no final | 450 Mission St | roof level-remove from roof the following equipment: 2 each generators with exhaust, 1 each day tank, 1 each battery charger & batteries. generator to be removed do not support any building life safety. equipment currently inside penthouse, penthouse to remain.Details
roof level-remove from roof the following equipment: 2 each generators with exhaust, 1 each day tank, 1 each battery charger & batteries. generator to be removed do not support any building life safety. equipment currently inside penthouse, penthouse to remain. | $30,000 |
| Sep 25, 2003 | Completed final sign-off Mar 2004 | 360 Spear St | rerouting of elec/plumbing/piping to isolate 2/f. (currently mci space to be turned over to bldg.)Details
rerouting of elec/plumbing/piping to isolate 2/f. (currently mci space to be turned over to bldg.) | $313,000 |
| Mar 27, 2002 | Expired or cancelled cancelled Feb 2003 | 333 Market St | 3/fl.- battery room exhaust fanDetails
3/fl.- battery room exhaust fan | $10,000 |
| Dec 20, 2001 | Expired or cancelled expired Mar 2005 | 333 Market St | install two hvac units at 3rd floor, install one roof top fan unitDetails
install two hvac units at 3rd floor, install one roof top fan unit | $600,000 |